Delhi Development Authority Tender

If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.

Delhi Development Authority - DDA Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date15 Jan 2025
Closing Date21 Jan 2025
Tender Amount₹ 23,84,643 
Notes
Download

Costs

Summary

M/o Various Schemes Under Na-ii (east Zone).

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)

82.55

7370

608447.16

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand)

74.75

9344

698490.16

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: .1:2:4 (1 Cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)

7.19

9895

71146.49

... More
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)

312.5

333

104171.88

... More
15 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)

312.5

383

119687.5

... More
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: (a) New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)

625

171

106937.5

... More
Finishing walls with Acrylic Smooth exterior paint of required shade : (a) Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface

144

120

17388

... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

306

172

52815.6

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : (a) One or more coats on old work

28.8

102

2960.64

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : (a) Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture

11

226

2488.75

... More
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron Y shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5 mm thick) wire of high tensile strength of 165 kg/ sq. mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)

125

375

46975

... More
Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured): (a) In cement mortar

26

689

17919.2

... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with (Stone for masonary shall be supplied by the department free of cost available at site):(a) Cement mortar 1:6 (1 cement : 6 coarse sand)

26

5532

143856.7

... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.

134

119

16073.3

... More
Depositing the charge for disposal of moorum/building rubbish/Stone malba/ similar unserviceable, dismantled or waste material to approved municipal dumping ground i.e. C&D waste plant Shastri park/Jahangirpuri. (Payment will be made only after submission of the receipt issued by C&D waste management plant).

134

444

59496

... More
Amount after GST Reduction Factor @(0.973)

2320065.73

-

2257423.96

... More
Add @3% cost index

2257423.96

-

67722.72



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.