South Eastern Coalfields Limited Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

South Eastern Coalfields Limited - SECL Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date2 Aug 2024
Closing Date13 Aug 2024
Tender Amount₹ 30,79,138 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Transportation of 100m track line (i.e. 100m×2=200m rail of 30 lbs) from surface/ old working to site of installation in UG for a lead of 2 km.

5

144826

28965.2

... More
Installation of crossing on track line:

470

136135

289.65

... More
Transportation, Laying & splicing of Haulage rope (1000m Length & Dia. 19/22mm) from surface to required UG site or old working to new working or vice-versa at the lead of 2 km max

1

34758

34758.24

... More
Line packing including packing with materials as per direction of site incharge.

141

72156

511.75

... More
Dismantling and transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.

2

173791

86895.6

... More
Installation of 1000mm size double drive drum with loop take-up.

2

202756

101378.2

... More
Transportation of PVC Belting of length 200m from Surface to UG/from one district to another district up to end of the track line for lead of 1km a).For 1000mm PVC Belting

1040

75306

72.41

... More
Dismantling, Transportation & Installation of (1000/800mm size) Tail end drum, drum base,tailend guard, side plate/loading brackets(chute),decking plates in UG within a lead of 100m.

11

95585

8689.56

... More
Dismantling of belt structure of 800mm/ 1000mm of 100 m length in UG and transportation of the same up to the end of the track at a lead of 100m in UG. a).For 1000mm PVC Belt conveyor

520

301236

579.3

... More
Installation of belt structure of 800mm/ 1000mm of 100 m length in UG gallery a).For 1000mm PVC Belt conveyor

520

180596

347.3

... More
Change of PVC belting on conveyor structure.a).For 1000mm PVC Belt conveyor

1040

90355

86.88

... More
Transportation, laying, charging of armoured cable from surface to underground or from old dist. to new dist. or vice-versa for a lead of 100m. 3.1. For armoured cable of length 200 m & size-35 m2.

3

34758

11586.08

... More
Shifting of Auxiliary Fan with Air duct of 100m length, starter and coursing of air within the district for a lead of 50m

5

57930

11586.08

... More
Shifting of main ACB, coupled ACB with 100m armoured cables (50/70mm2) laying thereof within the district in UG with lead of 50m.

5

72413

14482.6

... More
Fixing of Girder along drift from incline mouth to working site & roof of gallery.

70

506891

7241.3

... More
Groove cutting for duggi in Hard stone

3.78

23801

6296.78

... More
Groove cutting for duggi in soft stone

8.32

43034

5172.36

... More
PCC work in ug including centering + shuttering etc. complete ratio of 1:2:4

12.1

38942

3218.36

... More
Loading of materials in tub at incline mouth (all items of building materials).

17.77

4822

271.38

... More
Unloading of all kinds of building materials at destination U/G.

17.77

3530

198.66

... More
Transportation/Carriage of steel structure by manual labour including loading, unloading & Stacking the same for lead up to 50 m in Underground.

61.98

38232

616.85

... More
stone chips

9.68

12100

1250

... More
Cement

77.44

29814

385

... More
Sand

5.32

7182

1350

... More
Total Impact of GST for the Purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.