South Eastern Coalfields Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.
South Eastern Coalfields Limited - SECL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date24 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 1,90,413
Costs
EMD
₹ 2,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SECL_321622_1Tender No
eTender/24-25/Kurasia /R-19/35 Date 21.11.2024Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Reinforcement cement work 1:2:4 (1 Cement: 2 Sand: 4 Stone aggregate 20mm and down gauge) in wall column, buttress including vibrating, tamping, curing etc. and loading, unloading the materials into mine car/tub and carriage of materials by manual labour for a lead 50 mtr. both at surface and underground but excluding cost of reinforcement. (Item No. 6 of GMSOR 2016).
7.9
6360
50245.03
... More
M.S. Reinforcement for RCC work including straightening, cutting, bending, placing in position, binding etc. complete and loading, unloading the materials into mine car/tub and carriage of materials by manual labour for a lead of 50 mtrs. Both at surface and underground. (Item No. 8 of GMSOR 2016).
884.52
68
60191.59
... More
Providing centering & shutter with props and removal of the same all complete including loading ,unloading the materials into mine car /tub and carriage of materials by manual labour for a lead of 50mtrs both at surface and underground.(in one side - For foundation and plinth (Item No. 13(a) of GMSOR 2016)
4.64
247
1147.05
... More
Providing centering & shuttering with props and removal of the same all complete including loading ,unloading the materials into mine car /tub and carriage of materials by manual labour for a lead of 50mtrs. both at surface and underground.(in one side) - For Wall (Item No. 13(b) of GMSOR 2016)
10.66
640
6828.16
... More
12mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) including loading, unloading the materials into mine car /tub and carriage of materials by manual labour for a lead of 50 mtrs. both at surface and underground.(in wall for one side) (Item No. 16 of GMSOR 2016)
13.77
266
3662.82
... More
Extra for tub pushing for every 50 mtrs in underground where haulage is not provided (06 lead) (Rate for 1M3 sand = 3.48, for 06 lead = 6 x 3.48 = 20.88/m3) - For Sand. (Item No. 25(b) of GMSOR 2016).
2.88
20
60.13
... More
Extra for tub pushing for every 50 mtrs in underground where haulage is not provided (06 lead) (Rate for 1M3 = 3.48, for 06 lead = 6 x 3.48 = 20.88/m3) - For Stone Chips. (Item No. 25(b) of GMSOR 2016).
9.99
20
208.59
... More
Extra for tub pushing for every 50 mtrs in underground where haulage is not provided (06 lead) (Rate for 1 te = 2.20, for 06 lead = 6 x 2.20 = 13.20/te) - For Cement. (Item No. 25(e) of GMSOR 2016).
3.66
13
48.31
... More
Extra for tub pushing for every 50 mtrs in underground where haulage is not provided (06 lead) (Rate for 1 te = 3.61, for 06 lead = 6 x 3.61 = 21.66/te) - For Steel. (Item No. 25(f) of GMSOR 2016).
0.89
21
19.17
... More
Malma Cleaning/removal of debris from underground galleries, disposal with in 50 mtrs. (Item Item No. 1 Up dated as on 01.04.2024 of GMSOR 2019).
12.75
733
9347.28
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%