South East Central Railway Tender
... More
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.
South East Central Railway - SECR Tender
Civil And Construction
Excavation
Other Consultancy Services
Consultancy Services
Ireps
Opening Date14 Feb 2025
Closing Date11 Mar 2025
Tender Amount₹ 3,10,95,642.8
Costs
EMD
₹ 3,05,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
CEC-BSP-24-25-20-CAO-C-HQ-ENGINEERING/SOUTH EAST CENTRAL RLYTender No
CEC-BSP-24-25-20Tender Authority
South East Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Execution of all works connected with above work covered under USSOR-2021(Works & Material) of SEC Rly, excluding the item covered under different Schedules.
-
-
600000
... More
Exploratory drilling of boreholes down to required depth, drilling of 150mm dia. 2 boreholes in all type of soils except hard rock & large boulders (boulder core more than 30cm) including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion/chiselling tool for advancing through occasional seams of hard strata to be employed, where necessary in Dry area. 10m to 20m
175
1612
282194.5
... More
After Declaration notification, publicity of the same to all the owners by distribution of 10 notice, affixing the notice on the notice board of every village office, Panchayat/Talathi's office for information and seeking Claims under Determination of Award, taking photographs as proof of fixing etc. complete with consultant's own man power, stationary/Xerox/ consumables, including transport arrangement etc. complete in all respect. Note: Here unit Each means Village.
181
2413
436906.85
... More
Preparation and submission of land acquisition proposals duly collecting land and 7 village maps from revenue authorities and marking the proposed alignment including land widths forland acquisition purpose including copies of pahanis/Nakshas and khasras of individuals from the Revenue department of relevant districts /villages including plotting the details of length and width of land requirement and all other parameters as required for land acquisition, furnished details in form A & D and making booklet with all contractor's Engineers supervisors /Technical assistants drawing and other required equipment overhead charges etc. required for collecting the details from revenue department as directed by the Engineer-in-charge in consultation with railway department.
307.92
1269
390885.96
... More
Assisting Competent Authority for Land Acquisition (CALA) for land acquisition, preparation of details from available land records for publishing Prelimary notification after notification, publicity of the same to all the owners by distribution of notices, affixing the notice on the 9 notice board of every village office, Panchayat /Talathi's office for information and seeking objections under relevant section of land Acts, taking photographs as proof of fixing acknowledgement from Project Affected Person/Peoples (PAPs) etc. complete with consultant's own man power, stationary /Xerox /consumables, including transport arrangement etc. complete in all respect. Note: Here unit Each means Village.
181
2413
436906.85
... More
Facilitating Public Works Department for survey and valuation of affected structures, 11 and any other value addition to the land etc. complete in all respect, with consultant's own man power, stationary/ printing/consumables, including transport arrangement etc. complete in all respect. Note: Here unit Each means Per Village
100
6777
677735
... More
Aerial Videography by unmanned aerial vehicle (UAS-Drone) and submission of digital data/digital image/video in CDs
307.92
2289
705081.37
... More
Conducting Laboratory tests on collected ROCK SAMPLES as per relevant IS code Density Test
55
566
31164.1
... More
Erection of temporary working platform to drill bore hole through flowing/standing water through river bed up to water depth of 1.5m, and dismantling after completing work and removing from the site to clear the water way.
200
3000
600062
... More
Conducting laboratory Tests on collected soil samples as per relevant IS code Tri-axial Test
50
2059
102974.5
... More
Conducting laboratory Tests on collected soil samples as per relevant IS code Direct Shear Test
160
2044
327081.6
... More
Conducting laboratory Tests on collected soil samples as per relevant IS code Specific Gravity
160
426
68313.6
... More
Conducting standard penetration test as per IS:2131 at approximate1.5m intervals in bore holes, as directed by the Engineer in charge
100
674
67470
... More
Drilling of NX size borehole (75mm dia.) in all types of hard rock and collection of rock core samples from boreholes and preserving in boxes. 0m to 10m
200
3151
630302
... More
Preparation of existing & proposed layout plan including detailed plan/section of station building, quarters, structures on Auto CAD and submission of print on white paper and tracing for approval of Railways.
40
1121
44848.4
... More
Preparation of necessary documents for issue of notifications under section 11, 12 & 19 or as per any other relevant section of the New Land acquisition act 2013 or old act in force for stage-I & II approvals duly attending the JMC of revenue forest and railway authorities including making 8 arrangements for conveyance to the officials necessary labour for pulling chains and fixing flags etc. and assisting in taking measurements preparation of sketches making the booklets in 6 copies to submit to the revenue authorities with all contractor's supervisors tools vehicles consumables all lead and lifts involved stationery Xerox copying charges etc. complete and as directed by Engineer-in- charge. Note for 11,12,13- If projects declared as 'Special Railway Project ' than land acquisition be processed as per New RAA- 2008 and accordingly proposal be prepared as Para 20A,20E etc.
307.92
3092
952097.88
... More
Facilitating CALA for preparation of Land Looser Certificate/Lesser Assesment Register, 15 chasing the matter and further submission to Tahsildar, Circle officer (Mandal Adhikari)/ Talathi for transferring land title with consultant's own machinery, man power, consumables, transportation etc. complete. Note: Here unit Numbers means No. of plots.
5000
250
1253350
... More
Exploratory drilling of Boreholes down to required depth, drilling of 150mm diameter boreholes in all type of soils except hard rock and large boulders (boulder core more than 30cm), 4 including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion / chiselling tool for advancing through occasional seams of hard strata to be employed where necessary in River bed area including standing/flowing water with all necessary arrangements except making of platform under water which shall be paid under relevant item of SOR. 10m to 20m
80
1935
154803.2
... More
Facilitating Competent Authority for collecting all documents required for preparation 13 of award such as ROR abstract, Record of Land abstract, widow certificate, below poverty line (BPL) list, etc. with consultant's own machinery, man power, stationary/printing/consumables, including transportation etc. complete in all respect. Note: Here unit Each means Per Village.
181
9785
1771155.59
... More
Conducting Laboratory tests on collected ROCK SAMPLES as per relevant IS code Point Load Test
55
869
47796.65
... More
Conducting laboratory Tests on collected soil samples as per relevant IS code Moisture Content/Dry Density
160
282
45142.4
... More
Conducting Laboratory tests on collected ROCK SAMPLES as per relevant IS code Unconfined Compression Test
55
1609
88527.45
... More
Casting, transporting and fixing precast RCC boundary pillars with M15 grade of size 350mm (bottom), 230mm (top), 1550mm height, 100mm thick or as per approved drawing/sketch 3 supplied including engraving the letters SECR and applying one coat of primer, and two coats of red enamel paint and painting the engraved letters with white paint including excavation of pit and fixing into ground up to 900 depth with contractors OP cement, steel, labour, tools, materials all lead and lift involved, curing etc., complete as per specifications and as directed by the Engineer-In-Charge.
12280
280
3439382.4
... More
Conducting laboratory Tests on collected soil samples as per relevant IS code Grain size analysis including Hydrometer analysis
160
631
101012.8
... More
Exploratory drilling of boreholes down to required depth, drilling of 150mm dia. 1 boreholes in all type of soils except hard rock & large boulders (boulder core more than 30cm) including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion/chiselling tool for advancing through occasional seams of hard strata to be employed, where necessary in Dry area. 0m to 10m
1550
1486
2304292
... More
Taking photographs of structures with name board of each Project Affected 16 Person/Peoples (PAPs) and submission of hard copy with all details of PAP such as name, survey no. structure details etc. with consultant's own machinery, man power, consumables, transportation etc. complete. This should be submitted village wise in 2 copies one with ring binding and other loose. Note: Here unit Each means Per structure.
2000
157
315680
... More
Taking out 100mm dia. & 450mm long undisturbed samples of soil from bore holes, 7 including provision of air tight containers for packing and, labeling incl. transporting the samples to laboratory. Piston sampler shall be used for extracting undisturbed samples where necessary. Samples shall be collected as per IS:2720.
500
223
111905
... More
Calculation of land widths and preparation of land plans in original on tracing cloth/film of 70 microns required for the land to be acquired duly indicating chainages and widths along with alignment including station yards to a suitable scale as directed by the Engineer-in-charge.
307.92
602
185389.39
... More
Photography /Videography, numbering of agriculture (fruit bearing) & forest trees within the Railway boundary and beyond Railway boundary up to proposed ROW as per joint measurement sheet by making notch of size 100x100mm, painting white paint on it and numbering 19 the trees in each survey number with red enamel paint . Taking photographs and video shooting of the trees of each survey numbers of the village coming under acquisition in private land and Railway land separately. Preparation of document as per proforma enclosed and submission of same in soft & one set of hard copy. The item includes all contractor's material, labours, transportation tools & plants , etc . For private land, number of trees should be identified as per Survey no./Land owner wise and within existing railway land, the number of trees should be identified as per Railway Km/EP.
308
83
25739.56
... More
For panchnama due to noncompletion of joint measurement due to mass opposition in 20 a village or stretch with Revenue Staff & land owners/sub- holders, incl. survey equipments, manpower, etc. including transport arrangement etc. complete in all respect with all contractor labour, materials tools & plants
307.92
2729
840467.64
... More
Exploratory drilling of Boreholes down to required depth, drilling of 150mm diameter 3 boreholes in all type of soils except hard rock and large boulders (boulder core more than 30cm), including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion / chiselling tool for advancing through occasional seams of hard strata to be employed where necessary in River bed area including standing/flowing water with all necessary arrangements except making of platform under water which shall be paid under relevant item of SOR. 0m to 10m
500
1783
891980
... More
Conducting Aerial Topographical Survey with DGPS integrated RTK/PPK UAS DRONE 1 based photogrammetric and Lidar to capture ground features and assets along the given alignment including Yards. Trolley/Loco Based Lidar System shall also be conducted to get uniform accuracy and data through out on the final approved alignment for Final Location Survey/DPR within an accuracy of 5cm RMSE. Survey will be done for width of around 100m. In mid section and around 250 m in yard. However final width requirement shall be as approved by Engineer-in-charge. Following output should be delivered: 1.Topographical base map in AutoCAD format of 1:500 scale having all the naturals & manmade features such as buildings, road, tracks, platforms, walls, yards boundaries, fences, signals, electrical mast, FOBs, LCs, RUB/ROBs etc. In .DWG or .DXF format. 2.Contours at an interval of 50 cm in DWG or DXF format. 3.Digital Elevation Model of 1m resolution in ASCII format and DWG format. 4.3cm resolution (GSD) Ortho-photo in ECW or TIFF format which can be opened in CAD. 5.List of Control points established onto the Ground using DGPS (every 2 km as primary control points on existing permanent Structures.) 6.RTK (every 250 m) along with their Latitude, Longitude and elevation. 7.NSSDA report showing accuracy achieved in comparison to control points established. 8.Digital Terrain Model showing accuracy achieved in comparison to control points established. 9. Preparation and supplying of Yard Plans (ESPs) of various Stations along the alignment showing proposed position of track and related structures based on concept plan on Auto Cad and submit in CD along with miniature A4 size yard diagram. 10.The levels shall be provided at every 25 M interval and each 5 M for cross section upto 30 M beyond toe/edge of bank/cutting of BG formation for cross section and must be shown in plan. 11.The Reduced level/Rail level shall be connected with standard bench mark. 12.Longitudinal section (L-Section)/Cross section and alignment plan will be prepared on computer in Auto CAD and submitted in soft copy as well as hard copy. 13.Index plan and index section in soft copy as well as hard copy. 14.Processed 3D point cloud in LAS format. The item also include staking of approved alignment with RCC Pillars (150 x 150x 900mm size with 300mm projected above ground level) at an interval of 500m, (with wooden pegs 50 x 50 x 450mm size) at every 20m where track is away from the existing track or where it is advised by Engineer-in-charge. (Cost of wooden pegs is inclusive). The RCC Pillars shall also be fixed on curves indicating transition portion, apex point, crown of curve, beginning and end point of circular curves, (5 locations for each curve) at major bridges two pillars one or either side, including submitting list of distance and coordinates of centre line of proposed BG line from centre line of existing BG line at every 25m interval. He shall also submit the list of existing infringement to the proposed BG alignment as per latest SOD for BG. The proforma for the same shall be approved by Engineer-in-charge. Payment Schedule for Item No.1 of Schedule : A. 70% payment shall be made on submission of the report. B. 30% payment shall be made on approval of the work by the Railways.
307.92
18648
5742110.64
... More
Conducting laboratory Tests on collected soil samples as per relevant IS code Atterberg Limits
160
621
99360
... More
Providing and fixing cast-in-situ or precast M-25 RCC concrete centre-pillars of size 150 x 150 x 900mm with 300 mm projected above ground level on straight and curves as per Scope of Work & Technical Specifications with Contractors' own materials, tools and plants; including all leads and lifts and crossing of track etc.; including all taxes and royalties complete; including painting, 2 marking the pillars at site; including fixing of posts at curves indicating transition portion, apex point and crown of curve, beginning and end point of circular curves as per the setting of curve done in item no 1 etc. The rate includes the cost of all material including cantering, shuttering, cutting, binding, reinforcement, cement etc all inclusive. The exposed surfaces should be smooth and neatly finished. Main Reinforcement shall be 4 nos. of 8mm Ø bars and stirrups of 8mm Ø @ 200 mm c/c spacing. Note-The pillars may be erected as directed by the Engineer in-charge along proposed centre line of BG track and Chainages shall be marked on these pillars.
1410
233
329643.9
... More
Conducting Laboratory tests on collected ROCK SAMPLES as per relevant IS code Hardness
-
-
19
... More
Conducting laboratory Tests on collected soil samples as per relevant IS code Consolidation Test
50
2369
118453.5
... More
Preparation of LWR / CWR and Weld Plans: For Continuously Welded Rail (CWR) track for as much length as possible, for which the Contractor shall prepare the CWR plans for the approval of the Employer in accordance with the design principles/provisions contained in IR LWR (Long Welded Rail) Manual based on approved Track Structure. The consultant shall submit advance copy of the Weld Plans on white paper for approval of Employer. After the approval of Employer, the Consultant shall submit drawings in 3 (three) hard coloured copies on Polyester based tracing paper (100 to 150 22 Microns) and two soft copies on CD. The scope includes required corrections and modifications as suggested by approving authorities of Railways till its final approval. Required follow up with various approving authorities including required explanations on various provisions/facilities in the ESP shall be arranged by consultant. Note: i) The colour scheme to be followed in the drawing shall be as per standard practice of IR. ii) Payment will be done as per Stages given below - Submission of Weld Plans and approval by Dyce ) / CON / BSP and CE/CON : 60% - Submission of Weld Plans and approval by Divisional HQ : 15% - Submission of Weld Plans and approval by Zonal HQ : 15% - Submission of Weld Plans in hard & soft copies : 10%
307.92
110
34043.64
... More
Facilitating Competent Authority for preparation of order for transferring the land with 14 all documents required such as Site Survey sheet, Vivaran- Patra, possession receipt, etc. Submission to respective Tahsil with consultant's own machinery, man power, consumables, transportation etc. complete. Note: Here unit Each means Per Village
181
482
87381.37
... More
Conducting Laboratory tests on collected ROCK SAMPLES as per relevant IS code Modulus of Elasticity
55
5270
289867.6
... More
Extra for Revision/Modifications in L-Sections/ Plans by Railway after final approval of engineer in charge in each sheet and submission of another set of coloured drawing on tracing, three copies of white print and soft copy for final approval.
56
611
34259.68
... More
Conducting Laboratory tests on collected ROCK SAMPLES as per relevant IS code Water Absorption & Porosity
55
497
27349.85
... More
Facilitation CALA/S.E.C. Railway for verification of survey as per the complaint of land owner with Revenue Staff & land owners/sub-holders, with Consultant's survey equipments, 18 manpower etc. items includes preparation and issue of notices to all concerned such as land owners, Agriculture/Forest/PWD, area calculation, preparation of drawing, abstract statement (Vivaran-Patra) in five sets. CoUection of ROR abstract etc. Complete in all respect, with all Consultant's own stationary/printing/consumables including transportation etc. complete. Note: Here unit Each means Per Village
120
14668
1760256
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements