Water Resources Department Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.
Water Resources Department - WRD Tender
Civil And Construction
Water Storage And Supply
Opening Date26 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 2,37,90,831.96
Costs
EMD
₹ 1,50,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
163067Tender No
163067Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.cgstate.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and placing in position cement concrete of M-20 grade with 20 mm graded stone ballast including mechanical mixing, form work, finishing, vibration, curing for 28 days, cleaning etc. complete including all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
0.08
5511
440.95
... More
Supplying and fixing steel reinforcement (cold worked steel high strength bars conforming to grade Fe-415 of I.S. 1786 etc.) for R.C.C. including cleaning, straightening, cutting, bending, all handling, placing in position and binding with 0.9 mm annealed binding wire confirming to SI: 280-1978 complete including all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
0.02
59950
1199
... More
Providing and filling foundations and around masonry works with materials obtained from spoils including watering and ramming etc. complete including all lead, lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
255.51
90
23001.01
... More
Providing collection of hard moorum with stacking and boxing, spreading including water for compaction at optimum moisture content etc. complete including all lead, lifts and cost of all materials and as per drawings, specification and as directed by the Engineer-in-Charge.
327.72
458
150210.46
... More
Providing fixing in the position NP2 hume pipes 150 mm dia for bridges and canal structures including handling, toeing, filling the joints with filler materials and cement mortar 1:3 curing etc. complete including all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
8
433
3468
... More
Excavation in different types of soil and rocks in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement including dressing to the profile and disposal or excavated materaisl etc. complete including all lead, all lifts and cost of all materials and as per design, drawings, specification and as directed by Engineer-in-Charge.
69.76
102
7181.79
... More
Tamping in canal bed and side including saturation upto 30 cm depth for preparation of earthen sub-grade before laying in-situ cement concrete lining etc. complete including all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
2984.85
18
54324.27
... More
Providing and fixing in position LDPE film of 150 micron (0.15 mm) ISI mark 2508 (Grade 231), including heat-sealed joints at ends as per IS: 9698 all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
3134.09
32
101857.92
... More
Providing and placing in position cement concrete of M-15 grade with 20 mm graded stone ballast for in-situ lining in canal bed including mechanical mixing, form work for laying in panels, vibration, finishing, making grooves as per IS: 3873, finishing curing for 28 days, cleaning etc. complete including all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
28.4
4297
122062.06
... More
Providing and placing in position cement concrete of M-15 grade with 20 mm graded stone ballast for in-situ lining in canal side slopes and curvature including mechanical mixing, formwork for laying in pannels, screeding the surface of side slopes with winch operated slip form, finishing making grooves as per IS:3873, finishing, vibration curing for 28 days by constructing brick masonry drains with weep holes or perforated pipes on the coping at the top of lining or by sprinklers, cleaning etc. complete including all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
241.18
5854
1411874.96
... More
Providing and placing in position cement concrete 1:2:4 with 40 mm graded stone ballast for in-situ sleepers including mechanical mixing, form work, vibration, finishing, curing, cleaning etc. complete including all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
62.78
5302
332917.95
... More
Providing and placing in position cement concrete 1:2:4 with 40 mm graded stone ballast for safety ladder IS: 3873 including mechanical mixing, form work, vibration finishing making 10 mm wide grooves, curing, cleaning etc. complete including all lead, all lifts and cost of all materials as per design, drawings, specifications and as directed by Engineer-in-Charge.
13.21
5027
66411.95
... More
Filling contraction joints (grooves) of 20 mm depth as per IS: 3873 with hot applied sealing compound IS: 5256 including cleaning and washing grooves, painting its inner surfaces with primer IS: 3384 at the rate of 1 litre per 4 sqm inclusive of cost of all materials in-situ concrete lining etc. complete including all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
607.99
33
20550.06
... More
Excavation in hard soil for diversion road of structure including, dressing watering, and compaction of earthwork at optimum moisture content to maximum dry density (i) By D.R.R. or S.R.R. of 8 tonnes or more etc. complete including all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
1431
177
254288.7
... More
Collection of hard moorum with stacking and boxing, spreading including dressing etc. complete including all lead, lifts and cost of all materials and as per drawing, specification and as directed by the Engineer-in-Charge.
1005.75
394
396959.47
... More
Earth work for bund and for canal banks needing dam specification in hearting or casing with approved soils, including dressing, breaking of clods, laying in layers of maximum 15 cm thickness, cutting and finishing U/S & D/S slopes of bunds including site clearance, benching the seat of embankment to an average depth of 15 cm and cross slope of 1 in 12 including removing the rubbish, watering and compaction of earth work at optimum moisture content to dry density not below 90% by light rollers i.e. non-powered rollers or sheep foot earth masters or hand rammers with all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
42713.51
210
8972827.05
... More
22 cm thick dry picked up boulder pitching including picking of boulders with individual boulders o 22 cm depth and at least the dimension of boulders in any direction should not be less than 10 cm over 15 cm thick picked up boulder spall etc. complete including all lead, all lifts and cost of all materials and as per design, drawings, specifications and as directed by Engineer-in-Charge.
5528.99
1064
5885886.3