If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Delhi Jal Board - DJB Tender
Pipes and Pipe Related Activities
Eprocure
Opening Date23 Dec 2020
Closing Date30 Dec 2020
Tender Amount₹ 7,15,200 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 19,500Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Nit No.13, Item No.01 (2020-21)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_DJB_197800_1Bid Award Id
ViewTender No
NIT NO.13 (2020-21)WW-IITender Authority
Delhi Jal Board ViewPurchaser Address
-Website
http://http://delhijalboard.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.2.6.1 All kinds of soil cum
111.96
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth4.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) cum
9.08
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for :5.9.1 Foundations, footings, bases of columns, etc. for mass concrete sqm
16.8
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for : 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts sqm
13.28
-
-
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) cum
20.94
-
-
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) cum
3.1
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.3 Cold twisted bars Kg
3005
-
-
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. kg
1130.21
-
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. cum
81.94
-
-
... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work sqm
36.31
-
-
... More
Cement concrete pavement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete. cum
5.28
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.8 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) cum
4.23
-
-
... More
0011 Hire charges of Pump set of capacity 4000 litres/hour day +15%cp