South Eastern Coalfields Limited Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

South Eastern Coalfields Limited - SECL Tender

Works
Civil And Construction
Eprocure
Opening Date15 May 2024
Closing Date31 May 2024
Tender Amount₹ 8,95,005.87 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018)

142.51

-

428.85

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: 1:2:4 ( 1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: 1:2:4 ( 1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal ( Sl No.- 12 of GMSOR 2018)

25.01

-

7110.1

... More
12 mm cement plaster mix 1:6 (1 cement : 6 Fine Sand ) ( Sl No.- 11 of GMSOR 2018)

142.51

-

400.2

... More
Loading of materials into tub at surface. ( Sl No.- 8a of GMSOR 2018)

41.13

-

271.38

... More
Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018)

41.13

-

198.66

... More
Lead for transportation of materials for every 15 mtr or part by head load for 50 m. ( Sl No.- 7 of GMSOR 2018)

41.13

-

135.35

... More
Mulma cleaning /removal of debris from u/g gallaries and cleaning of belt roadways and staking /loading within 50m. ( Sl No.- 1 of GMSOR 2018 )

22.05

-

709.93

... More
Groove cutting / floor cutting for stopping / Manhole by chisel & hammer in Coal (Side)( Sl No.- 2d of GMSOR 2018)

2.19

-

1787.98

... More
Groove cutting / floor cutting for stopping / Manhole by chisel & hammer in Hard Stone (Hard Stone) ( Sl No.- 2a of GMSOR 2018)

1.19

-

6296.78

... More
Brick work with F.P.S. Local Bricks in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) ( Sl No.- 9 of GMSOR 2018)

0.86

-

6116.46

... More
Brick work with F.P.S. Local Bricks in superstructure above plinth level upto floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement: 6 coarse sand) ( Sl No.- 10 of GMSOR 2018)

18.52

-

8897.34

... More
Centring and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018)

52.8

-

428.85

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement : ( Sl No.- 13 of GMSOR 2018 )

7.92

-

11152.5

... More
12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand) ( Sl No.- 11 of GMSOR 2018)

101.16

-

400.2

... More
Loading of materials into tub in surface ( Sl No.- 8a of GMSOR 2018)

45.01

-

271.38

... More
Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018 )

45.01

-

198.66

... More
Lead for transportation of materials by head load up to 50.0 m. (One lead ) ( Sl No.- 7 of GMSOR 2018)

45.01

-

135.35

... More
MS Rod 10mm

654.72

-

75

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.