South East Central Railway Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

South East Central Railway - SECR Tender

Goods
Other Consultancy Services
Consultancy Services
Ireps
Opening Date25 Jan 2024
Closing Date19 Feb 2024
Tender Amount₹ 27,81,146.6 
Notes
Download

Costs

Summary

Conducting Final Location Survey Of Durg-marauda Flyover (17 Kms.).

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Casting, transporting and fixing precast RCC boundary pillars with M-15 grade of size 350mm (bottom), 230mm (top), 1550mm height, 100mm thick or as per approved drawing/sketch supplied including 4 engraving the letters SECR and applying one coat of primer, and two coats of red enamel paint and painting the engraved letters with white paint including excavation of pit and fixing into ground up to 900mm depth with contractors OP cement, steel, labour, tools, materials, all lead and lift involved, curing etc. complete as per specifications and as directed by the Engineer-in-Charge.

500

331

165500

... More
Extra for Revision/Modifications in L-Sections/ Plans by Railway after final approval of Engineer-in- charge in each sheet and submission of another set of coloured drawing on tracing, three copies of white print and soft copy for final approval. (Note: Here Qty unit "Job" stands for "Each Sheet")

5

706

3530

... More
Preparation of existing & proposed layout plan including detailed plan/section of station building, 6 quarters, structures on Auto CAD and submission of print on white paper and tracing for approval of Railways. Note: a) Railway type plan of buildings and structures shall be used in general. b) Rate includes submission of check print and carrying out corrections/observations as suggested by Railway Authority.

10

1294

12940

... More
Preparation of LWR/CWR and Weld Plans: For Continuously Welded Rail (CWR) track for as much length as possible, for which the Contractor shall prepare the CWR plans for the approval of the Employer in accordance with the design principles/provisions contained in IR LWR (Long Welded Rail) Manual based on approved Track Structure. The consultant shall submit advance copy of the Weld Plans on white paper for approval of Employer. After the approval of Employer, the Consultant shall submit drawings in 3 (three) hard coloured copies on Polyester based tracing paper (100 to 150 Microns) and two soft copies on CD. The scope includes required corrections and modifications as suggested by approving authorities of Railways till its final approval. Required follow up with various approving authorities including required explanations on various provisions/facilities in the ESP shall be arranged by consultant. Note: i) The colour scheme to be followed in the drawing shall be as per standard practice of IR. ii) Payment will be done as per Stages given below - Submission of Weld Plans and approval by Dy.CE/GSU/R and CPM/GSU/R : 60%. - Submission of Weld Plans and approval by Divisional HQ: 15%. -Submission of Weld Plans and approval by Zonal HQ: 15%. - Submission of Weld Plans in hard & soft copies: 10%.

17

124

2108

... More
Preparation and submission of layout plan of proposed level crossing incorporating standard Type 8 plan of duty bunk of S.E.C. Rly including re-grading plan and diversion plan of approach road if any, as per IRPWM chapter-IX on Auto Cad and submission of print on white paper and tracing for approval of Railways. Note: Rate includes submission of check print and carrying out corrections/observations as suggested by Railway Authority.

4

1343

5372

... More
Preparation of the General Arrangement Drawing for all minor bridges based on finalized L-section for the proposed alignment & detailed geotechnical investigation carried out by the contractor under separate schedule. The rate includes collection of hydrological data, calculation of waterway etc. complete.

34

4192

142528

... More
Preparation of the General Arrangement Drawing for all RUBs/ROBs based on finalized L-section for the proposed alignment & detailed geotechnical Investigation carried out by the contractor under separate schedule.

5

4026

20130

... More
Calculation of land widths and preparation of land plans in original on tracing cloth/film of 70 microns required for the land to be acquired duly indicating chainages and widths along with alignment including station yards to a suitable scale as directed by the Engineer-in-charge.

17

643

10931

... More
Preparation and submission of land acquisition proposals duly collecting land and village maps from revenue authorities and marking the proposed alignment including land widths for land acquisition purpose including copies of pahanis/Nakshas and khasras of Individuals from the Revenue department of relevant 12 districts/villages including plotting the details of length and width of land requirement and all other parameters as required for land acquisition, furnished details in form A & D and making booklet with all contractor's Engineers supervisors /Technical assistants, drawing and other required equipment, overhead charges etc. required for collecting the details from revenue department as directed by the Engineer-in-charge in consultation with railway department.

17

1517

25789

... More
Preparation of necessary documents for issue of notifications under Section-11, 12 & 19 or as per any other relevant section of the New Land acquisition act-2013 or old act in force for stage-I & II approvals duly attending the JMC of revenue forest and railway authorities including making arrangements for conveyance to the officials necessary labour for pulling chains and fixing flags etc. and assisting in taking measurements, preparation of sketches, making the booklets in 6 copies to submit to the revenue authorities with all contractor's 13 supervisors, tools, vehicles, consumables, all lead and lifts involved, stationery, Xerox copying charges etc. complete and as directed by Engineer-In-charge. Note for 11,12,13- If projects declared as 'Special Railway Project' than land acquisition be processed as per New RAA-2008 and accordingly proposal be prepared as Para 20A,20E Tec. Note for Item No.11, 12, 13: Above items are related to submission of proposal as per land acquisition Act, so if project is approved as Special Railway Project' as per New Railway Amendment Act 2008 for acquisition of land, description of item be treated as per Para-37A, 7A, 20A, 20E etc. and accordingly proposal should be submitted.

17

3569

60673

... More
Collecting and submitting a tabulated data as per direction of the site-in-charge regarding the 14 locations of nearest SP/SSP/TSS (with details of their locations w.r.t. the existing railway tracks & possibility of their extension/ relocation) maximum wind speeds, pollution levels, type of pollution at every Km. (especially near pollution causing Industries) or any minor details as desired at specified location to be indicated by site- in- charge.

3

376

1128

... More
Site selection and demarcation of required water way and configuration of spans for major bridge and important bridges Including levelling for profile of stream bed, along the main stream on upstream and downstream side, computation of catchment area of the stream, collection of hydrological data, Hydrological calculations as per sub structure code/RDSO guidelines for deciding water way for bridges including computation of scour depth, construction of pucca CC mattams on approaches and preparation of GAD plan for bridges etc. complete. Note: The item includes (1) River survey to be done as per provision of Engineering Code 8Km on 15 upstream side and 2Km on downstream side for proposed centre line alignment intercepting the river or stream Recording bed levels along the main stream of river and three typical sections of river as directed by Engineer-in- charge. 2) Plotting on Auto Cad the L- section of river bed and typical cross sections of river, plan of the river on upstream. Up-to 8Kms and on downstream up-to 2Kms from the alignment. computing the catchment area / water shed line of river centroid of catchment area using Auto Desk 3D civil software and Google Earth, submitting along the hydrological calculations in hard copy (6 nos.) as well as soft copy as per Railway code/RDSO guidelines and as directed by Engineer-in-charge. 3) General note- Before submitting the detailed drawings for all the above items of the work, one draft hard copy is required to be submitted for scrutiny and checking by the Railways for obtaining the approval of competent authority and making corrections/editing and finally submitting the required number of hard copies, final tracings and soft copies duly incorporating all necessary corrections etc, complete.

5

7898

39490

... More
Hydrological investigation for Bridges using DEM: Conducting hydrological investigation including detailed calculation for important major/minor bridges using Digital Elevation Model (Geological information system) Tasks: 1. Marking of all bridge locations on index plan of the alignment. l. Delineating the catchment boundary of bridges from DEM and calculating physiographic parameters of the catchment area, longest stream, slope lil. Calculating design discharge (Q50) for all bridges based on RBF 16/ RBF 22 reports for small catchments and synthetic unit hydrograph from flood estimation report for large catchments (> 25 sq km), iv. Consultant will verify if there are any dams/water storage structures in the catchment and obtain regulated flow 16 discharge from concerned authority for calculation of design discharge. v. Checking of adequacy of proposed linear waterway, vertical clearance, free board and depth of foundation. Soil investigation report for scour depth calculations will be provided to the consultant. Deliverables i. 3 copies of report with bridge wise hydrological calculations should be submitted. Separate booklets should be prepared for major and minor bridges. ii. For each bridge, calculations and catchment plan with longest stream marked on Survey of India toposheet should be submitted. For bridges with large catchments, unit hydrograph and calculation of equivalent slope should also be submitted, iii. Catchment plan should be marked on 50 year 24 hr rainfall map to verify correctness of rainfall data used and the same and the same submitted in the booklet: iv. The following are required to be submitted as softcopy-calculation spreadsheets, Google Earth KML files of catchment plans, longest stream, alignment and bridge location. (A) For Minor Bridges.

25

1045

26125

... More
Aerial Videography by unmanned aerial vehicle (UAS-Drone) and submission of digital data/digital image/video in CDs.

17

2617

44489

... More
Submission of project report for Final Location Survey & detailed estimate with preparation of detailed schedule of quantity for formation work, ballast supply. The report should consist of quantity of earth work, blanket material, ballast, length of retaining walls, length of side drains etc. detailed quantity of various 18 Items of minor, major, important bridges, ROB, RUB & cost of estimation thereof. The estimate shall be updated to include items as per the latest practice of Railway & Railway Board's instructions. The rates adopted for schedule of quantities & detailed estimate should be latest & realistic. Rate analysis should be submitted as per instruction of Engineer-in-charge. Note: The details of quantities shall be submitted block section wise during progress of work. Note: (a) The rate includes preparation and submission including modification for ROR of the project. It includes conducting Traffic Survey and preparation of ROR.

17

1328

22576

... More
Preparation and submission of documents for EPC Tender/Tenders for entire section/various 19 sections as directed by Railway authority. The BOQ shall have to be prepared according to stage wise payments as given in Standard EPC documents for Railways. Standard document is available in Railway Board's web site or as directed by the Engineer-in-charge. The latest document of EPC Tender has been circulated by Railway Bd vide letter No.2018/CE-I/CT/36-EPC Contract Policy Pt,I, dt.15.11.2021.

1

49456

49456

... More
Execution of all works connected with the subject work covered under USSOR-2010 of SEC Railway excluding the items under different schedules of this tender.

-

-

50000

... More
Execution of detail Survey of site for existing utilities, cable routes, building and S&T installations which includes the following: a) Identification of infringement for new work. b) Planning for shifting of existing S&T utilities. c) Identifying site for tentative S&T Service Building, goomty, IBH etc for new works. d) Prepare Tentative cable route, location plan and requirement etc. for preparation of estimate of work. e) Preparation of drawing 1 showing new plan/scheme, existing utilities etc. clearly depicted in approved colour code. f) Submission of proposed plan in 6 set of hard copies (Paper Print) to Railway. g) Preparation of S&T Roll Diagram of the section clearly indicating all yards, LC Gates, IBH, Signals, Points, Track Circuits/Axle Counters etc. h)Submission of digital scanned copy of approved plan along with soft copy in editable format. i) Preparation of Draft DPR, checklist and other documents for approval. Final copy of DPR to be submitted in 3 copies along with Engineering DPR.

17

2111

35887

... More
Preparation of tentative SIP based on ESP of yards and submission of 04 sets of draft copies for approval. Final copy of SIP to be submitted in 6 sets of paper copies for DPR with one digital scanned copy plan along with soft copy in editable format. Note:- Unit to be read as "Per line" instead of Each.

18

12235

220230

... More
Preparation of SIP of Interlocked LC Gates, Location Survey drawing of IBH etc. and submission of 04 sets of draft copies for approval. Final copy of SIP to be submitted in 6 sets of paper copies for DPR with one digital scanned copy plan along with soft copy in editable format

3

6388

19164

... More
Preparation & supply of SED & As erected Drawing.

17

133620

133620

... More
Preparation and supply of drawings for power Line crossings with general arrangements with 3 respect to the railway tracks as well as indicating all safety clearance & norms being followed or not as laid down in the ACTM (Regulations for power line crossings of Railway Tracks issued by Railway Board in 1987 and modified /corrected from time to time).

5

4660

23303.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.