South East Central Railway Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

South East Central Railway - SECR Tender

Goods
Civil And Construction
Excavation
Ireps
Opening Date5 Apr 2024
Closing Date10 May 2024
Tender Amount₹ 6,81,93,423.27 
Notes
Download

Costs

Summary

Execution Of Phase-ii Tmr Yard Remodelling Work Including Realignment Of Tt Line In Connection With 3rd Bg Railway Line Between Kalumna - Rajnandgaon Stations Of Nagpur Division Of Sec Railway

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Turfing / planting, including watering as required until properly rooted with. 9Turfing with doob grass ). Note : "Sqm" Stands for Per 100 Sqm ".

70

2476

173320

... More
Supplying and spreading of blanketing material of approved quality and grading as per latest guide lines of RDSO given in the tender document (mechanical mixing of granular materials like coarse sand/moorum/crushed stone materials in suitable proportions is to be done to obtain the gradation & 5 specifications) brought from outside the railway land and to spread on the formation in cutting and embankment in layers not exceeding 30cm each in thickness using graders and compaction using adequate capacity vibratory compactors so as to achieve minimum in situ dry density of 98% of MDD (compaction will be paid for separately) as directed by the Engineer-in- Charge or his representative etc. complete as required. The agency has to establish batching plant/blending machines for mixing of raw materials to produce uniform blanketing materials of desired specifications.

2600

1184

3078400

... More
Earthwork in excavation for bridge foundation, retaining wall/toe wall foundations, piles cap/pile ties, etc.( including wet excavation, shoring, strutting if required), back filling and leading the remaining earth as directed. ( In all conditions and classification of soils including rock not requiring blasting/chiseling.).

2615

167

436705

... More
Dismantling of concrete, stone masonry/ RCC/ Brick masonry and removing, stacking of serviceable material and disposing of unserviceable material within sectional limits.

50

377

18850

... More
Mass Concrete 1:3:6 nominal mix/ M-10 in levelling course, bottom most footing, steps, filling of annular space around well foundations, etc.

125

3873

484125

... More
Mass Concrete M-20 or richer design mix with or without skin reinforcement in foundation and superstructure of abutments, piers, return, wing walls, toe walls, etc.

1365

4504

6147960

... More
Execution o f cast i n s itu R C C M-25 o r r icher design m i x i n foundations, substructure and superstructure for bridges, retaining wall, toe wall etc. (a) In foundation.

60

4588

275280

... More
Execution o f cast i n s itu R C C M-25 o r r icher design m i x i n foundations, substructure and superstructure for bridges, retaining wall, toe wall etc. (b) In sub-structure of pier, abutment, return wall, bed block, deck slab etc.

150

4710

706500

... More
Supply, spreading and compacting granular backfill material behind abutments. Backfill material will consist of sand/moorum of approved quality of GW, GP, SW groups as per IS:1498 and should be free of clay and cement.

850

608

516800

... More
Earthwork in excavation in drain etc.( including wet excavation, shoring, strutting if required), back filling and leading the remaining earth as directed . a) In all conditions and classification of soils includingrock not requiring blasting/chiseling.

1500

174

261000

... More
Mass Concrete 1:3:6 nominal mix/ M-10 in levelling course, bottom most footing, steps, filling of annular space around well foundations, etc.

100

4035

403500

... More
Execution of cast in situ RCC M-20 or richer design mix in drain etc.

400

4863

1945200

... More
Mass Concrete M-20 with or without skin reinforcement in foundation and superstructure etc.

225

4504

1013400

... More
Boulder filling behind abutments returns/ wings and in protection works with hard stone boulders of approved quality and size normally weighing not less than 30 Kg each, hand packing etc complete.

200

1002

200400

... More
Dry stone pitching/ soling hand packed in the required depth in floors of bridges, aprons, along side slopes of banks and cuttings with surface leveled off to the correct section.

200

1174

234800

... More
Dry stone pitching with stone of approved quality and size with cement grouting in cement mortar 1:3 etc complete.

175

1577

275975

... More
Supply and delivery of machine crushed Hard Stone ballast conforming to the Railway standard 1 specifications of track ballast of June-2004 (Corrected up to date of issue of tender notice ) issued by RDSO, to be brought from outside Railway land and stacking the same on completed formation and/or either along the toe of the bank or along the edge of cutting or yard or as directed by the Engineer in charge etc complete as required.

2500

2110

5275000

... More
Supply and using cement at worksite : PPC

750

5635

5367337.5

... More
Supplying Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars

73000

52

6321216

... More
Casting of foundation block of size 300mm x 300mm x 450mm in plain cement concrete of 3 proportion 1:3:6 with contractor's cement, sand, aggregate and other materials of approved quality as required, excavation and fixing of indicator board for curves, SEJ, points & crossings including transportation of boards from Railway's store depot to the site of fixing as indicated by the Engineer- in-Charge or his authorized representative. The rate includes cost of cement and other materials. Per Track

24

524

12576

... More
Manufacturing and supplying and fixing of various engineering indicator boards such as LWR/Curve Board/Gang Board/Point Board/ Bridge Name board/jurisdiction board, Caution Indicator Board, Speed Indicator Board or any other board of various sizes as per the provision of IRPWM corrected upto date of 7 issuing of the tender approved drawing, partially retro reflective of Engineering grade having stove enameled background and 12mm dia holes drilled for fixing with bolt & nut of 10mm dia made out of 16 SWG M.S/C.R. Sheet, painted with non peel able weather proof one coat of zinc chromate stoving primer on both sides, and two coats of painting of color scheme as mentioned in the IRPWM on both side black letter, black band and any other black part of front face all stove enamel painted on front side and grey stove enamel on back side to IS shade No. 630 French grey conforming to respective drawings complete with contractor's materials, etc complete.

5

10665

53325

... More
Manufacturing and supplying and fixing angle iron post of size 50mm x 50mm x 5mm, with back support of angle iron size 35mm x 35mm x 3mm of 900mm long spot welded at 450 mm away from bottom of post, inflated at bottom, drilled on top and smaller size angle iron for curve, LWR, points, gang board etc. as 8 advised by Engineer -in-charge and painted with one coat of red oxide primer and alternate two coats of white & black bands of 300 mm width of synthetic enamel paint, with required G.I. bolt & nut of size 10mm dia of 20mm Long for various indicator sign board confirming to the respective drawings complete with contractor's materials etc complete for Bump, Level Crossing Guard Indicator, Stop Danger Board, Caution Indicator, Speed Indicator, Whistle Indicator. Note: "KG" stands for "Per KG".

50

153

7650

... More
Providing of Semi-skilled labour for Push trolleying with Railways push trolley, Miscellaneous work during NI work, pre-NI working etc.

50

473

23650

... More
Removal of 90R/52 Kg./60 Kg. Points and crossings with existing steel/ wooden/PSC sleepers and 10 fastenings thereon, stretcher bars, check rails etc. complete in running/non-running track including switches (straight or curved) & crossing and lead rail portion and stacking the dismantled Pts. & Xings including switches, crossing, sleepers and rails at places as directed by the Engineer-in- charge with a free lead up to 30 metres. (a) 1 in 8.5, Note: "Set" stands for "Each Set".

1

22974

22974

... More
Removal of 90R/52 Kg./60 Kg. Points and crossings with existing steel/ wooden/PSC sleepers and 11 fastenings thereon, stretcher bars, check rails etc. complete in running/non-running track including switches (straight or curved) & crossing and lead rail portion and stacking the dismantled Pts. &Xings including switches, crossing, sleepers and rails at places as directed by the Engineer-in- charge with a free lead up to 30 metres. (b) 1 in 12. Note:"Set" stands for " Each Set".

2

37382

74764

... More
Removal of 90R/52 Kg./60 Kg. Points and crossings with existing steel/ wooden/PSC sleepers and 12 fastenings thereon, stretcher bars, check rails etc. complete in running/non-running track including switches (straight or curved) & crossing and lead rail portion and stacking the dismantled Pts. & Xings including switches, crossing, sleepers and rails at places as directed by the Engineer-in- charge with a free lead up to 30 metres. (c) Derailing switch. Note: "Set" Stands for "Each Set".

1

9929

9929

... More
Construction of buffer end as per CE's Drg. No. 23772 with Rly's Rail of 90R/52 Kg with 1:3:6 13 concrete the rate includes cutting of rails of required length, bending of rails as per the drawing, transportation of rails from Rly, store depot to site, fixing of sleepers, fish plates, nuts and bolts, cleats, white wash and painting of wooden sleepers, excavation of foundation to the required depth etc complete. (Sleepers will be supplied by Railway) (cement will be paid separately)

1

92408

92408

... More
Providing of 5 KVA Diesel A.C. Generator for night working. Note: " Set" stands for " per set per night".

10

3443

34430

... More
Running cost of generator with Contractor's fuel, lubricants and all consumable and maintenance of generators. The contractor is to employ the generator operator and helpers, the rate includes the same and nothing extra will be paid on this account." Set" stands for " per set per hourst".

40

153

6120

... More
Providing of' level crossing, of all classes across newly laid Rly. line with contractor's labour, tools and plants with Railway's materials except bolts and nuts which are to be supplied by the contractor(s) as per Railway's standard specifications for "A"/"B"/"C" class level crossing with fabrication of check rails as per approved 17 drawings, fixing of check rails of required length, fixing of W/L Boards, Danger Boards, etc. complete. The rate includes drilling of holes in running lines, check rails manufacturing and fixing of check rails, fixing of Gate posts, with other ancillary and incidental works like fixing of PSC sleepers, making the Central Portion of the line to the required level including making approaches as per specification etc. complete. Cost of Various boards will be paid separately. Per Metre

1

40750

40750

... More
Laying and fixing of guard rails including all leads , lifts etc. complete as directed by Engineer-in- charge at site. (b) On approaches of bridges . Note : "Each Bridge" Stands for Per Bridge ".

1

4604

4604

... More
Insertion of GFN liners in existing track circuiting work in place of metal liner including opening of ERC greasing ,re-fixing and tightening with contractor's , labour . tools & plants, leads , lifts , loading, unloading and carrying the released metal liner to Rly. store as directed by Engineer-in- charges.

10000

3

30000

... More
Welding of Rail joints 60 Kg. Single Rails/ 3 rail panel/l0 rail panel/20 rail panel in situ/on cess with SKV process with Contractor's portion approved by RDSO (to be supplied by authenticated certificate) dry, three 25 piece pre-fabricated moulds manually pressed (Zircon washed) using single shot crucible fitted with Auto tamping thimble, developed by any RDSO approved firm, petrol, welders, (possessing competency certificate issued by RDSO) skilled luter, welder, moulder, cutter, chipper, aligner, striker/hammer man, semi skilled staff, unskilled labour with contractor's tools and plants, and all consumable materials including petrol, including all leads, lifts, carrying of materials to the site of work etc all complete. (a) 60 Kg. Rails.

100

9693

969300

... More
Welding of Rail joints 60 Kg. Single Rails/ 3 rail panel/l0 rail panel/20 rail panel in situ/on cess with SKV process with Contractor's portion approved by RDSO (to be supplied by authenticated certificate) dry, three piece pre-fabricated moulds manually pressed (Zircon washed) using single shot crucible fitted with Auto tamping 26 thimble, developed by any RDSO approved firm, petrol, welders, (possessing competency certificate issued by RDSO) skilled luter, welder, moulder, cutter, chipper, aligner, striker/hammer man, semi skilled staff, unskilled labour with contractor's tools and plants, and all consumable materials including petrol, including all leads, lifts, carrying of materials to the site of work etc all complete. (b) 52 Kg. Rails.

10

9534

95340

... More
Unloading of stone ballast from Railway's hopper type wagons on the formation in the section and Station yards as directed by the Engineer-in-Charge.

100

27

2700

... More
Loading of Railways ballast in to wagons at stations /Depots/mid section and all lifts and unloading of same in the section ,spreading to correct profile with all lead, lift etc. complete.

100

86

8600

... More
Fabrication of In-Situ Glued insulated Joints of G-3(L) Type for 60 kg/52Kg rails in existing tracks 29 under traffic blocks as per RDSO drawing No.T-671, T-2572/T-5843 and conforming to the specification as per instructions contained in manual for glued insulated rails joints (up to date correction slip ). The rate of this item includes cost of all Rail cutting, cleaning of ends, chamfering of holes, during block labor, material, fittings and accessories, tests etc. as specified in enclosed Special Conditions & Specifications of work.

61

19808

1208288

... More
Cutting of 60 kg /52 kg Rails with abrasive rail Cutter (Block work)

200

569

113884

... More
Cutting of 60 kg /52 kg Rails with abrasive rail Cutter( Non Block work)

200

266

53212

... More
Drilling of holes in 60 kg Rails including chamfering of holes as per specifications and as directed by Engg.in charge.

409

107

43979.77

... More
Execution of all works in connection with above work covered under section Chapter-2 of USSOR- 2010 edition with upto date correction slips .(021170, 021171, 021172,021173)

1

50000

87000

... More
Execution of all works in connection with above work covered under section Chapter-2 of USSOR- 2010 edition with upto date correction slips.(021150, 021151, 021152, 021153)

1

-

172000

... More
Execution of all works in connection with above work covered under section Chapter-2 of USSOR- 2010 edition with upto date correction slips .(021131 & 021132)

1

365000

635100

... More
Lum Sum for misc item which are not cover in any schedule (As per USSOR)

-

-

6765000

... More
Execution of all works covered under South East Central Railway Schedule of Labour and Material Rates 2006, excluding items covered under schedule of this tender document.

-

-

867000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.