State Agricultural Marketing Board Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

State Agricultural Marketing Board Tender

Works
Civil And Construction
Road Construction
Opening Date26 Dec 2024
Closing Soon8 Jan 2025
Tender Amount₹ 5,18,400 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
from main gate 2 to center

1350

-

-

... More
from main gate 1 to center

330

-

-

... More
Around covered shed A TO Godown 1

2370.8

-

-

... More
widening around covered shed A

522.27

-

-

... More
widening around covered Godown 1

169.2

-

-

... More
In front of Godown 2

175

-

-

... More
Around covered shed B , Open platform & Godown 3

3735.5

-

-

... More
Patch (1)

1066.5

-

-

... More
Patch (2)

910.08

-

-

... More
In front of Canteen

105

-

-

... More
Excavation in Soil (by Mechanical Means.) Excavation for roadway in soil using mechanical means including loading in tipper for carrying of cut earth to embankment site and unloading with all lifts and lead upto 1000 meters as per relevant clauses of section 300

-

-

-

... More
New road

-

-

-

... More
New Godown

625

-

-

... More
from main gate 2 to center

843.75

-

-

... More
from main gate 1 to center

165

-

-

... More
Around covered shed A TO Godown 1

1481.75

-

-

... More
widening around covered shed A

261.13

-

-

... More
widening around covered Godown 1

84.6

-

-

... More
In front of Godown 2

118.75

-

-

... More
Around covered shed B , Open platform & Godown 3

2334.69

-

-

... More
Patch (1)

533.25

-

-

... More
Patch (2)

455.04

-

-

... More
In front of Canteen

71.25

-

-

... More
Compacting Original Ground supporting embankment Loosening, leveling and compacting original ground to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at O.M.C. and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction.

-

-

-

... More
New road

-

-

-

... More
New Godown

187.5

-

-

... More
from main gate 2 to center

253.13

-

-

... More
from main gate 1 to center

49.5

-

-

... More
Around covered shed A TO Godown 1

444.53

-

-

... More
widening around covered shed A

78.34

-

-

... More
widening around covered Godown 1

25.38

-

-

... More
In front of Godown 2

35.63

-

-

... More
Around covered shed B , Open platform & Godown 3

700.41

-

-

... More
Patch (1)

159.98

-

-

... More
Patch (2)

136.51

-

-

... More
In front of Canteen

21.38

-

-

... More
Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area (Construction of sub-grade with approved material/selected soil having C.B.R.8 (unless specified otherwise in the contract) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)

-

-

-

... More
New road

-

-

-

... More
New Godown W=(11.50+12.40)/2

358.5

-

-

... More
from main gate 2 to center W=(11.50+12.40)/2

483.97

-

-

... More
from main gate 1 to center

99

-

-

... More
Around covered shed A TO Godown 1 W=(11.50+12.40)/2

849.93

-

-

... More
widening around covered shed A

156.68

-

-

... More
widening around covered Godown 1

50.76

-

-

... More
In front of Godown 2 W=(9.40+8.50)/2

67.12

-

-

... More
Around covered shed B , Open platform & Godown 3 W=(11.50+12.40)/2

1339.18

-

-

... More
Patch (1)

319.95

-

-

... More
Patch (2)

273.02

-

-

... More
In front of Canteen W=(9.40+8.50)/2

40.28

-

-

... More
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, , Carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401. A Plant mix method (with Mechanically crushed stone only) (a) For Lower Sub-base with (i) Grading-III Material

-

-

-

... More
New road

-

-

-

... More
New Godown W=(10.9+11.50)/2

224

-

-

... More
from main gate 2 to center W=(10.9+11.50)/2

302.4

-

-

... More
from main gate 1 to center

66

-

-

... More
Around covered shed A TO Godown 1 W=(10.9+11.50)/2

531.06

-

-

... More
widening around covered shed A

104.45

-

-

... More
widening around covered Godown 1

33.84

-

-

... More
In front of Godown 2 W=(7.90+8.50)/2

41

-

-

... More
Around covered shed B , Open platform & Godown 3 W=(10.9+11.50)/2

836.75

-

-

... More
Patch (1)

213.3

-

-

... More
Patch (2)

182.02

-

-

... More
In front of Canteen W=(7.90+8.50)/2

24.6

-

-

... More
Providing and laying cement concrete for plain concrete/ reinforced P.C.C. M-30 concrete i/c form work, shuttering complete in as per drawings and specifications.( For Village roads)

-

-

-

... More
Levelling course

371.84

-

-

... More
New road

-

-

-

... More
New Godown

300

-

-

... More
from main gate 2 to center

405

-

-

... More
from main gate 1 to center

99

-

-

... More
Around covered shed A TO Godown 1

711.24

-

-

... More
widening around covered shed A

156.68

-

-

... More
widening around covered Godown 1

50.76

-

-

... More
In front of Godown 2

52.5

-

-

... More
Around covered shed B , Open platform & Godown 3

1120.65

-

-

... More
Patch (1)

319.95

-

-

... More
Patch (2)

273.02

-

-

... More
In front of Canteen

31.5

-

-

... More
Providing and laying cement concrete for plain concrete/ reinforced P.C.C. M-30 concrete i/c form work, shuttering complete in as per drawings and specifications.( For Village roads)

-

-

-

... More
drain- bottom

12.5

-

-

... More
side wall-

30

-

-

... More
Plain cement concrete complete as per drawing and Technical Specifications PCC Grade M 15

-

-

-

... More
For drain-

110

-

-

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in drain/cover/chamber complete as per Drawing and Technical Specifications.

-

-

-

... More
Construction of RCC drain/chamber cover, placing in position, providing shuttering and concreting by using concrete mixer, compaction by vibration etc complete as per drawings and technical specifications excluding reinforcement. with RCC M-20

-

-

-

... More
Construction of RCC open drainConstruction of RCC open drain 0.60m x 0.60m inside dimension lined with 120 mm thick RCC M-20 walls, 120 mm thick CC M-20 foundation, over 100 mm thick (Av) leveling course in PCC M-15 including excavation , dressing of sides and bottom, provision of HYSD reinforcement consisting 8 mm dia horizontal bars @ 150 mm c/c and L-shaped 8 mm dia vertical bars @ 150 mm c/c (L= 800 mm) including cutting , bending and binding wire, placing in position , providing shuttering and concreting by using concrete mixer, compaction by vibration etc complete as per drawings and technical specifications.

-

-

-

... More
In Front of school-

200

2592

518400

... More
SUB ENGINEER

-

-

-

... More
CG STATE AGRICULTURE MARKETING MANDI BOARD RAIPUR

-

-

-

... More
DIVISION OFFICE RAIPUR

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.