Water Resources Department Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.
Water Resources Department - WRD Tender
Civil And Construction
Opening Date12 Nov 2024
Closing Date5 Dec 2024
Tender Amount₹ 1,34,49,079.45
Costs
EMD
₹ 1,01,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
160842Tender No
160842Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.cgstate.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
59.2
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
9249.25
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
556.08
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
815.57
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
99.9
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
778.48
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
315.6
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
462.88
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
558.19
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
873.64
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
244.6
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
12916.21
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
97.5
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
28.09
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
9
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
8.44
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
8.44
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
915.51
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
1039.5
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
7.5
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
2475
142
1897163.74
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.
2.04
142
1897163.74