South Eastern Coalfields Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.
South Eastern Coalfields Limited - SECL Tender
Transportation and Logistics
Eprocure
Opening Date25 Dec 2023
Closing Date6 Jan 2024
Tender Amount₹ 17,69,575
Costs
EMD
₹ 22,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SECL_296892_1Bid Award Id
ViewTender No
AGM/HSD/GM(O)/e-Tend/23-24/159 dtd 25.12.2023Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Transportation of 100m track line (i.e. 100m×2=200m rail of 30 lbs) from surface/ old working to site of installation in UG for a lead of 2 km
3
85270
28423.63
Laying of haulage track line of 100m length with 30lbs rail on both side of the track (100m×2) in underground
338
96073
284.24
ii). Installation of crossing on track line:
4
45477
11369.45
Shifting of Haulage return pulley from one site to another site in UG for a distance of 200 m.
4
90955
22738.9
Transportation, Laying & splicing of Haulage rope (1000m Length & Dia. 19/22mm) from surface to required UG site or old working to new working or vice-versa at the lead of 2 km max
4
136433
34108.35
Line packing including packing with materials as per direction of site incharge
101.4
50921
502.18
Malma cleaning, Removal of debries from galleries, sumps,tail ends of belt conveyor, and stacking within 50M
156.9
109305
696.66
Dismantling, Transportation & Installation of (1000/800mm size) Tail end drum, drum base,tailend guard, side plate/loading brackets(chute),decking plates in UG within a lead of 100m.
14
119379
8527.09
Dismantling and Transportation of PVC Belting of length 200m from one district to another district up to end of the track line for lead of 1km. b).For 800mm PVC Belting
680
38658
56.85
Dismantling and transportation of 800mm size single drive drum without loop take-up up to the track end with a lead of 100m
1
28423
28423.63
Dismantling of belt structure of 800mm/ 1000mm of 100 m length in UG and transportation of the same up to the end of the track at a lead of 100m in UG.
340
164356
483.4
Installation of 800mm size single drive drum without loop take-up.
1
28423
28423.63
Installation of belt structure of 800mm/ 1000mm of 100 m length in UG gallery
340
112897
332.05
Change of PVC belting on conveyor structure b).For 800mm PVC Belt conveyor
680
48320
71.06
Groove cutting for Stopping & Manhole by chisel & hammer.b) Soft Stone
4.2
21317
5075.65
PCC work in ug including centering + shuttering etc. complete ratio of 1:2:4
11.2
35371
3158.18
12 mm thick cement /lime plastering ratio of 1:6 up to 5 meter and above in u.g.
22.5
8882
394.77
Loading of materials in tub at incline mouth (all items of building materials).
17.84
4839
271.23
Unloading of all kinds of building materials at destination U/G.
17.84
3478
194.95
stone chips
9.86
12325
1250
Cement
74
28490
385
Sand
5.34
7209
1350
Total Impact of GST for the Purpose of CTC
1
-
-