Water Resources Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Opening Date25 Sep 2024
Closing Date9 Oct 2024
Tender Amount₹ 13,94,67,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

142.52

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

9269.36

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

1328.65

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

4702.21

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

207.93

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

1372.88

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

1111.9

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

950.78

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

498.56

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

58.95

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

76760.01

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

733.59

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

38.34

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

61564.25

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

559

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

5.83

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

53.4

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

89.55

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

323.93

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

15

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

67.5

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

0.48

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

1038.64

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

198

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

5275.2

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

11587.2

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

225.98

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

671.46

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

6

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

43

235

27584494.96

... More
Excavation of all type of strata other than hard rock for formation of canal banks and foundation of structures including Site clearance, Medium shrub jungle clearance including removal of grass,shrubs and twigs including rooting out, separation of serviceable and unserviceable materials and disposal of all material at specified place and re-use for bank formation and other similar work of canal including breaking clods, laying in proper layer of maximum 15cm thickness,cutting and finishing inner and outer slope of bund, Stripping, tamping, dressing , wet excavation, all re-handling with all lead and lift and cost of all materials, transportation charges of all materials including water , tools and plants, labour etc. complete in all respect as per approved drawing, design, specification of Water Resources Department and as directed by the Engineer-in charge

570

235

27584494.96



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.