South Eastern Coalfields Limited Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

South Eastern Coalfields Limited - SECL Tender

Works
Environmental Service
Agriculture or Forestry Works
Eprocure
Opening Date22 Jun 2024
Closing Date15 Jul 2024
Tender Amount₹ 63,67,143 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

2839.5

361042

127.15

... More
PACHERI Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.

29.76

5568

187.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)

1.6

8005

5003.7

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size)

24.96

139163

5575.45

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

5.28

1474

279.25

... More
Brick work with flyash brick 230x110x75 mm size in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )

7.14

33180

4647.15

... More
STONE PITCHING Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.

162.5

94363

580.7

... More
PLANTATION Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

9.11

1158

127.15

... More
planting plant on ground with DAP and compost

75

1500

20

... More
plant purchase

75

9000

120

... More
DAP, vermi compost urea, foret lumpsum, transporting

1

7000

7000

... More
Tree guard with local resources such as bamboo etc (lumpsum)

1

8474

8474.58

... More
Information board

1

5000

5000

... More
Village: PURI Devram TALAB Deepening of POND Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.

4550

23887

5.25

... More
Daag Beling

714

428

0.6

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

3186

405099

127.15

... More
PACHERI Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.

37

6922

187.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)

2

10007

5003.7

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size)

31.2

173954

5575.45

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

6.6

1843

279.25

... More
Brick work with flyash brick 230x110x75 mm size in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )

7.14

33180

4647.15

... More
STONE PITCHING Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.

150

87105

580.7

... More
PLANTATION Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

11.54

1467

127.15

... More
planting plant on ground with DAP and compost

95

1900

20

... More
plant purchase

95

11400

120

... More
DAP, vermi compost urea, foret lumpsum, transporting

1

7000

7000

... More
Tree guard with local resources such as bamboo etc (lumpsum)

1

8474

8474.58

... More
Information board

1

5000

5000

... More
Village: PUSALDA KHARRA TALAB Deepening of POND Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.

3025

15881

5.25

... More
Daag Beling

564

338

0.6

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

1993.5

253473

127.15

... More
PACHERI Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.

37.2

6960

187.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)

2

10007

5003.7

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size)

31.2

173954

5575.45

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

6.6

1843

279.25

... More
Brick work with flyash brick 230x110x75 mm size in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )

7.14

33180

4647.15

... More
STONE PITCHING Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.

112.5

65328

580.7

... More
PLANTATION Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

9.11

1158

127.15

... More
planting plant on ground with DAP and compost

75

1500

20

... More
plant purchase

75

9000

120

... More
DAP, vermi compost urea, foret lumpsum, transporting

1

7000

7000

... More
Tree guard with local resources such as bamboo etc (lumpsum)

1

8474

8474.58

... More
Information board

1

5000

5000

... More
Village: PUSALDA GHOGHRA TALAB Deepening of POND Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.

2000

10500

5.25

... More
Daag Beling

444

266

0.6

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

1215

154487

127.15

... More
PACHERI Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.

29.76

5568

187.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)

1.6

8005

5003.7

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size)

24.96

139163

5575.45

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

5.28

1474

279.25

... More
Brick work with flyash brick 230x110x75 mm size in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )

7.14

33180

4647.15

... More
STONE PITCHING Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.

100

58070

580.7

... More
PLANTATION Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer in-charge. 2.6.1 All kinds of soil

9.11

1158

127.15

... More
planting plant on ground with DAP and compost

75

1500

20

... More
plant purchase

75

9000

120

... More
DAP, vermi compost urea, foret lumpsum, transporting

1

7000

7000

... More
Tree guard with local resources such as bamboo etc (lumpsum)

1

8474

8474.58

... More
Information board

1

5000

5000

... More
Vilage: TERAM BANDHA TALAB Deepening of POND Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.

4900

25725

5.25

... More
Daag Beling

744

446

0.6

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

3465

440574

127.15

... More
PACHERI Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.

37.2

6960

187.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)

2

10007

5003.7

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size)

31.2

173954

5575.45

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

6.6

1843

279.25

... More
Brick work with flyash brick 230x110x75 mm size in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )

7.14

33180

4647.15

... More
STONE PITCHING Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.

150

87105

580.7

... More
PLANTATION Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer in-charge. 2.6.1 All kinds of soil

11.54

1467

127.15

... More
planting plant on ground with DAP and compost

95

1900

20

... More
plant purchase

95

11400

120

... More
DAP, vermi compost urea, foret lumpsum, transporting

1

7000

7000

... More
Tree guard with local resources such as bamboo etc (lumpsum)

1

8474

8474.58

... More
Information board

1

5000

5000

... More
Village: Khamhar, Indira Sagar Talab PACHERI Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.

37.2

6960

187.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)

2

10007

5003.7

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size)

31.2

173954

5575.45

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

6.6

1843

279.25

... More
Brick work with flyash brick 230x110x75 mm size in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )

7.14

33180

4647.15

... More
Tree guard with local resources such as bamboo etc (lumpsum)

1

8474

8474.58

... More
Information board

1

5000

5000

... More
Village: TIHLIRAMPUR Deepening of POND Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.

6400

33600

5.25

... More
Daag Beling

714

428

0.6

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

3465

440574

127.15

... More
PACHERI Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.

37.2

6960

187.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)

2

10007

5003.7

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size)

31.2

173954

5575.45

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

6.6

1843

279.25

... More
Brick work with flyash brick 230x110x75 mm size in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )

7.14

33180

4647.15

... More
STONE PITCHING Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.

175

101622

580.7

... More
PLANTATION Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer in-charge. 2.6.1 All kinds of soil

11.54

1467

127.15

... More
planting plant on ground with DAP and compost

95

1900

20

... More
plant purchase

95

11400

120

... More
DAP, vermi compost urea, foret lumpsum, transporting

1

7000

7000

... More
Tree guard with local resources such as bamboo etc (lumpsum)

1

8474

8474.58

... More
Information board

1

5000

5000

... More
Village: GARE Deepening of POND Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.

6300

33075

5.25

... More
Daag Beling

864

518

0.6

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

4581

582474

127.15

... More
PACHERI Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.

37.2

6960

187.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)

2

10007

5003.7

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size)

31.2

173954

5575.45

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

6.6

1843

279.25

... More
Brick work with flyash brick 230x110x75 mm size in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )

7.14

33180

4647.15

... More
STONE PITCHING Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.

200

116140

580.7

... More
PLANTATION Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer in-charge. 2.6.1 All kinds of soil

11.54

1467

127.15

... More
planting plant on ground with DAP and compost

95

1900

20

... More
plant purchase

95

11400

120

... More
DAP, vermi compost urea, foret lumpsum, transporting

1

7000

7000

... More
Tree guard with local resources such as bamboo etc (lumpsum)

1

8474

8474.58

... More
Information board

1

5000

5000

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.