South Eastern Coalfields Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.
South Eastern Coalfields Limited - SECL Tender
Transportation and Logistics
Machinery and Tools
Eprocure
Opening Date7 Nov 2024
Closing Date27 Nov 2024
Tender Amount₹ 68,37,517
Costs
EMD
₹ 85,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SECL_320657_1Bid Award Id
ViewTender No
SECL/GM/CHRM/EM/e-Tender/ 24-25/29 dtd. 07.11.2024Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 45 Te for 600 mtrs.) For 01 time installation and 11 times extension
(For 600 mtrs. Structure length at lead from 100 mtrs to 650 mtrs)
45
8541
-
... More
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
600
448
-
... More
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
1200
74
-
... More
Placing/changing 1000 mm PVC belting on conveyor structure.
1200
89
-
... More
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
11
8973
-
... More
Belt installation of double drive with loop take up at 63E/39N and further extension up to 59E/39N (100 mtrs.) with tail end shifting for 1 time at a span of 50 mtrs. at Kurasia UG mine.
-
-
-
... More
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
1
89733
-
... More
Installation of 1000 mm size double drive drum with loop take up.
1
112167
-
... More
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 7.5 Te for 100 mtrs.) For 01 time installation and 1 times extension
(For 100 mtrs. Structure length at lead from 200 mtrs to 250 mtrs)
7.5
4374
-
... More
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
100
448
-
... More
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
200
74
-
... More
Placing/changing 1000 mm PVC belting on conveyor structure.
200
89
-
... More
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
1
8973
-
... More
Belt installation of double drive with loop take up at 63E/34N and further extension up to 53E1/29N1 (400 mtrs.) with tail end shifting for 7 times at a span of every 50 mtrs. at Kurasia UG mine.
-
-
-
... More
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
1
89733
-
... More
Installation of 1000 mm size double drive drum with loop take up.
1
112167
-
... More
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 30 Te for 400 mtrs.) For 01 time installation and 7 times extension
(For 400 mtrs. Structure length at lead from 100 mtrs to 450 mtrs)
30
6026
-
... More
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
400
448
-
... More
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
800
74
-
... More
Placing/changing 1000 mm PVC belting on conveyor structure.
800
89
-
... More
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
7
8973
-
... More
Belt installation of double drive with loop take up at 29N1/53E1 and further extension up to 39N1/53E1 (200 mtrs.) with tail end shifting for 3 times at a span of every 50 mtrs. at Kurasia UG mine.
-
-
-
... More
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
1
89733
-
... More
Installation of 1000 mm size double drive drum with loop take up.
1
112167
-
... More
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 15 Te for 200 mtrs.) For 01 time installation and 3 times extension
(For 200 mtrs. Structure length at lead from 150 mtrs to 300 mtrs)
15
4452
-
... More
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
200
448
-
... More
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
400
74
-
... More
Placing/changing 1000 mm PVC belting on conveyor structure.
400
89
-
... More
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
3
8973
-
... More
Belt installation of double drive with loop take up at 29N1/58E1 and further extension up to 40N1/58E1 (250 mtrs.) with tail end shifting for 4 times at a span of every 50 mtrs. at Kurasia UG mine.
-
-
-
... More
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
1
89733
-
... More
Installation of 1000 mm size double drive drum with loop take up.
1
112167
-
... More
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 18.75 Te for 250 mtrs.) For 01 time installation and 4 times extension
(For 250 mtrs. Structure length at lead from 100 mtr to 300 mtrs)
18.75
3963
-
... More
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
250
448
-
... More
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
500
74
-
... More
Placing/changing 1000 mm PVC belting on conveyor structure.
500
89
-
... More
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
4
8973
-
... More
Belt installation of double drive with loop take up at 63E1/29N1 and further extension up to 63E1/39N1 (200 mtrs.) with tail end shifting for 3 times at a span of every 50 mtrs. at Kurasia UG mine.
-
-
-
... More
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
1
89733
-
... More
Installation of 1000 mm size double drive drum with loop take up.
1
112167
-
... More
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 15 Te for 200 mtrs.) For 01 time installation and 3 times extension
(For 200 mtrs. Structure length at lead from 100 mtrs to 250 mtrs)
15
3401
-
... More
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
200
448
-
... More
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
400
74
-
... More
Placing/changing 1000 mm PVC belting on conveyor structure.
400
89
-
... More
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
3
8973
-
... More
Belt extension of 15 South conveyor belt from 63W/15S to 75W/15S of Kurasia UG mine. The total structure length is 300 mtr and tail end set will be extended for 6 times after a span of every 50mtrs.
-
-
-
... More
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75 Te for 50 mtrs.. So, 22.50 Te for 300 mtrs.) For 6 times extension (For 300 mtrs. Structure length at lead from 150 mtr to 400 mtrs)
22.5
5176
-
... More
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
6
8973
-
... More
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
600
74
-
... More
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
300
448
-
... More
Placing/changing 1000 mm PVC belting on conveyor structure.
600
89
-
... More
Belt installation of double drive with loop take up at 15S/75W and further extension up to -2S/75W (400 mtrs.) with tail end shifting for 7 times at a span of every 50 mtrs. at Kurasia UG mine.
-
-
-
... More
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
1
89733
-
... More
Installation of 1000 mm size double drive drum with loop take up.
1
112167
-
... More
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 30 Te for 400 mtrs.) For 01 time installation and 7 times extension
(For 400 mtrs. Structure length at lead from 100 mtrs to 450 mtrs)
30
6026
-
... More
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
400
448
-
... More
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
800
74
-
... More
Placing/changing 1000 mm PVC belting on conveyor structure.
800
89
-
... More
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
7
8973
-
... More
Belt installation of double drive with loop take up at 75W/9S and further extension up to 81W/9S (150 mtrs.) with tail end shifting for 2 times at a span of every 50 mtrs. at Kurasia UG mine.
-
-
-
... More
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
1
89733
-
... More
Installation of 1000 mm size double drive drum with loop take up.
1
112167
-
... More
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 11.25 Te for 150 mtrs.) For 01 time installation and 2 times extension
(For 150 mtrs. Structure length at lead from 100 mtrs to 200 mtrs)
11.25
2891
-
... More
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
150
448
-
... More
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
300
74
-
... More
Placing/changing 1000 mm PVC belting on conveyor structure.
300
89
-
... More
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
2
8973
-
... More
Belt installation of double drive with loop take up at 9S/81W and further extension up to -2S/81W (300 mtrs.) with tail end shifting for 5 times at a span of every 50 mtrs. at Kurasia UG mine.
-
-
-
... More
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
1
89733
-
... More
Installation of 1000 mm size double drive drum with loop take up.
1
112167
-
... More
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 22.50 Te for 300 mtrs.) For 01 time installation and 5 times extension
(For 300 mtrs. Structure length at lead from 200 mtrs to 450 mtrs)
22.5
7226
-
... More
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
300
448
-
... More
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
600
74
-
... More
Placing/changing 1000 mm PVC belting on conveyor structure.
600
89
-
... More
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
5
8973
-
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements