Public Works Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Works
Civil And Construction
Opening Date4 Oct 2024
Closing Date12 Oct 2024
Tender Amount₹ 8,21,97,561 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Air Conditioned Exhibition Hall 1 Water Proof Aluminium German Hanger (AC) with Glass Door braced and tied with minimum side height of 6M made of aluminium extrusions with base plate that are anchored to the ground and covered with SRF material that is fire retardant. The hanger structure should be able to withstand wind speed upto 100 KMPH. The Hanger will be completely weather proof and with adequate number of entry exit points including emergency exit with proper Aluminium and Glass Doors.Roof covered with good quality PVC Fabric cover (SRF), ceiling with Theme Based cloth Drapping and creating themtic side wall, Interior work as per the usage and purpose of room. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels with waiting lounge and providing necessary tables, sofa, chairs, dustbins is a part of scope of work. Providing 200 to 400 mm raised platform with 19 mm thick Plywood/block boards supported by wooden logs and covered with good quality of New synthetic carpet. Front facade with minimum 6 mm ply fixed on wooden/steel frame work and painting etc. complete. The scope shall cover to provide general lighting, fans, AC. Necessary minimum 40 nos. electrical points (5/15A plug points), wall fan/ ceiling fan/ padestral fan/ exhaust fan as per requirement, General lighting (using PAR lights/Metal/Halogen/CFL/LED lights, etc.) for inside dome and for preparation of facade as per theme approved by Department as per Instruction is a part of scope of work. The entire area should be air conditioned and temperature should be maintained between 23 to 26 degree Celsius equally distributed. All materials have to be fire-retardant material and necessary documentation evidence/certificates are to be provided. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).( Hanger size 40m x 70m ) Note : There will be a common connecting outer facade and rates for that will be quoted in respective item.

2800

-

-

... More
Exhibition Stalls :Maxima prefabricated aluminium Stalls providing 2 no. cushioned chairs, 1 no. laminated table and racks, Decorative theme based fascia with name of the stall holder,Dustbin etc. for 3m x 3m stall. The scope shall also cover to provide mandatory proper general lighting using spot lights/PAR lights/Metal/Halogen/CFL/LED lights, etc.), 2 nos. of plug (5/15 A) points and 20 A MCB points in each stall (If required)(As per direction of committee, in this regard the decision of engineer in charge will be final and binding). ( Stalls sizes as per requirement. )

1041

-

-

... More
Air Conditioned Exhibition Hall 2 Water Proof Aluminium German Dome with Glass Wall Facade of 30 Rmt with connecting pathway between Halll 1 & 2 with creating ambience with proper decorative pathway & general lightng.German aluminium temporary hanger with minimum side height of 6M made of aluminium extrusions with base plate that are anchored to the ground and covered with SRF material that is fire retardant. The hanger structure should be able to withstand wind speed upto 100 KMPH. The Hanger will be completely weather proof and with adequate number of entry exit points including emergency exit with proper Aluminium and Glass Doors.Roof covered with good quality PVC Fabric cover (SRF), ceiling and Themetic creative branding side wall with Theme Based cloth Drapping is part of scope of work. Interior work as per the usage and purpose of room. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels with waiting lounge and providing necessary tables, sofa, chairs, dustbins is a part of scope of work. Providing 200 to 400 mm raised platform with 19 mm thick Plywood/block boards supported by wooden logs and covered with good quality of New synthetic carpet. Front facade with minimum 6 mm ply fixed on wooden/steel frame work and painting etc. complete. The scope shall cover to provide general lighting, fans, AC. Necessary minimum 40 nos. electrical points (5/15A plug points), wall fan/ ceiling fan/ padestral fan/ exhaust fan as per requirement, General lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.) for inside dome and for preparation of fascade as per theme approved by Department as per Instruction is a part of scope of work. The entire area should be air conditioned and temperature should be maintained between 23 to 26 degree Celsius equally distributed. All materials have to be fire-retardant material and necessary documentation evidence/certificates are to be provided. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding). ( Hanger size 40m x 70m ) Note : There will be a common connecting outer facade and rates for that will be quoted in respective item.

2800

-

-

... More
Exhibition Stalls :Maxima prefabricated aluminum Stalls providing 2 no. chairs, 2 no. laminated Reception tables and racks, Decorative theme based fascia with name of the stall holder,Dustbin etc. The scope shall also cover to provide mandatory proper general lighting using spot lights PAR lights/Metal/Halogen/CFL/LED lights, etc.), 2 nos. of plug (5/15 A) points and 20 A MCB points in each stall (As per direction of committee, in this regard the decision of engineer in charge will be final and binding). (If required) ( Stalls sizes as per requirement. )

1042

-

-

... More
Air Conditioned Inauguration cum Cultural Hanger Water Proof German Aluminium Hanger braced and tied German temporary hanger with minimum side height of 6M made of aluminium extrusions with base plate that are anchored to the ground and covered with SRF material that is fire retardant. The hangar structure should be able to withstand wind speed upto 100 KMPH. The Hanger will be completely weather proof and with adequate number of entry exit points including emergency exit with proper Aluminium and Glass Doors.Roof covered with good quality PVC Fabric cover (SRF), ceiling and Themetic creative branding side wall with Theme Based cloth Drapping is part of scope of work. Interior work as per the usage and purpose of room. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels . Providing 200 to 400 mm raised platform with 19 mm thick Plywood/block boards supported by wooden logs and covered with good quality of New synthetic carpet. The scope shall cover to provide general lighting, fans, AC . Necessary minimum 40 nos. electrical points (5/15A plug points), wall fan/ ceiling fan/ padestral fan/ exhaust fan as per requirement, General lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.) for inside dome and for preparation of fascade as per theme approved by Department as per Instruction is a part of scope of work. The entire area should be air conditioned and temperature should be maintained between 23 to 26 degree Celsius equally distributed. All materials have to be fire-retardant material and necessary documentation evidence/certificates are to be provided. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding). ( Hanger size 40m x 100m ) 1.Cloth Drapping and Barricading is part of scope of work. 2.Red carpet for entrance of VIPs and Delegates as per part of scope of work. Note : There will be a common connecting outer facade and rates for that will be quoted in respective item.

4000

-

-

... More
Performance Stage: Main stage to be made for suitable participants to perform for Inauguration function with multilayer from 5ft to 8ft height and remaining others days. Provision of tower A.C for VVIP's if require. Providing necessary floral and theme decoration, banners, New carpets on floors. If any modification alteration/addition on site is required same shall be made immediately without any extra charges to complete the job as directed by the Visualizer, Art Director and Department. Ensure structural soundness of entire structure. The stage should be certified by competent Structural Engineer and Approved from PWD Dept. There should be double level of plywood as per Department instruction. Creation of necessary ambience and black masking is a part of scope of work. Seating arrangement on stage should be done as per requirement of Department. Reshuffling of sitting arrangement with schedule and crowd of the event/program shall be arranged without any extra cost. Movement plan shall be provided. Seating arrangements, Ambience with Elevated platforms for photography, Media riser & console and other related activities shall be constructed using steel support system and should have proper leveling and steps for access. Preparing Steps/Stairs/Ramps with proper dimension for all different levels is part of scope of work. Masonry wall of about 30cm height with Plaster and paint finish shall be constructed around entire area of stage if required. All wiring on and around stage should be in FRLS (ISI mark) & in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. Staging on steel supports scaffolding is mandatory.The wooden stage/deck to carry 500 kg per Sq.Mt. load with Steel H frames, Adjustable props or cup lock scaffolding only with suitable steel supports and stepped floor with 19 mm thick Plywood sheets including two coats of Fire Retardant paint. The supporting steel scaffolding to be provided with base-plates and diagonal bracings in both directions. Ensure minimum size of 40NB dia pipe B class for any steel supports and 150*150mm the base plate 8/10mm thick for all supports. Ensure proper strengthening & stability of lightning trusses and other element kept for ambience as directed by Department. Aesthetic railing and a ramp shall be provided. Provision of console arrangement with cover over console platform and media platform on instruction of Department and Light, 5/15 amp plug points, fans, AC on stage as per the requirement of Department is also the part of scope of work. The colour synthetic New carpet to be laid on plywood with necessary flower arrangements as approved by Department. Providing Presentation Stage/Dias arrangements as per the requirements of Committee members with executive chairs, Wooden chairs, Tipoi, sofa, presentation desk, podium with branding, plasma TV with thematic theme based side wing. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding). Note : For LED Backdrop please refer respective item.

300

-

-

... More
2 seater Leather Sofa (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

70

-

-

... More
Glass Tipoi/Wooden Tipoi (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

25

-

-

... More
Cushioned chairs for Delegates with cover. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

2500

-

-

... More
Air Conditioned Green Rooms (Male & Female) : Pagoda structure (5m x 5m ) framing with roof covered with coloured waterproof and fireretardant fabric / good quality SRF material, ceiling with white fabrics, up to 200 mm raised wooden platform using 19mm thick Fire retardant plywood/ block board, necessary braced and tied octonorm cubicles covered from top, synthetic carpet, door curtains, storage racks, chairs, fans, stair, mirrors etc as per requirements of choreographer in all rooms/stalls. The proposed green rooms should be adjoining the stage side of the event dome. The scope shall cover proper internal lighting, fans, plug points. The green rooms shall be provided in a covered/tin barricading space with drinking water facility and adequate, good quality temporary two no. toilet blocks (one for male and one for female) with adequate drainage arrangement shall be provided and it should be made functional from before two days of event opening. The construction shall ensure proper privacy. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding). Note : There will be a common connecting outer facade and rates for that will be quoted in respective item.(if required)

7

-

-

... More
VIP and VVIP Lounge inside cultural dome with pantry made of 6mm ply partition with wall paper/carpet on wall etc with all high end furnishing inside the culture dome with required seating arragment and attach washrooms. (Washroom not to measured seperately) (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

130

-

-

... More
Stage Light (For all event days) : Main Stage Box truss Lighting including required Truss (Truss Specifications: Beam Section- 1010mm x 530mm, Main Tube - 60mm x 6mm/5mm , Tower Section- TD 44 / 530mm x 530mm Main Tube - 60mm x 6mm/5mm, (Truss Certification to be attached). *Note : Mast Tower section less than TD 44 / 530mm x 530mm shall not be accepted due to stability and strength issues.Need to do proper Black/white colour cloth masking to truss/scaffolding/tower is a part of scope of work also need to do PCC RCC foundation (If required) for strengthing purpose is a part of scope of work). As per instruction of Department (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)..

1

-

-

... More
Moving Head 300 to 460 watt (Spot, Wash & beam- 3 in 1)- Claypaky Mythos / Terbly-G12-Hybrid / Light SkY or equipvalent (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

30

-

-

... More
Moving Head beam-17R- Light Sky / Claypacky or equipvelent (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

20

-

-

... More
Strobe-3000 Watt- Martin-Atomic- 3000 / Claypaky Stormy / Silver Star or equpvalent (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

8

-

-

... More
LED Par light 54 x 3 Watt- IP 67 (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

200

-

-

... More
LED Wash Lights- Nick NRG / MX-INDIGO-6000XE/ Martin - Mac- Aura / Light Sky or equivalent (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

50

-

-

... More
Smoke Machines (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

4

-

-

... More
Silver Star Raytheon (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

35

-

-

... More
Haze Machines (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

6

-

-

... More
Follow Spot (2.5 KW) (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

3

-

-

... More
Moving Head (Sharpy)- Platinum 5R- Claypaky / Elation / Terbly / PR / Light Sky or equivalent (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

15

-

-

... More
Leko Source Four- 25 degree (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

20

-

-

... More
Gobo Projection Light with Event Logo, client logo or other as per the instruction given by department (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Laser Lights: Main purpose for the laser light is to create themes as directed by PWD, during the Main event. Green 15 W- 2 nos. Multicolor 15W- 1 nos (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
LB4- 4 x 40 Watt each (LED) RGBW / Moving Head Wash Nick NRG / MX-INDIGO-6000XE/ Martin - Mac- Aura / Light Sky or equpvalent (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

80

-

-

... More
LED Matrix- Block of 5 x 5 = 25 LED 10 Watt Each- Warm White/RGB, Beam angle- 6 degrees or equpvalent (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

80

-

-

... More
Sound System (For all event days) : Front Of House sound system shall consist of 6(Six) pairs full size line array tops, acompanied by subs as prescribed by manufacturer. L-Acoustics, MEYER SOUND LEO/ LYON, D.A.S. AERO 50 , NEXO STM M46 main module and STM bass module, JBL or equpvalent, accompained by subs as prescribed by manufacturer. 90000 watts/130db SPL approx. Front Of House 06 pairs (12 nos.) flying rigs. The agency shall have to provide stage gears for Bass, guitar, key board amp, and related equipments as per need. Need to do proper Black/white colour cloth masking to truss/scaffolding/tower is a part of scope of work also need to do PCC RCC foundation for strengthing purpose is a part of scope of work. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Delay Stacks shall consist of four Pair Flying Line Array accompanied by prescribed no of Sub’s Approx. 36000 Watts. The same will be used elsewhere as per requirement and instruction of department (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

2

-

-

... More
Digital Mixing Console -Soundcraft/ Avid S6L 32D / DiGiCo SD7 / YAMAHA/DiGiCo SD equpvalent (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

2

-

-

... More
Monitors for theatrical production shall be flown on the truss & not placed on the Stage therefore should be capable of flying. Wedges for Live performances could be Martin, JBL, NEXO, MEYER SOUND, D.A.S. Low Profile monitors or equivalent (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

10

-

-

... More
Front of House Equalization must employed the digital equalization system from XTA , GALAXY, Klark teknik. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Cordless Microphones SENNHEISER 5200 or SHURE UHF -R / ULX -D or equpvalent recommended. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

8

-

-

... More
For Sound Management from XTA DP 448 / DP 548 or lake Audio LM Processors. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
CD Players/DV player/Pendrive/Bluetooth/USB/Hard Disk (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

2

-

-

... More
Corded microphones (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

40

-

-

... More
Podium microphones (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

2

-

-

... More
Setup arrangement for live concerts Backline support,Tech Rider and Technical requirement for each night as per artisits/performer/PWD/PMC to be considered seperately apart from the above requirement. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Video Projection System (For all event days) :LED indoor Screen (For Main Stage) (48X12 ft LED or size as per final approved desing) : LED screen of P2/P3/P4.8 mm pitch (As per the requirment) & 4k controller , with approx. Screen size total 600 Sq.ft. To be erected, on main stage (rear edge), configured to run with WATCHOUT system & Resolume Arena Systems (but w/o Watch out). The rate should be including Truss and back drop with masking arrangement as per instruction of Department. Need to do proper Black/white colour cloth masking to truss/scaffolding/tower is a part of scope of work also need to do PCC RCC foundation for strengthing purpose is a part of scope of work if required. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
LED indoor screen (For General Audience): LED screen of P2/P3/P4.8 mm pitch (As per the requirment) of 16X12/16X14/ 8x 12 ft c/w long distribution cabling. The rate should be including Truss / Wooden Raiser with masking arrangement as per instruction of department. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

8

-

-

... More
Watchout Server & Resolume Arena Systems :- Supply, installations, of watch out server as per requirement for the entire event period. Note: The Content/Theme developing part will be suggested/decided by chreographer as per requirement. Charges for content developing and theme will be paid seperately. Only technical aspects regarding server will be provided by contractor. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Plasma T.V. (50/52/55 inches) including mounting stand and cabling etc. to be placed at various location including VVIP, CM, Admin, Media, etc. lounge for live setup. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

5

-

-

... More
Camera setup to shoot show live. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

10

-

-

... More
Jimmy Jib Camera Set Up on motorised crane 30 ft to 40 ft. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Full HD/SDI 1080i Video Console Setup with Required Cabaling : High Definition Technology to be used & Recorded with HD Recorder on HARD DISK with four cameras online and 2 camera mobile. Switchers and arrangement for the OB VAN outputs including cabling & isolation transformer & proper earthing etc. as per requirement, a monitor to be placed for viewing for all event days. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Full HD 1080i Video Mixer with SDI & HDMI Input and Output - Black Magic / data video (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

2

-

-

... More
Full HD 1080i Video Recorder with SDI & HDMI Input - Black Magic / data video / panasonic (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

2

-

-

... More
Monitor (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

5

-

-

... More
Air Conditioned VVIP Dinning Hanger German Aluminium Hanger with minimum side height of 4M made of aluminium extrusions with base plate that are anchored to the ground and covered with SRF material that is fire retardant. The hangar structure should be able to withstand wind speed upto 100 KMPH. The Hangar will be completely weather proof and with adequate number of entry exit points including emergency exit with proper Aluminium and Glass Doors.Roof covered with good quality PVC Fabric cover (SRF), ceiling and Themetic creative branding side wall with Theme Based cloth Drapping wall are part of scope Interior work as per the usage and purpose of room. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels with arrangements . Providing 200 to 400 mm raised platform with 19 mm thick Plywood/block boards supFront facade with minimum 6 mm ply fixed on wooden/steel frame work and painting etc. complete. The scope shall cover to provide general lighting, fans, AC . Necessary electrical points (5/15A plug points), 3 phase power connection, wall fan/ ceiling fan/ padestral fan/ exhaust fan as per requirement, General lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.) for inside dome and for preparation of fascade as per theme approved by Department as per Instruction is a part of scope of work. The entire area should be air conditioned and temperature should be maintained between 23 to 26 degree Celsius equally distributed. All materials have to be fire-retardant material and necessary documentation evidence/certificates are to be provided. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. The structure should be ready before five days. Mode of Measurement: - Built up area (Out to Out dimensions of walls) in plan shall be measured of structure. Outside porch and external passage shall not be measured. Other electrical equipments and material likegeneral lighting (using Tubelights/PAR lights /Metal /Halogen/CFL/LED lights, etc.)(5/15 A plug points) etc), fans, AC, ELCB, MCB, wiring etc and related electrical items shall not be measured seperately. (Hanger size 30m x 55m) including wooden table for counter as per part of scope of work. *LIGHTING (LIGHT ROBOTS/ INTELIGENT LIGHTS) SYSTEM REQUIRMENT FOR DINNING PRESENTATION : Supply and installation of required Lighting for dinning hanger inside side wall each having Spot QWO 800/Mythos or similar- 20 nos. , LED Wash-20 nos, Profile 2kW-4 nos, compact highly efficient Fresnel lens spotlight-12 nos and molfey audiance light with GE 650w Lamps 8 nos along with required Consol Light + Playback Wing, Accessories , Light Dimmer, Wiring Kit , Black Kit trussing H30v, Lift light, Distribution complete in all respect as per the site requirement. The scope of work also includes providing and executing lights using PAR lights with diffusures/LED PAR lights using DMX controllers complete as per the site requirment. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding). Note : There will be a common connecting outer facade and rates for that will be quoted in respective item.

1650

-

-

... More
Good quality round Table set up (Minium 5 ft dia with maximum 5 person seating) with Covers/ Cloths for tables/ chairs shall be changed on daily basis and as per instruction given by concern department as per part of scope of work. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

40

-

-

... More
Temporary Kitchen with store and satelite kitchen with wash area arragment as per requirment :P/E braced and tied steel Structural framing with roof covered with coloured waterproof and fire retardant fabric / good quality SRF PVC material, ceiling with white fabrics with 150mm to 300 mm raised wooden platform using 19mm thick plywood/ block board with fire paint. Provision of Kitchen (Min. 100 Sq.Mt.) using G.I. sheets panels as per the requirements with proper paved flooring, lockable store room, door curtains, storage racks, etc. Providing Porch with carpet and wooden platfrom, Stairs, ramps, railing and other related is part of scope of work. The scope shall cover proper internal lighting (tube lights, metal, par, halogen, LED, fans and minimum 5 nos. of (5/15 A) plug points, etc.) as per requirement. The structure shall be provided in a covered/tin barricading space with drinking water facility and adequate wash area Min. 30 Sq.Mt. with adequate water taps Min. 15 no’s with proper drainage system and soak pit etc. complete. The structure should be made functional from before 3 days .The construction shall ensure proper privacy. scope also included wash area inside/outsode as per department instruction with sufficent water arragment. All wiring should be IS mark in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. Mode of measurement: In to In dimensions in plan shall be measured of structure. Outside porch and external passage shall not be measured. (Note: This item should be executed only after instruction of department.) Other electrical equipments and material like general lighting (tube lights, par lights, metal, haleogen, fans and (5/15 A) plug points, ELCB, MCB, point wiring, etc ) and related electrical items shall not be measure separately. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

500

-

-

... More
Air Conditioned Delegate Dinning Hanger German Aluminium hanger with minimum side height of 4M made of aluminium extrusions with base plate that are anchored to the ground and covered with SRF material that is fire retardant. The hangar structure should be able to withstand wind speed upto 100 KMPH. The Hangar will be completely weather proof and with adequate number of entry exit points including emergency exit with proper Aluminium and Glass Doors.Roof covered with good quality PVC Fabric cover (SRF), cceiling and Themetic creative branding side wall with Theme Based cloth Drapping part of the scope . Interior work as per the usage and purpose of room. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels with arrangements . Providing 200 to 400 mm raised platform with 19 mm thick Plywood/block boards supported by wooden logs and covered with good quality of New synthetic carpet. Front facade with minimum 6 mm ply fixed on wooden/steel frame work and painting etc. complete. The scope shall cover to provide general lighting, fans, AC, CCTV Cameras . Necessary electrical points (5/15A plug points), 3 phase power connection, wall fan/ ceiling fan/ padestral fan/ exhaust fan as per requirement, General lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.) for inside dome and for preparation of fascade as per theme approved by Department as per Instruction is a part of scope of work. The entire area should be air conditioned and temperature should be maintained between 23 to 26 degree Celsius equally distributed. All materials have to be fire-retardant material and necessary documentation evidence/certificates are to be provided. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. The structure should be ready before five days. Mode of Measurement: - Built up area (Out to Out dimensions of walls) in plan shall be measured of structure. Outside porch and external passage shall not be measured. Other electrical equipments and material likegeneral lighting (using Tubelights/PAR lights /Metal/Halogen/CFL/LED lights, etc.)(5/15 A plug points) etc), fans, AC, ELCB, MCB, wiring etc and related electrical items shall not be measured seperately. (Hanger Size 25 x 40m) including wooden table as per part of scope of work. *LIGHTING (LIGHT ROBOTS/ INTELIGENT LIGHTS) SYSTEM REQUIRMENT FOR DINNING PRESENTATION : Supply and installation of required Lighting for dinning hanger inside side wall each having Spot QWO 800/Mythos or similar- 20 nos. , LED Wash-20 nos, Profile 2kW-4 nos, compact highly efficient Fresnel lens spotlight-12 nos and molfey audiance light with GE 650w Lamps 8 nos along with required Consol Light + Playback Wing, Accessories , Light Dimmer, Wiring Kit , Black Kit trussing H30v, Lift light, Distribution complete in all respect as per the site requirement. The scope of work also includes providing and executing lights using PAR lights with diffusures/LED PAR lights using DMX controllers complete as per the site requirment.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding). Note : There will be a common connecting outer facade and rates for that will be quoted in respective item.

1000

-

-

... More
The dining space to be developed based on area available at the Dinning Hanger. Good/executive quality of Interior works as per the usage and purpose of event is to be executed with proper Ambience. Necessary furnishing to be done appropriately as approved by the Department. Erection of necessary arrangements/furniture to accommodate around 1000 nos rotating delegates of people with defined area of services/counters equipped with necessary furniture like buffet counters, tables, cusioned chairs, dining counters, tower fans, scope included minimum 20 nos. standing/bristo table, etc. for lunch/dinner. Covers/ Cloths for tables/ chairs shall be changed on daily basis and if and when required. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Air Conditioned Exhibitor Dinning Hanger German Aluminium hanger with connecting passage between two dining hangers with minimum side height of 4M made of aluminium extrusions with base plate that are anchored to the ground and covered with SRF material that is fire retardant. The hanger structure should be able to withstand wind speed upto 100 KMPH. The Hangar will be completely weather proof and with adequate number of entry exit points including emergency exit with proper Aluminium and Glass Doors.Roof covered with good quality PVC Fabric cover (SRF), ceiling and Themetic creative branding side wall with Theme Based cloth Drapping. Interior work as per the usage and purpose of room. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels with arrangements . Providing 200 to 400 mm raised platform with 19 mm thick Plywood/block boards supported by wooden logs and covered with good quality of New synthetic carpet. Front facade with minimum 6 mm ply fixed on wooden/steel frame work and painting etc. complete. The scope shall cover to provide general lighting, fans, AC, CCTV Cameras . Necessary electrical points (5/15A plug points), 3 phase power connection, wall fan/ ceiling fan/ padestral fan/ exhaust fan as per requirement, General lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.) for inside dome and for preparation of fascade as per theme approved by Department as per Instruction is a part of scope of work. The entire area should be air conditioned and temperature should be maintained between 23 to 26 degree Celsius equally distributed. All materials have to be fire-retardant material and necessary documentation evidence/certificates are to be provided. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. The structure should be ready before five days. Mode of Measurement: - Built up area (Out to Out dimensions of walls) in plan shall be measured of structure. Outside porch and external passage shall not be measured. Other electrical equipments and material likegeneral lighting (using Tubelights/PAR lights /Metal /Halogen/CFL/LED lights, etc.)(5/15 A plug points) etc), fans, AC, ELCB, MCB, wiring etc and related electrical items shall not be measured seperately. (Hanger Size 25m x 40m) including wooden table as per part of scope of work. *LIGHTING (LIGHT ROBOTS/ INTELIGENT LIGHTS) SYSTEM REQUIRMENT FOR DINNING PRESENTATION : Supply and installation of required Lighting for dinning hanger inside side wall each having Spot QWO 800/Mythos or similar- 20 nos. , LED Wash-20 nos, Profile 2kW-4 nos, compact highly efficient Fresnel lens spotlight-12 nos and molfey audiance light with GE 650w Lamps 8 nos along with required Consol Light + Playback Wing, Accessories , Light Dimmer, Wiring Kit , Black Kit trussing H30v, Lift light, Distribution complete in all respect as per the site requirement. The scope of work also includes providing and executing lights using PAR lights with diffusures/LED PAR lights using DMX controllers complete as per the site requirment. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding). Mode of measurement: Actual carpet area shall be measured. Seating arrangements shall be recorded only as per requirement. Concept design shall be presented in the Concept Presentation. Note : There will be a common connecting outer facade and rates for that will be quoted in respective item.

1000

-

-

... More
The dining space to be developed based on area available at the Dinning Hanger. Good/executive quality of Interior works as per the usage and purpose of event is to be executed with proper Ambience. Necessary furnishing to be done appropriately as approved by the Department. Erection of necessary arrangements/furniture to accommodate around 1000 nos rotating delegates of people with defined area of services/counters equipped with necessary furniture like buffet counters, tables, cusioned chairs, dining counters, tower fans, scope included minimum 20 nos. standing/bristo table, etc. for lunch/dinner. Covers/ Cloths for tables/ chairs shall be changed on daily basis and if and when required.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Air Conditioned Technical Sessions Hanger 1 ( 700 Paxs) P/E braced and tied German temporary Aluminium hanger with minimum side height of 4M made of aluminium extrusions with base plate that are anchored to the ground and covered with SRF material that is fire retardant. The hangar structure should be able to withstand wind speed upto 100 KMPH. The Hangar will be completely weather proof and with adequate number of entry exit points including emergency exit with proper Aluminium and Glass Doors.Roof covered with Theme Based cloth Drapping. Interior work as per the usage and purpose of room. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels with arrangements for doors, glass windows for conference room and reception area with waiting lounge and providing necessary tables, sofa, chairs, dustbins, theme, pantry and drinking water facilities, providing Porch with carpet and wooden platfrom, Stairs, ramps, railing and work station for telephone and fax line is a part of scope of work. Providing150 to 300 mm raised platform with 19 mm thick Plywood/block boards supported by wooden logs and covered with good quality of New synthetic carpet. Front facade with minimum 6 mm ply fixed on wooden/steel frame work and painting etc. complete. The scope shall cover to provide general lighting, fans, AC. Necessary minimum 40 nos. electrical points (5/15A plug points), wall fan/ ceiling fan/ padestral fan/ exhaust fan as per requirement, General lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.) for inside dome and for preparation of fascade as per theme approved by Department as per Instruction is a part of scope of work. The entire area should be air conditioned and temperature should be maintained between 23 to 26 degree Celsius equally distributed. All materials have to be fire-retardant material and necessary documentation evidence/certificates are to be provided. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. The structure should be ready before five days. Mode of Measurement: - Built up area (Out to Out dimensions of walls) in plan shall be measured of structure. Outside porch and external passage shall not be measured. Other electrical equipments and material likegeneral lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.)(5/15 A plug points) etc), fans, AC, ELCB, MCB, wiring etc and related electrical items shall not be measured seperately. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding). (Hanger Size 25m x 35m) Note : There will be a common connecting outer facade and rates for that will be quoted in respective item.

875

-

-

... More
Main stage 16ft X32 ft and (size may vary as per instruction given by client are included scope of work) to be constructed using prefabricated H Frame supports in 2'' M.S. pipe having hight up to 2 to 4 feet with cross members fixed properly for stability. The top has to be covered with 19mm Block Board or plywood in proper level and fire paint with podium, back drop, theme decoration, good quality carpet, Dias arrangement with all necessary facilities like executive chairs, wooden chair,plazama tv, cushion chairs for delegates.Including stage Backdrop, Dias arrangement and four side of stage covered with Branding as directed by Department.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
700 paxs seating as per clients requirements in cushion chairs/ conference chairs (as instructed by client) shall be provided in each hall.Re-shuffling of the sitting arrangement with respect to schedule and contents of event/ programme shall be arranged without any extra cost. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
AUDIO VIDEO REQUIREMENT: Supply and installation of high quality suitable AV System equipment like projector screen, LED screen, amplifier, mixture, Stage monitor, line array, high end speakers, subs, base, with truss structures having scanners, PAR/Moving Heads/Sharpy/FocusLights/ lights and other required fixtures including cabling/ wiring. High quality of corded/cord less/collar microphone/ Gooseck Mic,/Podium Mics/Lapel Mics with accessories and cables etc. as per the site requirement. The sound be able to connect/sink/integration with video conferencing/screening/ distribution and back up recording as per requirement for hall.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
LED SCREENS: Supply and installation of (10ftX8 ft/6 X 8 ft) 4 nos and Projector ( As per site requirements)– P2/P3.7mm indoor type LED Screen with truss hanging arrangement. Including of all cabling/transmitter/receiver switcher/cameras etc. and arrangement of live shoot and recording as per site requirement. The job also includes co-ordination with sound system and OB Van broadcasting for the total event. 60 inches Plasma TV with SS stands – 4 nos. is required to install as per the site requirement. Supply and installation of 4 sets of Laptop (latest version) with USB storage devices & laser pointer which can be used for presentation purpose.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Air Conditioned Technical Sessions Hanger 2 ( 300 Paxs) P/E braced and tied German temporary hanger (aluminium hangar) with minimum side height of 4M made of aluminium extrusions with base plate that are anchored to the ground and covered with SRF material that is fire retardant. The hangar structure should be able to withstand wind speed upto 100 KMPH. The Hangar will be completely weather proof and with adequate number of entry exit points including emergency exit with outer face covered with approved facade Design, Roof covered with Theme Based cloth Drapping and inside side wall theme based creation. Interior work side wall and purpose of room. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels with arrangements for doors, glass windows fo r conference room and reception area with waiting lounge and providing necessary tables, sofa, chairs, dustbins, theme, pantry and drinking water facilities, providing Porch with carpet and wooden platfrom, Stairs, ramps, railing and work station for telephone and fax line is a part of scope of work. Providing150 to 300 mm raised platform with 19 mm thick Plywood/block boards supported by wooden logs and covered with good quality of New synthetic carpet. Front facade with minimum 6 mm ply fixed on wooden/steel frame work and painting etc. complete. The scope shall cover to provide general lighting, fans, AC, CCTV Cameras . Necessary minimum 50 nos. electrical points (5/15A plug points), wall fan/ ceiling fan/ padestral fan/ exhaust fan as per requirement, General lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.) for inside dome and for preparation of fascade as per theme approved by Department as per Instruction is a part of scope of work. The entire area should be air conditioned and temperature should be maintained between 23 to 26 degree Celsius equally distributed. All materials have to be fire-retardant material and necessary documentation evidence/certificates are to be provided. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. The structure should be ready before five days. Mode of Measurement: - Built up area (Out to Out dimensions of walls) in plan shall be measured of structure. Outside porch and external passage shall not be measured. Other electrical equipments and material likegeneral lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.)(5/15 A plug points) etc), fans, AC, ELCB, MCB, wiring etc and related electrical items shall not be measured seperately. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding). (15m x 25m). Note : There will be a common connecting outer facade and rates for that will be quoted in respective item.

375

-

-

... More
Main stage to be constructed using prefabricated H Frame supports in 2' M.S. pipe having hight up to 4 to 6 feet with cross members fixed properly for stability. The top has to be covered with 19mm Block Board or plywood in proper level and fire paint with podium, back drop, theme decoration, good quality carpet, Dias arrangement with all necessary facilities like executive chairs, wooden chair,plazama tv, cushion chairs for delegates.Including stage Backdrop, Dias arrangement and four side of stage covered with Branding as directed by Department. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
300 pax seating as per clients requirements in sofa sets & others seating in cushion chairs/ conference chairs (as instructed by client) shall be provided in each hall. Provision of Round tables with seating arrangement in Seminar hall shall be provided as per requirements of event for conducting B2B/ B2G meetings, cluster to be developed as per requirements of client. Re-shuffling of the sitting arrangement with respect to schedule and contents of event/ programme shall be arranged without any extra cost. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
AUDIO VIDEO REQUIREMENT: Supply and installation of high quality suitable AV System equipment like projector, screen, amplifier, mixture, Stage monitor, line array, high end speakers, subs, base, with truss structures having scanners, PAR/Moving Heads/Sharpy/FocusLights/ lights and other required fixtures including cabling/ wiring. High quality of corded/cord less/collar microphone/ Gooseck Mic,/Podium Mics/Lapel Mics with accessories and cables etc. as per the site requirement. The sound be able to connect/sink/integration with video conferencing/screening/ distribution and back up recording as per requirement for each hall. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
LED SCREENS: Supply and installation of (10ftX8 ft/6 X 8 ft) 2 nos and Projector ( As per site requirements)– P2/P3.7mm indoor type LED Screen with truss hanging arrangement. Including of all cabling/transmitter/receiver switcher/cameras etc. and arrangement of live shoot and recording as per site requirement. The job also includes co-ordination with sound system and OB Van broadcasting for the total event. 60 inches Plasma TV with SS stands – 4 nos. is required to install as per the site requirement. Supply and installation of 4 sets of Laptop (latest version) with USB storage devices & laser pointer which can be used for presentation purpose. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Air Conditioned Technical Sessions Hanger 3 (150 Paxs) P/E braced and tied German temporary Aluminium hanger with minimum side height of 4M made of aluminium extrusions with base plate that are anchored to the ground and covered with SRF material that is fire retardant. The hangar structure should be able to withstand wind speed upto 100 KMPH. The Hangar will be completely weather proof and with adequate number of entry exit points including emergency exit with proper Aluminium and Glass Doors.Roof covered with Theme Based cloth Drapping. Interior work as per the usage and purpose of room. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels with arrangements for doors, glass windows for conference room and reception area with waiting lounge and providing necessary tables, sofa, chairs, dustbins, theme, pantry and drinking water facilities, providing Porch with carpet and wooden platfrom, Stairs, ramps, railing and work station for telephone and fax line is a part of scope of work. Providing150 to 300 mm raised platform with 19 mm thick Plywood/block boards supported by wooden logs and covered with good quality of New synthetic carpet. Front facade with minimum 6 mm ply fixed on wooden/steel frame work and painting etc. complete. The scope shall cover to provide general lighting, fans, AC, CCTV Cameras . Necessary minimum 40 nos. electrical points (5/15A plug points), wall fan/ ceiling fan/ padestral fan/ exhaust fan as per requirement, General lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.) for inside dome and for preparation of fascade as per theme approved by Department as per Instruction is a part of scope of work. The entire area should be air conditioned and temperature should be maintained between 23 to 26 degree Celsius equally distributed. All materials have to be fire-retardant material and necessary documentation evidence/certificates are to be provided. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. The structure should be ready before five days. Mode of Measurement: - Built up area (Out to Out dimensions of walls) in plan shall be measured of structure. Outside porch and external passage shall not be measured. Other electrical equipments and material likegeneral lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.)(5/15 A plug points) etc), fans, AC, ELCB, MCB, wiring etc and related electrical items shall not be measured seperately. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding). (Hanger Size 15m x 25m). Note : There will be a common connecting outer facade and rates for that will be quoted in respective item.

375

-

-

... More
P/E braced Oval/U shaped seatting arragment with require table & chairs approx 30 to 40 nos (final qty. Given by department) and 150 nos for other seating arragment. Cushioned chairs with theme base cover on table & chairs, colour approved by the department (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Sound System for Technical Sessions Hanger 3: Hire charges for providing, erecting, testing and commissioning of sound system having minimum 90dB SPL for Technical Sessions including power amplifier, processor, mixer, various type of microphones and speakers etc. & all related hardware and software as per site requirement.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Providing required DCN Audio Conferencing entire sets with Camara traking set up (2 Nos.) - DCN Conference Solutions should offer versatility, high audio quality and data transmission while providing complete control over conference proceedings. IR based Wireless disussion units will be preffered - DCN-DISR rims for Discussion Units, Buttons Chairman Unit, control units, amplifiers, Traking Camera, Speakers and Microphones Control Units etc. As per site requirments to various halls. Nos of delegate Units & chairman units as per the sizes of the rooms and numbers of the DCN sets - up to 30 Nos. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

1

-

-

... More
Air Conditioned Administration Lounge : P/E braced and tied German aluminium temporary hangr with minimum side height of 4M made of aluminium extrusions with base plate that are anchored to the ground. The hangar structure should be able to withstand wind speed upto 100 KMPH.The Hangar will be completely weather proof and with adequate number of entry exit points including emergency exit with proper Aluminium and Glass Doors.Roof covered with waterproof and fire retardant fabric / good quality PVC Fabric cover (SRF), ceiling with Theme based fabrics. Interior work as per the usage and purpose of room. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels with arrangements for doors, glass windows for conference room and reception area with waiting lounge and providing necessary tables, sofa, chairs, dustbins, theme, pantry and drinking water facilities, providing Porch with carpet and wooden platfrom, Stairs, ramps, railing and work station for telephone and fax line is a part of scope of work. Providing150 to 300 mm raised platform with 19 mm thick Fire retardant Plywood/block boards supported by wooden logs and covered with good quality of synthetic carpet. Front facade with minimum 6 mm ply fixed on wooden/steel frame work and painting etc. complete. The scope shall cover to provide general lighting, fans, AC, CCTV Cameras having control in Administartion Office. Necessary electrical points (5/15A plug points), wall fan/ ceiling fan/ padestral fan/ exhaust fan as per requirement, General lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.) for inside dome and for preparation of fascade as per theme approved by Department as per Instruction is a part of scope of work. The lights should be enough upto the satisfaction of Department and if required extra lighting shall be done without any extra cost. The entire area should be air conditioned and temperature should be maintained between 23 to 26 degree Celsius equally distributed. Agency need to Internal and external sides cover with using theme decorative flex with frame of ht. up to 10ft minimum as per requirment is a part of scope of work. All materials have to be fire-retardant material and necessary documentation evidence/certificates are to be provided. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. The structure should be ready before five days. Mode of Measurement: - Built up area (Out to Out dimensions of walls) in plan shall be measured of structure. Outside porch and external passage shall not be measured. Other electrical equipments and material like general lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.)(5/15 A plug points) etc), fans, AC, ELCB, MCB, wiring etc and related electrical items shall not be measured seperately. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding). (Hanger Size 10m x 30m). Note : There will be a common connecting outer facade and rates for that will be quoted in respective item.(if required)

300

-

-

... More
Office Setup inside the administraction : Wooden finish Octonorm Partition providing office and pantry with require set up of cushioned chairs, tipoi, laminated table and racks, Decorative theme based fascia with name of the offices , plants, Dustbin etc. The scope shall also cover to provide mandatory proper general lighting(using Tubelights/PAR lights/ Metal/ Halogen/ CFL/ LED lights, etc.) plug (5/15 A) points and 20 A MCB points in each office (If require), scope also making waiting area, scope included attach toilet washroom for 3 Nos of office.( Size 3m x 3m ,size may vary as per the requirement.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

10

-

-

... More
Temporary Toilet blocks P/C Toilet blocks (Gents & Ladies) for delegates as indicated in conceptual layout. All toilets shall have a full time attendant/ cleaner for operation & maintenance works. Providing and constructing toilet block in PVC flooring on walls and flooring and water tank as per requirement as directed by engineer in charge. Providing roof covered with waterproof and fire retardant fabric / good quality SRF PVC material /Meta colour/CRIL/ or equivalent sheet. Providing doors to be made of MS/Aluminum section pipe framing with laminated ply panels duly painted or FRP doors with suitable framing. A. Gents (facilities per one block) Urinals - 6 nos. W.C. with Anglo Indian pan - 2 nos. EWC - 3 nos. Washbasin - 2 nos. Linen -1, Mirror – 5. B. Ladies (facilities per one block) W.C. with Anglo Indian pan - 3 nos. EWC - 5 nos. Washbasin - 2 nos. Linen - 1, Mirror –5 etc. complete. Ensure suitable hardware. The scope shall cover to provide proper lighting (using Tubelights/ Metal/ Halogen/ CFL/ LED lights, etc.) and ventilation system, 4 Nos of (5/15 A) plug points, Water pump, exhaust fan and proper barricading/partition wall to maintain the privacy between Gent's & Ladies. Providing soak pit with adequate capacity including proper top cover. Ensure proper housekeeping. All toilets shall be functional before two days. Toilet block near Green Rooms should be operational before Five days. All necessary arrangements/maintenance for water supply, drainage and housekeeping of all Toilets for entire day is part of scope of works. Ensure minimum 2 attendants in each toilet block.The PWD decision to accept the quality of work and if required changing type of Toilet shall be final and bonding. ) Other electrical equipments and material like  proper lighting (using Tubelights/Metal/Halogen/CFL/LED lights, etc.), 4 Nos of (5/15 A) plug points, Water pump, exhaust fan, etc. in each toilet block and related electrical items shall not be measured seperately. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding).

2500

-

-

... More
Air Conditioned First Aid counter/ Medical lounges:- Arranging Medical Lounge/ First aid counter. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels with arrangements for doors if required. scope included making two three bed facility. Providing necessary cushioned chairs, Tables, Racks and storage facilities. Proper internal lighting and fans to be provided. The scope of work also includes required electrical work like 5/6 Amp & 15/16Amp. power points, 1 or 3 phase power controlled with required capacity of MCB/ELCB for the any loads, LED lights, Spot Lights, Tower type fans & any other type of light fixture as per the site requirment with rated current capacity of Copper FRLS wires ISI make flexible wires in PVC rigid conduits & Heavy duty cables of ISI/FRLS alluminium including MCB/ELCB lighting/power distribution boards (LDB/PDB) etc. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

25

-

-

... More
HelpDesck/Water counter/Security structures inside 3m X 3m Pagoda : P/E Pagoda structure near all entries/ as per client requirements with top covered waterproof SRF materials. Each structure having area of 3m X3 m with 150 mm raised wooden flooring using 19mm thick Fire Retardant Plywood, new synthetic carpet, Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels if required . Providing necessary furniture like Tables and Cushioned Chairs. Proper internal lighting, fans, external lights are to be provided. The structures are to be provided after getting the approvals from appropriate departments. structures shall be ready/usable before 3 days of the event. Mode of measurement: Mode of measurement shall be unit no. based. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

10

-

-

... More
Hi-Tea inside 5m X 5m Pagoda: P/E Pagoda structure near all entries/ as per client requirements with top covered waterproof SRF materials. Each structure having area of 5m X 5m with 150 mm raised wooden flooring using 19mm thick Fire Retardant Plywood, new synthetic carpet, Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels if required . Providing necessary furniture like Tables and Cushioned Chairs. Proper internal lighting, fans, external lights are to be provided. The structures are to be provided after getting the approvals from appropriate departments. structures shall be ready/usable before 3 days of the event. Mode of measurement: Mode of measurement shall be unit no. based. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

2

-

-

... More
Departmental Stalls 5m X 5m Pagoda: P/E Pagoda structure near all entries/ as per client requirements with top covered waterproof SRF materials. Each structure having area of 5m X 5m with 150 mm raised wooden flooring using 19mm thick Fire Retardant Plywood, new synthetic carpet, Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels if required . Providing necessary furniture like Tables and Cushioned Chairs. Proper internal lighting, fans, external lights are to be provided. The structures are to be provided after getting the approvals from appropriate departments. structures shall be ready/usable before 3 days of the event. Mode of measurement: Mode of measurement shall be unit no. based. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

6

-

-

... More
VIP/VVIP and Delegate Entry- Theme -as per theme approved by Department:- The VIP & VVIP entry to the venue for approved locations with suitable Theme/design/creativity. The locations shall have to be finalized as per the Department/PWD as indicated in conceptual layout requirements. There will be separate entry for VIP and VVIPs. Steel or wooden braced and tied structure with outer face covered with plywood. The entry should be decorative depicting Event Theme and having proper decorative lighting. Suitable provisional arrangements should be made to place metal detector doors at all gates. Providing Plants and display. Spot lights,series/Rope light covering boundary wall, Decorative lights as well as area lighting should be provided. Front Facades and sides are to be made as per approved theme. Necessary landscaping shall be part of scope. Final elevation shall be approved by PWD/Committee. All Gates shall be supported on R.C.C. foundations with required size bolts embedded to be designed by a competent structural designer or as approved by the Professional advisor. Structural stability shall be certified by qualified Structural Engineer. Ensure proper anchoring of entry gate with ground by suitable method as approved by Professional Advisor/Structural Engineer. Considering all design /seasonal factors. Ensure minimum width of 5.00 mts and height of 4.25 mts for the clear opening within gate or more is part of scope of work. If more gap required for general entry gate, Breaking of existing wall and restoring of same after event is a part of scope of work. No extra payment shall be made for Breaking and restoring of wall. The structure should be ready before three days. Mode of measurement: Mode of measurement shall be unit no. based. Other electrical equipments and material like general lighting (tube lights, par lights, metal, haleogen, spot light, etc), ELCB, MCB, wiring etc and related electrical items shall be measure separately in their respective item. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

3

-

-

... More
Welcome Arches depicting Event Theme: Welcome arches of approved decorative theme are to be placed at approved locations in city covering both the lanes of the road i.e. on both sides and as approved by PWD /Committee. The locations shall be finalized as per the approved layout/ PWD requirements. The height of welcome arches shall be minimum 4 to 5 Mt. Provide display banners on star flex and write up on main length in Retro radium vinyl with base on star flex. Providing MS steel structure with 10 to 12 mm plywood wherever required with necessary framings and bracing. All welcome arches shall be supported on R.C.C. foundations with required size bolts embedded to be designed by a competent structural designer or as approved by the Professional advisor. All Welcome Arches shall be ready by before 4 dyas. Structural engineer certificate shall be submitted immediately after installations. Necessary speed breakers shall be provided for Welcome Arches. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

2

-

-

... More
Providing ,Designing ,development & Erecting of Hoardings of required size and same shall be erected at various locations using stable structural steel frame structure suitably tied and braced with ground using frontlits /starflex/ Retro vinyl radium. Ensure structural stability with all factors. Provision of suitable foundations in civil work. Mode of measurement: Mode of measurement shall be Sq.Mt. based. (a) frontlits /starflex/ Retro vinyl radium. It shall be completed before 7 days or as per clients time line. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

200

-

-

... More
Welcome Branding Signages/Hoarding, Route Maps/Layout, Direction signages, Backdrop, Wall branding and other related works at various location surounding area as per PWD instructions: P/F Branding/Signages using Flex with M.S fream for activities using various types of Branding as below: - Welcome Branding signages/Hoarding, - Directional signages, - Informational, Standee, Branding, - Wall branding, - Backdrop, - Slogans, - Route/Location maps, - Govt. schemes signages, and other types of branding & signage on roads at various locations as per requirement of Authority/Dept.. The size varies as par finailized by Authority/Dept.. Mode of measurement: To be considered based on attached layout and design presented by bidder before the committee members. The measurement shall be as per actual sizes of various work done, which shall be converted into total sq.mts of work. The branding shall be provided by way of proper anchoring/foundation, steel framing , bracing etc as to ensure structural stability. The made of Star 4 Pass 350 GSM Black back, 3M vinylflex, painted ply cut outs, pasting on foam sheet as per creative designs which includes logo as directed by Authority/Dept., font size in Hindi/English language or other language as directed by Authority/Dept. is a part of scope of work. The Pasting on foam sheet is a part of scope of work. The signages made of vinyl flex, painted ply cutouts, vinyls as per creative designs which includes logo as directed by Authority/Dept.. Size type and height of the signages shall be approved by Authority/Dept.. Erection to be made available by two days before. Creative and readable designs shall be emphasized. Minimum size of template shall be 600mm x 900 mms. Provision of signages with detailed specifications shall be given separately by bidder. Note:-All branding shall be supported on P.C.C./R.C.C. foundations with required size bolts embedded to be designed by a competent structural designer or as approved by the Professional advisor. The flex material shall be replaced as an when damaged. Hence agency shall keep the printed flex/Vinyl/retroreflecting/ other material used set in advance. The agency has to remove the Welcome branding/Signages/Hoarding after completion of event within 2 days, so it will not create bad impression. At the time of Work order the finalization of Size, height, Qty, and other related works will be finalized by Authority/Dept..(As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

500

-

-

... More
Boundary wall, Barricading (Single side/Double side), MS-GI pipe railing etc: P/F Tin plates covered with both the side white/decorative cloth. Cloth shall be stainless and wall shall be in plumb with proper wooden or MS structure for support with minimum 2 to 3 Mt. high. This shall be used to isolate the venue from surrounding structures and restrict the entry from outside as required. The MS-GI railing/fencing shall be at least 900 mm high shall not permit easy movement across. All the stages, approach to the stages needs to be protected with necessary exits/access. It is proposed to weld/erect MS members and chain-link fence to be erected. All the railing shall be in proper alignment with uniform height. Quantity to be worked out by bidder considering approved layout. Necessary camouflaging of certain incomplete works or storage areas shall be included in the scope. All electrical installations are to be barricaded. Mode of measurement: To be considered based on attached layout and design presented by bidder before the committee members. Actual executed measurements to be considered. (a) Tin sheets barricading with decorative cloth on either side. Tinsheet to cover agency godown and office shall not measure seperately. (Note: Agency is required to take permission before starting area to be covered hiden each and every type of barricading including parking area (Tin, MS pipe, Wooden bamboo, Low height metal, que manager, colth,etc.) from PWD/PMC) (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

800

-

-

... More
Decorative cloth Barricading (Single side/Double side) of good quality (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

1000

-

-

... More
Low height metal barricading of 3ft. With min. gap of 0.45mt, Need to provide baricading with fresh color. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

100

-

-

... More
Que Manager Barricading (Belt of mininmum 2mtr) (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

50

-

-

... More
Mojo Baricading, It should be of better and presentable quality. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

300

-

-

... More
Floor covering: P/L whole area with new Agro net with double covering all areas except for the structures, already paved area and parking. The objective is to make entire venue dust free. Any additional covering suggested by Committee members/ PWD/ Professional Advisor shall be carried out without any additional cost. Mode of measurement: Mode of measurement shall be area based. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

30000

-

-

... More
Floor covering: P/L whole area with new synthetic carpet of desired colours as required by client where applicable in all areas inside and out side areas of the structures, already paved area on requirement basic. The objective is to make entire venue dust free/ indication of paths of different category of delegates/floor covering as and when required. Any additional covering suggested by Committee members/ PWD/ Professional Advisor shall be carried out. Mode of measurement: Mode of measurement shall be area based. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

4000

-

-

... More
Water supply and Drainage: (For temporary structures only ) From nearest available source to the individual structures, toilets, wash areas through GI pipes elevated steel structures, PVC water tanks, valves etc. with adequate pressure by installing pressure pumps. Adequate drainage facilities either by providing soak pit or by providing intermediate chambers and S.W. /PVC pipe lines to connect the existing nearest manhole as and where required. Continuous and adequate water pressure shall be ensured by the bidder. Mode of measurement: Shall be lump sum basic. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

1

-

-

... More
Electrification Liasoning Work: Providing services for the event as per requirement of load. Electrical Inspector approval: Entire venue electrification & temporary power connection and electrical installations from Electrical inspector office and other local authorities. From supply point to individual load point power should be distributed with proper safety precautions and properly rated materials. General Lighting should be provided in entire venue. Decorative lights, series shall be provided along the roads surrounding the venue. Getting approval from Electricity Board and Electrical inspector for main power source as a temporary base. (Contractor must get drawings & load calculation approval within TEN DAYS from date of final approval of event design & drawing by authority) Mode of measurement: all related approval from Govt. authority on JOB basis.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

1

-

-

... More
DG Set : Temporary Providing and testing silent (Soundproof/ Acoustic) DG set of following sizes, including of fuel required for running DG set with the spare stock. The cost also include loading, unloading and transportation up to site with all required accessories. Synchronized panel and required accessories to be considered. DG sets should be running full load during the event performing time, during the contruction and event must be run on DG sets Daily . no other permanent power given by the department, Daily testing of DG set is compulsory & should be carried out in presence of Consultant/ Electrical Inspector. Govt. Duties should be paid as per the norms, payment receipt should be made available on site. Mode of measurement: Based on actual work executed on site.Require layout plan and connecting load get approve from Consultant/ Electrical Inspector. Government approval for usage of DG sets is scope work of agency. Mode of measurement: Based on actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

5

-

-

... More
Panels and Distribution Boards: Temporary Providing, installation and testing of LT panels/Sub panels/ Distribution boards complete with incomer circuit breakers, ELR and change over switches of suitable size and required outgoing circuit breakers, ELCB of suitable size, along with connection of incomer and outgoing cables with required size of load wires and terminations, with suitable safe earthing for each panel/distribution board also including digging, loading, unloading and transportation from vender's store to site store including all labour work as per direction of engineer in charge. Temporary Providing & laying of XLPE(IS:7098) (I)-88 ISI marked armoured/unarmoured multistring cable of Aluminium/Copper conductor of following size for 1.1 KV to be laid on wall with necessary clamps or in cable trench/pipe at road crossing or floor complete in concealed/under ground manner or using using cable protectors , including connection and termination also loading, unloading and transportation from vender's store to site store including all labour work as per direction of engineer in charge. (Cables laid between panels and distribution boards). All the panels/distribution boards should be enclosed by enclosure box and make barricading around the panels/distribution boards such that general public shall not interact with it also it will safe for general public. (All Panels/ Dist. Boards area must be barricaded with complete installation of fire extinguishers). All the panels complete with all the required metering units i.e. Voltmeter, Ammeter, indicating lamp, power factor meter, energy meter etc. All the panels should have all the protection accessories i.e. over voltage, earth leakage, under voltage, over current, etc. Main panels should have minimum capacity of circuit breaker is 250A and maximum capacity is 1000A. (ELR protection at incomer.). Sub panels should have minimum capacity of circuit breaker is 100A and maximum capacity is 400A. (ELR protection at incomer). Distribution boards should have minimum capacity of circuit breaker is 10A and maximum capacity is 100A. All distribution board should have ELCB protection in incomer. All Panel, DB, Structure, DG sets and other required places chemical earthing should be done as per requirement and instruction of consultant & electrical inspector. (a) Main Panel (I/C from transformer and DG Set) including of all reqd.cables etc. Mode of measurement: Based on actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

30

-

-

... More
Sub Panel (I/C from Main Panel) including of all reqd.cables etc.Mode of measurement: Based on actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

40

-

-

... More
Dist. board (I/C from Sub panel or Main Panel) including of all reqd.cables etc. Mode of measurement: Based on actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

80

-

-

... More
Wall fan/Ceiling fan/pedestal fan, exhaust fan, etc. Mode of measurement: Based on actual work executed on site.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

20

-

-

... More
LED PAR LIGHT/ PARCAN LIGHT Mode of measurement: Based on actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

50

-

-

... More
150W-400W LED Flood Light Mode of measurement: Based on actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

200

-

-

... More
5/15 AMP Plug Point Mode of measurement: Based on actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

100

-

-

... More
Cable Protector (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

100

-

-

... More
Sound System and PA System : Temporary Providing, installing and testing General PA system with amplifiers, r, speakers, microphones, along with wiring including required wires/cables for the system and all the accessories with all controls at Admin office so that the general announcement shall be made at various entry and exit points, all parking area, path ways, etc. Sound system to be arranged as per various requirements like speeches, stage performance and general PA, etc. The system shall include all the required sound system. Mode of measurement: Based on actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

1

-

-

... More
Codless Mic for amouncement (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

2

-

-

... More
Snake cable (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

50

-

-

... More
Speaker. Mode of measurement: Based on actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

50

-

-

... More
Sound Mixer. Mode of measurement: Based on actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

2

-

-

... More
LED Screens/Walls: Hire charges for providing, erecting, testing and commissioning of P3.7 including media server, LED/Video processors, Monitor display, Switchers, CAT-6/Fiber cable, Power Supply and content making as per the client instruction. The scope of work includes sound system for input/output streaming. The rate should be including Truss / Wooden Raiser with masking arrangement is part of scope of work as per instruction of department.All tiles should be from one batch and same brand. Mode of measurement: Based on actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

20

-

-

... More
Events Schedule Displays - Event Schedules, right at the door with help of 55"/65'' LCD TV/Display Highly visible meetings schedule for everyone, Schedule a new meeting or make a change, and see it on any room display, syncs with the calendar systems, anything on calendar automatically shows on the display outside the room, including who's involved. Complete software and hardware integration, fiber cable connectivity or GPS base data pushing. Individual display and centrally managed display solution. It dynamically illustrates when a room is running meeting, seminar etc., what the meeting is about, and who is hosting the meeting or event - on a display at any meeting room, meeting area, in the reception, Agency to creat content incordination with autorites for entier event meetings / seminars - schedules for all days, Present days, Future days with timings, locations and brife about speakers/event and this to be displayed in each and every schedule display. Mode of measurement: Based on actual work executed on site. Detailed specifications and quantification of ambience elements shall be submitted as a separate Annexure to price bid. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

10

-

-

... More
VVIP/VIP Parking area, General parking area and related approaches: For 1000 four wheelers parking is to be considered with complete barricading. There will be more than 5 to 6 area required to develop for parking within one km around the venue. The work will involve site clearance/ removal of debris/ plants-grass cutting, grading, leveling and compacting, sprinkling water, developing entry and exits for two wheelers and four wheelers, with service staff. Minimum 10 toilets and urinal facilities, Divers Food Dinning and Seating Area shall be created for drivers at all locations with proper water supply and drainage. Developing complete General Lighting, PA System, signage within parking area is part of scope of work. Proper parking plan is to be made to ensure total no. of parked vehicles as per available areas as per discussion with department/ Traffic Department. Ensure concerned site maintenance for entire event period. Scope includes erection of signage, Barricading, preparations of detailed layouts, demarcations of layout on ground with lime etc. complete . Mode of measurement: Based on Quality and Quantity of actual work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

1

-

-

... More
Day & Night IP Dome camera with Very High Definition (1920x1080) 4/5 MP IP based 30 Mtrs.IR , fixed type camera With IP66 Weather encloser, Day/Night ,Dual streaming, 25 FPS, H.265 compression support, 3mm-9mm varifocal auto iris lens, 0.03 lux, Tamper detection, Wide Dynamic Range, Poe, IP66 rated vandal resistant surface mount enclosure, built in heater and blower, UL sects. Location as per police department, CM security & SSG instruction. System should include access points, additional control rooms, additional hard disk, base station etc. Mode of measurement: Based on actual quality work executed on site.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

40

-

-

... More
IP Outdoor PTZ camera with HD1080P 2.1MP Resolution, 25x optical zoom, Day/Night, Wide dynamic range, Dual H.265 streaming, 0.1 lux, Two way audio support, vandal resistant, 360° continuous pan, -5° to +95° tilt, 256 preset, 4 tours, IP66 rated with built in heater and blower, PoE+ Location as per police department/CM security/ SSG instruction. Mode of measurement: Based on actual quality work executed on site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

5

-

-

... More
Control Equipment like VMS software with recording and view server and storage for 24 hrs recording for 7 days at 720P at 25 FPS in place of Video Management Software (VMS) currently having License for 55 cameras and expandable to 250 Cameras, Shall be loaded with 5 Client Licenses, Virtual Matrix Capability, Two Way Audio capability, Advanced Alarm Escalation Matrix capability, Multilayer Map support, Scheduled Back up utilities, Privacy Masking, Operator On Screen Activity recording feature, in-built reporting tool etc. Failover (VMS) & Failover Recording for 40% Critical Cameras from failed Server. The cost of the required software licenses & any additional Server / Storage if required by the bidder to be included in this item. NVR capable to store recording of 65 HD cameras for min. 8/15days @ 12/24 FPS @ HD 720P Continuous Recording. Minimum specs should be Industrial Grade Server Hardware for video recording with 19" rack mount chassis, minimum of Intel Xeon E5620 2.4Ghz, 12MB, 1066MHz Memory speed, 2x2GB or more of RAM, 2 x 250GB (Dual mirrored) RAID 1 configured hot swappable HD's for OS and CCTV software, 6 x 2TB RAID 5 configured (9TB or more usable) hot swappable 7200RPM, 3Gb/s HDs for video storage, Embedded Dual Gigabit NICs in fault tolerance configuration, Microsoft® Windows 2008 R2 64 bit pre-installed Embedded Server OS, Redundant power supply etc. Industrial Server shall be of Dell, HP or IBM make 1or any of these Co-branded with CCTV OEM make. (Co-branded product shall also carry original onsite warranty from original OEM i.e. IBM/HP/Dell) . Layer 2 Switch with 24 x 10/100 Poe copper ports and 2 SPF Ports and support for IP Multicast snooping and data driven IGMP, Including 9URACK as required. Layer 3 Switch with 24 x 10/100/1000 Poe copper ports and 4 SPF Ports and support for IP Multicast snooping, querier and data driven. 3 KVA UPS ( Single Phase In Put For 20 to 30 minute back up). (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

1

-

-

... More
AMBIENCE with minimum 6 elements as finalize by the Authority: - Theme Decoration to be proposed by the Bidder: The amibence elements shall be related to current 83th IRC sessions , development of spiritual palces of the state, its mythological significance. The same shall be in prior approval with authority. All these elements shall be in 3D/4D models and appropriately of larger sizes minimum 5m for proper selfie points. The required ambience elements must be innovative in nature, technologically showcasing with informative panels and artistically of significant value. The repeatatively used, old, torn out elemnts must be avoided for freshshowcasing.The Theme of proposed development is 83th IRC Sessions and theme proposed by bidder. The decoration shall be proposed by the bidder and same shall be finalized in consultation with Committee member of PWD. Other elements of venue seating, creating suitable festival ambience are part of scope. It is to be erected as approved by PWD/Committee and as per presentation conducted. Preparation and erection of creative display panels is part of scope. Necessary changes suggested by PWD/Committee/Professional Advisor shall be incorporated without any extra development cost. Detailed specifications and quantification of Ambiance elements, 3D models as per theme approved by PWD shall be submitted. Necessary 3D models, Backdrops/Decorative railing, symbolic gates/Entry gate lighting/Archies inside venue & works/Services/Theme lighting/Landscaping/Panel works/Sound arrangements/Making of film or as applicable shall be part of scope of works. General lighting (Tube lights, par lights, LED, metal, haleogen, etc.), covering series light entire boundary, ambience item is part of scope of work. Showcasing various electronic scrollers depicting Theme is part of scope of work. Other Barricading, 3D sculptures, Fountains, theme ambience items, etc. electrical equipments and material like general lighting (tube lights, par lights,LED, metal, haleogen, etc),ELCB, MCB, wiring etc and related electrical items shall not be measure seperately and will be consider as part of ambience. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding) Note : Need to show design of all installations in the concept presentation.

6

-

-

... More
Thematic 3D Facade infront of all the strucutres as per the theme approved by PWD/PMC with proper supporting struture.Add 3D elements and use materials like 6 mm ply fixed on wooden/steel frame work and painting,POP,Flex,Backlit Flex etc.Height Min. 20ft. With back support strucure aganist wind velocity.The scope also includes thematic sitouts minimum 4-5 locations throughout the venue. All structures will have a common continous front facade,the same has to be shown in the concept presentation. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

1

-

-

... More
Potted plants and Landscaping: In accordance with theme of the. Suitable development of green plants with flowering/ Croton plants should be done around the venue and in the common space/areas as proposed theme by the bidders. New fresh flowers should be used to match the theme and color scheme for all events happening during AfDB convention in Main Halls/ Meeting rooms/ Offices/ all lounges & all structures etc. complete (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

500

-

-

... More
Flower decoration at Entry gate, Stage, VVIp lounge, conrface hall, Golf cart, Table Arrargement, Bouquets or any other area as directed by authority is aprt of scope of work (Considering Inauguration and Special VVIP visit): as per requirements In accordance with Theme of the Event for entire event as per requirement and directed by PWD and for all structures as finalized by PWD. Special decoration using flower is part of scope of work. New Asthetic real fresh flowers like orchid, lily, roses etc. should be used to match the theme and colour scheme. Agency need to do as many times flower decoration work is part of scope of work. Mode of measurement: Based on actual work done based on as many times. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

1

-

-

... More
Pole with Flags: (Two-Three different types of Logo i.e. Event Logo, IRC Logo,State Goverment Logo, and any other Logo printing on Flags as per design and sequence is finalized by PWD) Good quality satin/silk cloth (Considering brand new type) with Logo as directed by Authority/Dept., proper painted poles in alliance with theme décor with various locations in venue. The pole should be coloured and separated from Electrical poles. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

250

-

-

... More
SERVICES : Fire-fighting, extinguishers : A B C Type Dry Powder Fire Extinguisher, CO2 Fire Extinguisher, Dry Powder Fire Extinguisher - 4/6 Kg capacity as per statutory requirement. Necessary approvals are to be taken by the bidder. All Panels/ Dist. Boards area must be barricaded with complete installation of fire extinguishers. Submission of Approval or certification of necessary statutory body is mandatory. Mode of measurement: Mode of measurement shall be Nos based. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

200

-

-

... More
Supply and installation of 52 inches Plasma TV with SS stands for stage delegates to view as per the site requirement. The scope includes complete cabling and connectivity with mail server/switcher Supply and installation of 4 sets of Laptop (latest version) with USB storage devices & laser pointer which can be used for presentation purpose, incuding all required connection and accessaries etc. Mode of measurement: - Based on actual work executed at site. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

5

-

-

... More
Arrangement /provision and management of Communication systems for entire event as required by client for client use only. Walky-Talky ( For PWD/Client officials/Consultants Only) ( for entire event) Mode of measurement: Mode of measurement shall be Nos based. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

15

-

-

... More
Agency need to illuminated Auditorium vanue with the different types & varieties of lighting, before the execute agency must be approved the concept design & Demo before execute the work.

1

-

-

... More
Misc. items : Providing Dust bins of approved quality min size-2'x2'x3' or as required size by client to be placed at required locations. Mode of measurement: Mode of measurement shall be Nos based. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

100

-

-

... More
Providing Golf carts battery operated and capable at running on hard surfaces as required by client. ( for 7 days) with operators in proper dress. Mode of measurement: Mode of measurement shall be Nos based. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

4

-

-

... More
Frisking room (2m X 2m) : Providing and arranging frisking room with octonorm panel, cloth curtain or equivalent material shall also be arranged by the bidder as per the location confirmed by PWD / committee/ Professional advisor. (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

3

-

-

... More
Photography & Videography : Digital Photography: Agency to arrange the digital photo shoot for all days of the events. Agency to shoot and compose the photo Album of event date wise, VVIP - VIP, Tourists Visit, different activities, Surrounding Locations and Sights, Culture Program stage , All over ambience, structure, etc. Agency to submit softcopy by way of hardcisk in duplicate printed date on thehardcisk/pendrive and Karizma/Offset Album of size 12" X 15" or 12" X 12" with 300 nos. photos. Including of providing telecast of live on social media (Facebook, Youtube & Instagram) with require camera output and including cabeling. The scope of work also inculdes audio and video output to OB van and doordarshan and any other Channels service provider as directed by authority. Agency need to provide all necessary equipments and other related materials (including jimmy jib crane,4-camera, etc.) The programme shall be shown live on Tvs channels, facebook, youtube etc. The bidder shall be responsible to provide internet connectivity of 1 GBPS and necessary at outlets. HD Videography: Agency to arrange, HD Video shoot for all days of the event date wise, VVIP - VIP Visit, Tourists Visit, different activities, Surrounding Locations and Sights,Culture Program stage, All over ambience,structure, etc. Agency to shoot and edit the video and to submit the hardcisk of edited video. (Max. 90 Mins & 5 Copies of DVDs/pendrive) Editing and sound mixing is a part of job. Note - Agency have to provide softcopy of photography on daly basis to authority without fail. Item is operated only if authority required. Entire Event Documantation Using highend camera (HD OUTPUT) setup as per requirment of the event. multi camera setup & live editing Concole with all Cabeling. Setup before 1 day of the event with Proper man power ( 8 camera man, 4 Video grapher, 1 Drone shoot & Operator).(As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

1

-

-

... More
Pre-event days Security services for entire day: Making arrangements for security guards in traditional uniform for 3 days prior to event. Auditing pre-event security at the venue, analysing of security audit report for pre- event days. (guards, bouncers, metal detectors) at all gates, VIP Lounge etc,back stage and VVIP seating areas covering entire venue . Security arrangements to be made at all parking areas fixed for the event by PWD within/outside the venue. Audience/crowd control and management for events dor stipulated scop of works within the Venue is part of scope of work. Submit development plan & List of Personnel to be deployed. Age group of security guard shall be between 25 - 45 years only.3 days prior to event (3 days) (10 security x 3shift x3 days) (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

90

-

-

... More
Making arrangements for security guards in traditional uniform for five days of event. Auditing event security at the venue, analysing of security audit report for event days. (guards, bouncers, metal detectors) at all gates, VIP Lounge etc,back stage and VVIP seating areas covering entire venue. Security arrangements to be made at all parking areas fixed for the event by PWD within/outside the venue. Audience/crowd control and management for events door stipulated scope of works within the Venue is part of scope of work. (Ensure 100 Nos. of Security guard at any point of time during 24 hours a day) Submit development plan & List of Personnel to be deployed. Age group of security guard shall be between 25 - 45 years only. payments shall be made on pro-rata basis , if events days at ahmedabad are reduced or increased. (A) Security guard (5 Days) (A) Security guard Shift 01: 00.00am hrs to 08.00am hrs : 10 Person Shift 02: 08.00am hrs to 16.00pm hrs : 20 Person Shift 03: 16.00pm hrs to 24.00pm hrs : 15 Person (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

225

-

-

... More
Bouncer (5 Days) for two shift (8 bouncer x 3 shift x 5 days) Shift 01: 00.00am hrs to 08.00am hrs : 02 Person Shift 02: 08.00pm hrs to 16.00pm hrs : 10 Person Shift 03: 16.00pm hrs to 24.00pm hrs : 10 Person (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

110

-

-

... More
SERVICES: - Housekeeping (with tools, equipment, consumables etc.): Event Contractor shall have to consider all the service staff from mobilization to demobilization from site, consumables, equipment, tools etc. Providing Sweepers for General cleaning of the entire venue, themege disposal, cleaning of food stall area, craft stall, water counter, entiry gate and surrounding area, stage area and toilet cleaning with two teams operating in each block in uniform. Providing Min. 80 No’s of dustbins to maintain venue proper hygiene is a part of scope of work. Consider all Swachta Abhiyan Norms. Providing skilled manpower like electrician, mason, plumber, carpenter, technician etc as required. Manpower deployment plan is to be submitted to the PWD /Professional Advisor. Bidder will be resposible for food stay lodging boarding and transportation uniform and any other related charges is a part of scope of work. Entire housekeeping works for Beach area and Green rooms shall commence from two days prior the event and for other structures within Venue before one day. (Arrangements for tentative 20 person X 2 shiftX 8 days (including 2 day prior of event & 1 Day after event ) (As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

320

-

-

... More
German aluminium temporary hanger/Pagoda with made of aluminium extrusions with base plate that are anchored to the ground. The hangar structure should be able to withstand wind speed upto 100 KMPH.The Hangar will be completely weather proof and with adequate number of entry exit points including emergency exit with proper Aluminium and Glass Doors.Roof covered with waterproof and fire retardant fabric / good quality PVC Fabric cover (SRF), ceiling with Theme based fabrics. Interior work as per the usage and purpose of room. Partitions shall be made in prefabricated aluminum sections (ht. up to 2.50 Mts.) with laminated panels with arrangements for doors, glass windows for conference room and reception area with waiting lounge and providing necessary tables, sofa, chairs, dustbins, theme, pantry and drinking water facilities, providing Porch with carpet and wooden platfrom, Stairs, ramps, railing and work station for telephone and fax line is a part of scope of work. Providing150 to 300 mm raised platform with 19 mm thick Fire retardant Plywood/block boards supported by wooden logs and covered with good quality of synthetic carpet. Front facade with minimum 6 mm ply fixed on wooden/steel frame work and painting etc. complete. The scope shall cover to provide general lighting, fans, AC, CCTV Cameras having control in Administartion Office. Necessary electrical points (5/15A plug points), wall fan/ ceiling fan/ padestral fan/ exhaust fan as per requirement, General lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.) for inside dome and for preparation of fascade as per theme approved by Department as per Instruction is a part of scope of work. The lights should be enough upto the satisfaction of Department and if required extra lighting shall be done without any extra cost. The entire area should be air conditioned and temperature should be maintained between 23 to 26 degree Celsius equally distributed. Agency need to Internal and external sides cover with using theme decorative flex with frame of ht. up to 10ft minimum as per requirment is a part of scope of work. All materials have to be fire-retardant material and necessary documentation evidence/certificates are to be provided. All wiring should be in rigid PVC conduit protected with ELCB & voltage stabilizer & dedicated earthing. The structure should be ready before five days. Mode of Measurement: - Built up area (Out to Out dimensions of walls) in plan shall be measured of structure. Outside porch and external passage shall not be measured. Other electrical equipments and material like general lighting (using Tubelights/PAR lights/Metal/Halogen/CFL/LED lights, etc.)(5/15 A plug points) etc), fans, AC, ELCB, MCB, wiring etc and related electrical items shall not be measured seperately.(As per direction of committee, in this regard the decision of engineer in charge will be final and binding)

75

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.