South East Central Railway Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

South East Central Railway - SECR Tender

Ireps
Opening Date13 Feb 2019
Closing Date14 Mar 2019
Tender Amount₹ 1,97,70,569 
Notes
Download

Costs

Summary

Tender For Rebuilding Of Bridge No. (478 Dn Km 722/8-10 Of Span 3 X 12.2) Between Bilaspur- Durg Section For Making The Bridge Fit To Run 25t Axle Load.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling, watering and ramming earth in 15 cm layers in floors and foundations with surplus earth from foundations including 50m lead and 1.5m lift

1100

19

21560

... More
Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, rain bunds if provided, platforms etc. with earth excavated from outside railway boundary entirely arranged by the contractor at his own cost as per RDSO's latest guidelines and specifications and special 5 condition of contract including all leads, royalty, lifts, ascents, descents, crossing of nallahs or any other obstructions. The rates shall include all dressing of bank to final profile, demarcation and setting out of profile, site clearance, removing of shrubs, roots of vegetations growth, heavy grass, benching of existing slope of old bank, all handling/re-handling. taxes, octroi and royalty etc. as a complete job. Cut trees shall be property of railways and to be deposited in the railway godown unless specified otherwise in the Special conditions of contract

1800

201

362970

... More
Providing and laying cement concrete, up to plinth in retaining walls, walls (any thickness) 6 including attached plasters, columns, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc, excluding the cost of cement and of shuttering, centering. 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size)

430

1792

770680.4

... More
Providing and laying in position M 20 Grade concrete for reinforced concrete structural elements but excluding cost of centering, shuttering, reinforcement and Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge All work upto plinth level, including raft foundation of washable aprons, HS tank, pile cap, footings of FOB, and Platform shelter etc.

110

1974

217218.1

... More
Providing and laying in position M 20 Grade concrete for reinforced concrete structural 8 elements but excluding cost of centering, shuttering, reinforcement and Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge All work in buildings above plinth level upto floor two level.

135

2185

295024.95

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, raft foundation of washable aprons, Pile caps, Footings of FOB etc.

265

120

31985.5

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, pillars, , posts and struts

1800

256

462240

... More
Providing and laying Plain Cement Concrete 1:3:6 with graded stone aggregate of 40 mm 11 nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer

300

1373

411951

... More
Providing and laying in position machine mixed, machine vibrated and machine batched Design Mix Cement Concrete M35 grade (Cast - in Situ) In Bottom/top slab, side walls, toe wall and sumps haunch filling head walls or any other component using 20 mm graded crushed stone aggregate and coarse sand 12 of approved quality of cast-in-situ RCC box of size upto 5 M (bigger inside dimension) including finishing, Admixtures in recommended proportions (as per IS 9103), if approved in Mix design, to accelerate, retard setting of concrete, improve workability without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in charge. Payment for cement, reinforcement and shuttering shall be paid extra

1610

1592

2564295.3

... More
Dismantling steel work and trusses upto 10m span and 5m height in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50m lead

31500

1

34965

... More
Extra over item 186020 & 186030 for dismantling trusses, rafters, purlins etc. of steel work for additional span length of one metre or part thereof beyond 10m

31500

-

5040

... More
Extra over item 186030 & 186040 for dismantling trusses, rafters, purlins etc. of steel work for additional height of one metre or part thereof beyond 5m

31500

-

5040

... More
Providing and fixing 75 mm PVC soil, waste and vent pipes including jointing and cost of spun yarn and sand etc., complete

350

138

48384

... More
Leading miscellaneous materials such as iron work, rails, pipes, wooden logs, stones over 17 pitching stone size, RCC/PCC beams / slabs etc. and all similar articles (each individual article or bundle being more than 3.5 metres long in the longest direction) by truck, trailor, etc including all loading, unloading and stacking, lead over 500m and upto 10 km. Note : Lead under this item is payable when the same exceeds 500m.

30

151

4543.5

... More
PLEASE SEE ITEM NO.021171 IN ITEM BREAKUP

-

-

19980

... More
Providing and applying two coats of coal tar or bitumen confirming to IS 3117 - 1965 on the top and sides of RCC box/slabs @ 1.70 Kgs / Sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer

650

102

66300

... More
Sealing of cracks/porous concrete by injection process through nipples/Grouting complete as per Technical Specification Epoxy Grout

140

689

96496.4

... More
Supplying Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars

149550

52

7848384

... More
Supply and using cement at worksite : PPC

968

5635

5454680

... More
Spreading of stone ballast on track and points & crossings from the quantity available on the 1 formation/or toe of bank/top of cutting / or cess within railway land/outside land on the formation in bank and cuttings as directed by the Engineer-in-charge with a free lead upto 100 meters and lift upto 3.0 meters inclusive of descent, loading, unloading, labour and materials required including crossing one or more running railway lines if required etc. complete.

280

73

20440

... More
Renewal of sleepers i.e.removing the existing sleepers and its fastenings including stacking them outside track clearing removed sleepers from all infringement to moving dimenson inserting new sleepers 4 at specified spacings alongwith fastening, including tightening of fastening (sleepers at site involving lead not more than 100m.) including leading of both new and released sleepers and fastenings from site to track & vice- versa. Renewal of ordinary wooden or CI or steel sleepers by concrete sleepers irrespective of any sleeper density existed and to be provided for.

180

53

21860.1

... More
Collecting & stacking wooden /steel /C.I. sleepers ready for loading in D.M.T. within a lead of 30m. (C.I. sleeper means two plates & one tie bar) including existing track fittings and fastenings i.e. keys, cotters, bearing plates, fish plates, fish bolts, tie bars etc.

180

2

898.92

... More
Loading PSC sleepers in BFRs including existing fitting and fastening i.e. pendrol clips, rubber pads, liners, fish plate & bolts etc. during traffic block including lead upto 30m.

180

12

5168.79

... More
Trollying rails and sleepers under traffic block by Rly's diplorry including loading into diplorry upto 30m lead, unloading and stacking at the destination as per direction of Engineer-in-charge with a free lead upto 30m.and carrying the rails over diplorries upto 1 Km. Z/75 45.00 MT 24.30 1093.50 127.00 2482.25

45

145

14908.79

... More
Through packing of screened track as described in Indian Rly.'s permanent Way Manual of any type of sleeper before relaxation of speed-1st packing including picking up slacks in between kutcha packing and 1st packing as per requirement.

180

8

3289.23

... More
Supplying skilled/artisan staff like welder, moulder, chipper, lutter, aligner, striker/hammerman & adequate Nos. of semi-skilled and unskilled labour and supplying petrol @ 1.6 litres/joint for facilitating welding works on track by shifting the joint sleepers upto 30cm. (1' - 0") on either side, providing 16 suitable gap of about 23mm to 25mm.by pulling back of rail including removing keys, spikes & other fastenings as required and refixing the same after welding, clearing the rail ends, fixing the Petrol tank & heating the rail, ends by railways/approved Contractors equipment and chipping the excess materials if required, bringing the shifted joint sleepers to the specific spacing and packing them to the required specification as directed including adjustment of required gaps for welding, aligning, levelling etc. complete including Contractor's own files for filing after welding in running track.

6

442

6029.57

... More
Through packing of screened track as per Indian Rly.'s permanent Way Manual of any type of sleeper before relaxation of speed-2nd packing or 3rd packing.The item also includes picking up of slacks between 1st packing and 2nd packing or between 2nd packing and 3rd packing.

180

6

2778.48

... More
Conventional through packing of screened track following 3rd packing as per Indian Rly.'s Permanent Way Manual. The item also includes picking up slacks between 3rd packing and consolidation packing. Z/36 180.00 Per Sleeper 12.90 2322.00 127.00 5270.94

180

4

1981.71

... More
Unloading of PSC sleeper from BFR on to the cess along the track in block period.

180

12

5270.94



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.