Airports Authority Of India Tender
View complete overview of Daman & Diu AAI Tender
Airports Authority Of India - AAI Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date22 Dec 2023
Closing Date12 Jan 2024
Tender Amount₹ 48,68,550
Costs
EMD
₹ 97,371Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_AAI_178863_1Bid Award Id
ViewTender No
AAI/DIU/AGM (E-C)/BWALL/W-21/E-NIT/2023-24Tender Authority
Airports Authority Of India ViewPurchaser Address
-Website
http://https://www.aai.aero/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers
183
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
3500
-
-
Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
2250
-
-
15 mm cement plaster on the rough side of single or half brick wall of mix :
1:4 (1 cement: 4 fine sand)
1720
-
-
Finishing walls with Acrylic Smooth exterior paint of required shade :
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
1720
-
-
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work sqm
100
-
-
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
34
-
-
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
60
-
-
Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in:
Channels, angles, tees and flats
2180
-
-
Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead.
1270
-
-
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
100
-
-
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
With G.I. barbed wire
4500
-
-
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
850
-
-
Ready Made Cement Concrete block in course in foundation and plinth of approved quality in Cement Mortar 1:6 (1-Cement : 6- Coarse sand) including packing the joints etc. Complete.
86
-
-
Ready Made Cement Concrete block in course in Superstructure of approved quality in Cement Mortar 1:6 (1-Cement : 6- Coarse sand) including packing the joints etc. Complete.
135
-
-