Water Resources Department Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.
Water Resources Department - WRD Tender
Civil And Construction
Irrigation Work
Opening Date10 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 2,10,77,856.87
Costs
EMD
₹ 1,50,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
159378Bid Award Id
ViewTender No
159378Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.cgstate.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
410.18
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
1531.69
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
123.93
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
3113.98
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
4037.45
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
580.53
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
13.79
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
1423.94
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
153.3
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
48.64
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
22.5
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
120
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
600
132
2538341.13
... More
Excavation in all type of soil i.e. ordinary soil, hard soil, moorum for foundation of structure, for housing of lining sleepers, coping etc. resectioning of canal with dressing transporting the surplus useful materials to diffferent reaches and disposal of surplus un-usefull material to specified spoil banks including site clearence of grass and crops rooting out (barrow area, if required, to be arranged by contractor at his own cost) with wet excavation below sub soil water level etc.complete including all lead, lift and cost of all materials as per specifications and as directed by Engineer-in-charge.
540
132
2538341.13
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements