South Eastern Coalfields Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.
South Eastern Coalfields Limited - SECL Tender
Electrical Cables And Wires
Electrical and Electronics
Electrical Works
Eprocure
Opening Date14 Feb 2024
Closing Date1 Mar 2024
Tender Amount₹ 4,13,616
Costs
EMD
₹ 5,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SECL_301401_1Bid Award Id
ViewTender No
GM/Bhat/EM/e-open tender/2023-24/80 dtd 13.02.2024Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Pit Digging
2
-
-
... More
Stay Pit Digging
2
-
-
... More
Transportation of pole from road side to pole pit for a lead of 1 km (poles will be provided by SECL)
2
-
-
... More
Shifting of material to pole pits
2
-
-
... More
Cross arm fixing complete with top clamp
2
-
-
... More
Pole erection complete
2
-
-
... More
Stay erection complete
2
-
-
... More
Concreting of poles @0.6 cmt per pole and 0.05 cmt per pole for base pading (1:3:6)(for Rail Pole)
1.3
-
-
... More
Insulator fixing at each location
6
-
-
... More
Painting and numbering etc including steel support
2
-
-
... More
Stringing of line for all 3 phases (Conductors shall be provided by SECL)
0.27
-
-
... More
Carpet Guarding
3
-
-
... More
Twisting of jointing sleeves
6
-
-
... More
B Double Pole (Total DP - 03)
-
-
-
... More
Pit Digging
6
-
-
... More
Stay Pit Digging
6
-
-
... More
Shifting of material to pole pits
3
-
-
... More
Transportation of pole from road side to pole pit for a lead of 1 km (pole will be provided by SECL)
6
-
-
... More
Cross arm fixing complete including insulators etc.
3
-
-
... More
Pole erection complete (including earthing)
6
-
-
... More
Concreting of stay @0.3 cmt/stay and poles
3.6
-
-
... More
Stay erection complete
6
-
-
... More
Painting of cross arm and numbering of poles etc.
6
-
-
... More
C Triple Pole (Total TP - 01)
-
-
-
... More
Pit Digging
3
-
-
... More
Stay Pit Digging
3
-
-
... More
Transportation of pole from road side to pole pit for a lead of 1 km (pole will be provided by SECL)
3
-
-
... More
Shifting of material to pole pits
1
-
-
... More
Cross arm fixing complete with top clamp
3
-
-
... More
Pole erection complete
3
-
-
... More
Concreting of poles @0.6 cmt per pole and 0.05 cmt per pole for base pading (1:3:6)(for Rail Pole)
1.95
-
-
... More
Stay erection complete
3
-
-
... More
Insulator fixing at each location
6
-
-
... More
Painting and numbering etc including steel support
3
-
-
... More
Stringing of line for all 3 phases (Conductors shall be provided by SECL)
0.42
-
-
... More
Carpet Guarding
2
-
-
... More
Twisting of jointing sleeves
3
-
-
... More
D Installation of AB Switch (02 No.)
-
-
-
... More
Fixing of AB switch complete with handle isolator
2
-
-
... More
Stringing of conductor with fixing of terminal clamps
2
-
-
... More
Fixing of T-clamps for jumpers and bimetallic clamps
70
-
-
... More
Jumpering of AB Switch and fixing of terminal clamps
2
-
-
... More
E Running Earth
-
-
-
... More
Providing and fixing 6 SWG dia G.I. wire on surface or in recess for loop earthing as required (Running Earth)
160
-
-
... More
F HV Cable Jointing and End Termination - 70 Sq. mm
-
-
-
... More
HV Cable Jointing and End Termination for 3 core 70 Sq. mm
1
-
-
... More
G HV Cable Jointing and End Termination - 120 Sq. mm
-
-
-
... More
HV Cable Jointing and End Termination for 3 core 120 Sq. mm
2
-
-
... More
I Transportation & laying of 120 Sq. mm PVC Armoured cable from Incline No. 1 mouth to 2L/36R LPP Substation
-
-
-
... More
Manpower required- 16 unskilled labours for 3 days
1
-
-
... More
Material Part
-
-
-
... More
Earthing coil per pole (coil of 115 turns of 50mm dis and 2.5 mtrs lead of 4mm GI Wire)
11
-
-
... More
Barbed Wire @2kg/pole
22
-
-
... More
Back Clamp for Pole
11
-
-
... More
MS Nut and Bolt 16x160mm
22
-
-
... More
11 kV "V" Cross Arm Channel type 75x40 mm
2
-
-
... More
Stay Set 20mm
11
-
-
... More
Stay Wire 7/8 SWG @8.5Kg/stay
93.5
-
-
... More
Stay Clamp
11
-
-
... More
Stay Insulator
11
-
-
... More
DC Cross Arm 5' center 100x50mm MS Channel
5
-
-
... More
Bracing Set 5' center DP
5
-
-
... More
MS Nut and Bolt 16x40mm
2.5
-
-
... More
MS Nut and Bolt 16x200mm
27.5
-
-
... More
11KV Disc Insulator
18
-
-
... More
11KV Pin Insulator
6
-
-
... More
11 kV Guarding Channel 100x50mm
8
-
-
... More
GI Wire 6 SWG (Guarding)
114
-
-
... More
GI Wire 8 SWG (Guarding)
74
-
-
... More
Tension / anchoring Clamp with tracking protection IPC
9
-
-
... More
Lightning Arrestor
3
-
-
... More
Running Earth
160
-
-
... More
HV Cable Jointing and End Termination- Outdoor cable jointing kit with cast resin compound with lugs for 11 KV grade XLPE cable for 3 core 70 sq. mm.
1
-
-
... More
HV Cable Jointing and End Termination- Outdoor cable jointing kit with cast resin compound with lugs for 11 KV grade XLPE cable for 3 core 120 sq. mm.
2
-
-
... More
AB Switch (11 kV) with complete fitting
2
-
-
... More
Overhead Charges (market fluctuation, contractor's profit on material cost)
1
-
-
... More
Total impact of GST for the purpose of CTC
1
-
-