Delhi Development Authority Tender
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Delhi Development Authority - DDA Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date8 Nov 2024
Closing Date13 Nov 2024
Tender Amount₹ 18,16,710
Costs
EMD
₹ 36,334Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
M/o Completed Scheme Under Na-ii Hort. Zone.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DDA_834184_1Bid Award Id
ViewTender No
95/EE/HCD-10/DDA/2024-25Tender Authority
Delhi Development Authority ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
14
2434
34080
... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
4.54
3551
16123
... More
Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres. With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
172
194
33420
... More
R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately).
14.4
32891
473633
... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).
0.41
10117
4148
... More
Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
140
39
5509
... More
Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer -in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost).
80
109
8756
... More
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of spring core 2.5 mm thick wire of high tensile strength of 165 Kg./sq.mm with tape 0.52 mm thick and weight 43.478 gm/metre, between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of RBT used.
5531
17
97899
... More
Desilting of ghat by manual as per site condition and disposal of the same within site area as per direction of Engineer-in-charge i/c ramming of disposed silt/soil and all its T&P necessary as per site requirement and as per direction of Engineer-in-charge. (Note:- Work will be done by Manual only)
1662.5
168
279300
... More
Correction factor 0.973)
1
-50412
-50412
... More
Note:
1) Contractor shall follow the relevant NGT, DPCC orders, and or any other govt. authority enforcing environmental and pollution control orders and if any fine/penalty/challan is imposed by any government agency, the cost of the same shall be solely borne by the contractor.
-
-
1816710
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements