Delhi Jal Board Tender

If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

Delhi Jal Board - DJB Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date8 Feb 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Nit No. 20, Item No.04 (2023-24)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Replacement of 11 KV HT and 0.44 KV insulator Bushing.

1

-

-

... More
Replacement of silica gel as required.

1

-

-

... More
Providing of transformer oil Make: Servo/BPL/HP or as per DJB approved.

1045

-

-

... More
Replacement of winding protection pads.

1

-

-

... More
Automated filtration & dehydration of Transformer oil.

1

-

-

... More
Replacement of top cover gasket & insulator gasket oil seal for stopping the leakage.

1

-

-

... More
Repairing of cooling fins. Brazing the fins for stopping the oil leakages.

1

-

-

... More
Painting of complete transformer as required.

1

-

-

... More
Top up of oil, Assembling /fitting of the above parts by tri-pod chain pulley or crane from the transformer i/c making connection HT/LT sides after degreasing and removing dust/oil from the external surface of transformer, cooling fins for natural cooling & testing with provision of necessary barriers, warning signals and other safety measures during execution of work. Di-electric Testing, Complete testing on load at site.

1

-

-

... More
Dehydration/servicing of 990 KVA transformer at Chandrawal WW I by carrying out the following Jobs Disconnection of transformer 990 KVA by de-energize from power supply, disconnecting the incoming /out going HT cables connection and tapping the connection leads with craft tape.Removing the top cover ,oil tank, silica gel breathers etc.

4

-

-

... More
Draining the complete oil of transformer in empty drums by machine.

4

-

-

... More
Removing of sludge from the tank & cleaning the core & winding of HT & LT side by hot oil vacuum machine.

4

-

-

... More
Replacement of 11 KV HT and 0.44 KV insulator Bushing.

4

-

-

... More
Replacement of silica gel as required.

4

-

-

... More
Replacement of winding protection pads.

4

-

-

... More
Automated filtration & dehydration of Transformer oil.

4

-

-

... More
Replacement of top cover gasket & insulator gasket oil seal for stopping the leakage.

4

-

-

... More
Repairing of cooling fins. Brazing the fins for stopping the oil leakages.

4

-

-

... More
Painting of complete transformer

4

-

-

... More
Top up of oil, Assembling /fitting of the above parts by tri-pod chain pulley or crane from the transformer i/c making connection HT/LT sides after degreasing and removing dust/oil from the external surface of transformer, cooling fins for natural cooling & testing with provision of necessary barriers, warning signals and other safety measures during execution of work. Di-electric Testing, Complete testing on load at site.

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.