Forest Department Tender

Take tender evaluation notes for Daman & Diu Forest Department Tender

Forest Department Tender

Agriculture or Forestry Works
Eprocure
Opening Date22 Jul 2023
Closing Date3 Aug 2023
Tender Amount₹ 62,59,569 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing material and labour for filling in plinth, floor, pathway 75MM THK Stone grit 6mm to 10mm including filling in gaps and consolidating deposited layers etc. Complete.

2475

-

-

... More
Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level (upto 10 ton)

22285.46

-

-

... More
Providing laying (to level or slopes) and jointing reinforced concrete Light duty non-pressure pipes I.S. class NP2 of the following internal diameter with collars and butt ends prepared for collar joints including testing of joints complete.(C) 250mm (upto 10 ton)

97.5

-

-

... More
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- hand broken stone aggregates 40 mmnominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth (upto 10 ton)

74.29

-

-

... More
Providing material and labour for filling in foundation and plinth with RUBBLE under floors including filling gravel in gaps and consolidating deposited layers by ramming water etc. Complete.

470.58

-

-

... More
Providing material and labour for laying controlled cement concrete M.250 and curing complete including the cost of formwork with sheathing steel but excluding reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass concrete, as directions of Engineer in charge Complete..

118.8

-

-

... More
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil

1041.9

-

-

... More
Suppliying of graded stone aggregate of following sizes (for W.B.M. Road)(3) Crushed stone aggregate for Hard Quality up to 63 mm stze & Spreading the stone aggregate for rolling and W.B.M. for 230 mm compacted to 150mm including filling the interstices to required camber and gradient (excluding spreading of Blindage)(ii) 40mm to 63mm size aggreagates (H.B.),

600.3

-

-

... More
Supplying & spreading of graded stone aggregates, of following sizes (for W.B.M. Road)(1) Hand broken stone aggregate for Hard Quality of 25mm to 90mm size

434.7

-

-

... More
Rolling and consolidating water bound macadam (except laterite and Kankar) including watering not exceeding 150mm thickness (Main layer including binding materials ) including filling in depressions which occur during the process.(A) With power roller exceeding 8 tonne and not exceeding 12 tonne

2475

-

-

... More
Providing material and labour for laying controlled cement concrete M.250 and curing complete including the cost of formwork with sheathing steel, providing weep holes and excluding the Cost of reinforcement for reinforced concrete work in (D), Columns, Pillars posts and struts upto floor two level. etc complete as directed by Engineer-incharge.

113.78

-

-

... More
Rolling of earthwork in layers with power roller including filling in depressions which occur during the process. (upto 10 ton)

1631.99

-

-

... More
Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering.

800

-

-

... More
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(E) Hard Rock

540

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.