Public Works Department Tender
View complete overview of Daman & Diu PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date21 Feb 2025
Closing Date7 Mar 2025
Tender AmountRefer Documents
Costs
EMD
₹ 11,730Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DAMAN_4063_1Tender No
26/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://ddtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation for foundation up to 1.5 mt. Depth including sorting out and stacking of useful materials and disposing of the excavated stuff up to 50 meter lead. ( B ) Dence or Hard Soil
51.3
-
-
... More
Providing and filling in foundation & plinth with Rubble stone Soling in layer of 20 cm thickness including watering , ramming and consolidating etc.comp.
5.47
-
-
... More
Providing and laying Cement Concrete 1:3:6 (1 Cement : 3 coarse sand : 6 hand broken stone aggregates 40 mm nomial size) and curing complete excluding cost of form work in (more than 10 ton).
5.28
-
-
... More
Providing formwork of ordinary timber plankings so as to give a rough finish including centering,shuttering, struting and propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ concrete and plain concrete work in (A) Foundations, footings, bases of columns etc. and mass concrete. (upto 10 top)
15.73
-
-
... More
Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass concrete (upto 10 ton)
4.62
-
-
... More
Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (G) Columns PillarsPosts and struts. (1) Square Rectangular Polygonal in plan. (upto 10 ton)
60.42
-
-
... More
Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (D) COLUMNS, Pillars posts and struts upto floor two level.
3.93
-
-
... More
Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (H) (1) Sides and soffits of Beams Beam Haunchings cantilevers Girders Bressumers and Lintels not exceeding 1 M. in Depth. (upto 10 ton).
57.3
-
-
... More
Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (C) Slabs, landing, shelves, Balconies Lintels, Beams, Girders and Cantilever upto floor two level. (upto 10 ton)
6.59
-
-
... More
Proving TMT bar FE 500D reinforcement for R.C.C. work including bending, binding and placing in position complete up to floor two level (upto 10 ton)
1892.44
-
-
... More
Providing fusion bonded Epoxy coating not less than 175 micron thickness and up to 300 micron to reinforcement bars as per IS-13620-1993/ASTM-775 M including testing of coating at plant and all taxes (A) 10mm to 16mm dia bar
1.89
-
-
... More
Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in above plinth in Cement Mortar 1:6 (1- Cement : 6 -fine sand)(A) Modular (upto 10 ton)
22.97
-
-
... More
Providing 20 mm thick double coat mala cement plaster on interior brick / concrete work for plastering comprising of base coat of 12mm thick cement plaster in cement mortar (1 Cement : 4 coarsesand) in roughfinishing and 8 mm thick top coat of cement mortar 1:2 (1 Cement : 2 Coarse sand) finished with trovel includingscaffolding curing etc. complete.
245
-
-
... More
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved brand and manufacture and of required shape even shade after thoroughly brushing the surface to remove all dirt and remains of loose powered materials.
482.5
-
-