Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

1 A C NIL D OW A.E(.P) E.E.(P)/CC-17 INDEX S. No Description Page 1 E-tender Press Notice. 3 2 Notice Inviting Tender Form for e-Tendering 6 3 Instruction for Online Bid Submission 13 4 Tender Acceptance Letter 17 5 Percentage rate tender and contract form 18 6 General Rules and Directions 20 7 Conditions of Contract 24 8 Clauses of Contract 27 9 Integrity Pact 94 10 Safety Code 101 11 Model Rules 106 12 Contractor’s Labour Regulations 112 13 Sketch of Cement Godown 140 14 General Specifications 141 15 Annexure to Clause(x) 156 16 Special Conditions 160 17 Direction of Hon’ble NGT & Manual Guidance 187 18 ADDITIONAL CONDITIONS 189 19 Schedule-A to F 197 20 Form of performance security (Guarantee) Bank Guarantee Bond (Annexure-I) 205 21 Guarantee bond to be executed by contractor for damage to structure and water proofing as well as leakage (Annexure-II) 207 22 Schedule of Quantities 209 2 A C NIL D OW A.E(.P) E.E.(P)/CC-17 Instruction to the Executive Engineer by NIT approving authority forming part of NIT & not to be posted on website. The Executive Engineer shall attend to the following points before uploading the tender document on website. i) Any discrepancy in the approved NIT, if noticed, shall immediately be brought to the notice of the Officer preparing NIT for necessary decision of the officer approving the NIT. ii) All blanks shall be filled in by The Executive Engineer before uploading the tender on website. iii) The Tender documents should properly be page numbered by the Executive Engineer before uploading the tender on website. iv) The Executive Engineer to ensure that Tender document is clearly readable. v) The reference to standing order numbers indicated in the correction slips and cross references shall not appear in the tender uploaded on the website. vi) Executive Engineer must ensure that before call of tender all architectural and structural Drawings good for construction are made available to the contractors for their study and understanding the scope of work covered by this tender. vii) Executive Engineer shall delete clause 31A regarding water supply, if so required. viii) Requirement of registration and other eligibility criteria shall be suitably incorporated in the press notice by the Executive Engineer/ NIT approving authority before issue. ix) All codal provisions and CPWD Manual 2014 may be attended before call of tender including instructions issued by EM./DDA while according A/A & E/S to the work. x) All services such as sewerage, water supply and drainage shall be got approved from DJB / MCD before execution of work. xi) Executive Engineer must ensure that condition laid down by Dy. C.A.O (Plan) while issuing financial concurrence to the work are complied before call of tender. xii) Executive Engineer must ensure that before calling / uploading the tender document on website he should fill up the base price of cement and steel reinforcement bars in clause-10 CA of schedule – F. xii) Executive Engineer must also fill up the recovery rate for quantities beyond permissible variation (i.e. for less use to the acceptable extent ). ( NOT TO BE UPLOADED )

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.