Water Resources Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

Water Resources Department - WRD Tender

Works
Civil And Construction
Irrigation Work
Opening Date10 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 2,51,13,398.49 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

218.57

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

3612.11

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

42.75

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

583.64

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

35068.75

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

1.8

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

2794.42

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

194.69

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

37.5

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

108

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

19.39

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

438.49

147

1004178.15

... More
Excavation in all type of soil, (i.e. soft soil, hard soil and hard moorum) moorum and moorum with boulder for foundation of structure etc. utilization of useful material obtained from excavation and disposal of unuseful material to rquired places including laying, dressing etc. complete in all respect with all leads and lifts of all materials and as per drawing, specification and as directed by the Engineer-in-charge.

3

147

1004178.15



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.