Public Works Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Works
Civil And Construction
Bridge Construction
Opening Date24 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 1,14,24,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) as per relevant Clause of section 300 & 2100 in. A ordinary soil (iI) 3.0 to 6.0 M depth

166.15

29967

180.36

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) as per relevant Clause of section 300 & 2100 in. A ordinary soil (iIi) Above 6.0 M depth

82.44

18252

221.4

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) as per relevant Clause of section 300 & 2100 in. A ordinary soil (i) Up to 3.0 M depth Add extra 20 % in the rates of above itemsfor dewatering (Assesment of dewatering shall be made as per site condition)

388.4

73489

189.21

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) as per relevant Clause of section 300 & 2100 in. A ordinary soil (iI) 3.0 to 6.0 M depth Add extra 20 % in the rates of above itemsfor dewatering (Assesment of dewatering shall be made as per site condition)

419.55

90803

216.43

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) as per relevant Clause of section 300 & 2100 in. A ordinary soil (iIi) Above 6.0 M depth Add extra 20 % in the rates of above itemsfor dewatering (Assesment of dewatering shall be made as per site condition)

116.53

30960

265.68

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) as per relevant Clause of section 300 & 2100 in. III Hard roc k (required blasting)

302.27

221334

732.24

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) as per relevant Clause of section 300 & 2100 in. I Ordinary soil (I) The cost of shoring and shuttering, when needed, be added at 1 percent on cost of excavation for open foundation (i) Up to 3.0 M depth

604.54

950

1.57

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) as per relevant Clause of section 300 & 2100 in. I Ordinary soil (I) The cost of shoring and shuttering, when needed, be added at 1 percent on cost of excavation for open foundation (i) 3.0 m to 6.0 M depth

516.15

930

1.8

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) as per relevant Clause of section 300 & 2100 in. I Ordinary soil (I) The cost of shoring and shuttering, when needed, be added at 1 percent on cost of excavation for open foundation (i) Above 6.0 M depth

82.44

183

2.21

... More
Filling Annular Space Around Footing in Rock (Lean cement concrete M-15 nominal mix.)

21.09

105072

4982.04

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications and as per relevant Clause of section 1500,1700 & 2100 with ( A) Using concrete mixer (i) P.C.C. M-15

5.03

25060

4982.04

... More
Providing and laying Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications ( A) Using concrete mixer (vii)R.C.C. M-30

81.03

524375

6471.36

... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications as per section 1600.

2.53

187875

74188.44

... More
Providing and laying Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications section 1500, 1700 and 2200 (Newly laid concrete shall be covered by gunny bags) ( A ), Height upto 5 m , (a) Using concrete Mixer (iii) RCC Grade M 30

242.66

1798344

7410.96

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications section 1600 and 2200

16.26

1211731

74522.16

... More
Providing weepholes in Brick masonary / Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing face . Complete as per drawing and technical specification and as per clause 2706 & 2200

65.24

22618

346.68

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification 710.1.4 of I.R.C. 78 and 2200 Granular material

500.48

489170

977.4

... More
Providing & laying of filter media with granular materials / stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MORTH specification to a thickness of not less than 600 mm with smaller towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification 710.1.4 of IRC 78 and 2200

257.9

536453

2080.08

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications section 2000 and 2200

93600

101088

1.08

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in Super-structure as per drawing and technical specification sections 1500,1600 and 1700 (Newly laid concrete shall be covered by gunny bags) (B) RCC Grade M-30 ( I ) For Solid Slab Super Structure (a) Using Concrete Mixer (ii) Height 5.0 m to 10.0 m

274.59

2153895

7844.04

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

27.2

2059287

75709.08

... More
Providing & laying CC wearing coat M30 grade including reinforcement complete as per drawing and technical specifications

32.06

410201

12794.76

... More
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. (vide drawing No. SD/201, SD/304)

114

223956

1964.52

... More
Drainage Spouts complete as per drawing and Technical specifications of section 2705

17

36849

2167.56

... More
PCC M-15 Grade Leveling course below approach slab complete as per drawing and technical specification and as per relivant section 2700

12.37

59277

4791.96

... More
Providing and laying M-30 grade Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification and as per relevant sections 1500, 1600, 1700 and 2704

25.2

257654

10224.36

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorized representative ensuring compliance to the manufacturer's instructions for installation.)

33.6

403668

12013.92

... More
Providing and Fixing of Av. 20mm thick Granite plate i/c cutting and polishing and inscribed details as per approved drawing i/c engraving the matter as desired.

2

14256

7128

... More
Testing of span of bridge for deflection due to live load with platform for loading arrangements, apparatus for measurement etc. complete as per drawing and specifications (As per I.R.C.S.P.51)

77

70686

918

-

11338652

-

... More
1 Years

-

8500

-

... More
2 Years

-

12750

-

... More
3 Years

-

17000

-

... More
4 Years

-

21250

-

... More
5 Years

-

25500

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.