South Eastern Coalfields Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.
South Eastern Coalfields Limited - SECL Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date27 Mar 2023
Closing Date12 Apr 2023
Tender Amount₹ 2,19,59,139
Costs
EMD
₹ 2,74,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Providing Cement Concrete (cc) Pavement To Coal Transportation Roads From Cisf Barrier No. 3 And New Cisf Barrier No. 7 (560 Mtr.) Connecting To Hardi Bazar Road Including 2 Nos Of Rcc Box Culvert At Gevra Project Of Gevra Area. (with 5 Years Compre
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SECL_276517_1Bid Award Id
ViewTender No
SECL/GA/GM(C)/ETN/22-23/169Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing close graded Material, , carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 Plant mix method (with Mechanically crushed stone only) for grading-III Material
952
-
1619.56
... More
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect.
1176
-
2402.69
... More
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
2352
-
4120.47
... More
Add extra in Item No.1.05 above for the cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design. I) Mild steel
21.17
-
54277.85
... More
Add extra in Item No1.05 above for the cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design. ii) Tor steel
2.59
-
56745.05
... More
Item Description/Heading
-
-
-
... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per relevant clauses of section 300 & 2100 in Mechanical Means Depth upto 3 m
147
-
54.75
... More
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with . A) PCC Grade M15
28
-
4328.75
... More
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with . E) RCC Grade M25
120
-
5146
... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications and as per relevant clauses of section 1600.
9.6
-
62405.25
... More
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC/PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
20
-
263.1
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification and as per relevant clauses 305 of specifications and as per appendix 6 of IRC-78. Granular material
68
-
1771
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements