Water Resources Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

Water Resources Department - WRD Tender

Works
Civil And Construction
Opening Date12 Nov 2024
Closing Date5 Dec 2024
Tender Amount₹ 1,34,49,079.45 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

59.2

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

9249.25

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

556.08

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

815.57

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

99.9

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

778.48

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

315.6

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

462.88

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

558.19

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

873.64

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

244.6

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

12916.21

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

97.5

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

28.09

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

9

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

8.44

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

8.44

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

915.51

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

1039.5

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

7.5

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

2475

142

1897163.74

... More
Excavation in all type of soil i.e. soft soil, hard soil, hard moorum & moorum mixed with boulder including removal of slush grass twings i/c rooting out complete, benching the seat of embankment of all foreign materials vegetation and other growth like grass roots and spoil bank from spill channel area etc. including removing the rubbish, separation of usefull and unusefull soil and usefull soil used for construction and unusefull soil disposal to the required places including dressing removal of all seepage and other operations required for maintaining cleanliness for construction work and wet excavation etc. complete in all respect with all lead and lift and cost of all material as per drawing, specification and as directed by Engineer_in_ charge.

2.04

142

1897163.74



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.