South Eastern Coalfields Limited - SECL Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date10 Oct 2024
Closing Date22 Oct 2024
Tender Amount₹ 49,46,299
Costs
EMD
₹ 61,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SECL_319073_1Bid Award Id
ViewTender No
SECL/GM/KSM/CIVIL/ e-Tender/24-25/53 dt 10/10/2024Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
54.65
5103
278903.54
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
160.75
6529
1049633.2
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
54.29
7609
413133.33
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Cold twisted bars
13562.4
89
1210444.2
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.
125
267
33493.75
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
490
547
268054.5
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
108
633
68385.6
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
1841.24
102
188266.79
Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift
50.89
115
5877.8
Embankment Construction with Material Obtained from Borrow Pits : Construction of embankment with approved material having CBR7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300.
800
159
127320
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement:1½coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources)
42
6104
256399.5
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.
250
548
137200
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand): Raised and cut pointing
250
435
108775
Providing and fixing soil, waste and vent pipes. 110 /100 mm dia SWR pipe as per IS code 13592 with cast all fittinga s per requirement and fixing on wall /surface and weep holes as per instruction of engineer in charge
13
235
3060.85
Total impact of GST for the purpose of CTC