NMDC Limited Tender

... More
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

NMDC Limited - NMDC Tender

Works
Civil And Construction
Eprocure
Opening Date2 Sep 2024
Closing Date3 Oct 2024
Tender Amount₹ 1,89,65,074 
Notes
Download

Costs

Summary

Biom/bc/contracts/ote(90)/ 24-25/civil/c-383

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removing/chipping loose concrete of above 40 mm average depth upto and including 60 mm average depth (excluding plastering), carefully by manual or low impact frequency hammer without damaging the existing concrete and cleaning the surfaces by compressed air jet complete, including removal of loose concrete around the reinforcement. The debris shall be disposed upto a lead of 100m. The entire surface will be checked by light hammering (using 1 kg hammer) for detection of loose concrete. Edges of chipped patch will bear vertical/reverse cut with minimum depth at edges as 10 mm. (Prepared patches to be got checked before applying bond coat). All loose/sound concrete around corroded bars have to be removed to prepare well defined patch.

1143

-

-

... More
Cleaning of reinforcement of total rust including from behind the reinforcement bars to give them totally rust free finished steel surface, by manual methods or by sand blasting and using approved chloride free alkaline rust remover, whereever required. The item includes the cost of rust remover. For measurement and payment, patch area of concrete repair work shall be taken.

762

-

-

... More
Providing additional steel reinforcement to damaged structural elements inculding straightening, cutting, bending, placing in position, anchoring/welding, all complete using CTD/HRD/TMT bars

1143

-

-

... More
Providing and applying two coats of anti corrosive treatment to the exposed reinforcement bars as well as new bars after surface preparation to give 50 DFT approx., using Zinc rich epoxy based primer with zinc content in dry film by weight 84% and volume solids 57% +/- 3% complete. For measurement, patch area of concrete repair work shall be taken.

762

-

-

... More
Providing and fixing/inserting PVC/NYLON nipples with approved an epoxy compound confirming to ASTM C881 Type 1 Grade 3, class B & C after drilling 12mm dia. holes for grouting, including subsequent cutting & removal of the same after grouting is completed.

5027

-

-

... More
Sealing/grouting of cracks/porous concrete by injection process through nipples complete using low viscosity based epoxy resin grout with viscosity 270 ± 50 cps and slant shear bond strength 18Mpa when tested as per ASTM C882 @ 7 days and compressive strength of 70Mpa@ 7 days when tested as per ASTM C 579 of approved brand as per manufacturer's specifications. Note:- Payment will be made for actual quantity of epoxy injected.

5027

-

-

... More
Injecting cement slurry admixed with expannding type free flow grout gauged in S.B.R solution as per manufacture rs specification (mode of measurement as per cement consumption)

5027

-

-

... More
Providing and applying structural grade non-dispersible SBR (Styrene Butadiene Rubber) latex bond coat by brush application on old concrete including its surface cleaning, surface preparation and formwork, wherever required, prior to application of any type of mortar conforming to ASTM C-1059-86 Type-I tested as per ASTM C-1042 to ensure bond between old and new concrete.

2286

-

-

... More
Note:-1) 60ml of latex shall be used for 100 gms of cement. Higher latex content may be required depending upon manufacturer's recommendation to meet requirements of ASTM C-1059-86 Type-I. 2) For measurement, patch area of repair work will be taken

-

-

-

... More
Building up the profile upto 40 mm average depth of structural members by using latex modified air cured mortar system conforming to ASTM C-1059-86 Type I all by wieght (1 Cement:3 parts graded cleaned river sand mixed with 10% SBR latex (having 49 % solid content in emulsion by weight of cement)) with 0.35 water cement ratio adding polypropylene fibres to reduce shrinkage, in 10-15 mm thick layers in damaged areas of concerete including applying bonding agent in between the layers of mortor, level profiling, proper curing with gunny bags for the repaired work including form work wherever required, complete. Note :- For measurement and payment, patch area of repair work shall be taken.

1143

-

-

... More
Building up the profile of average depth more than 40mm and upto 80 mm average depth of structural members by using latex modified air cured mortar system conforming to ASTM C-1059-86 Type I all by wieght (1 Cement:3 parts graded cleaned river sand mixed with 10% SBR latex (having 49 % solid content in emulsion by weight of cement)) with 0.35 water cement ratio adding polypropylene fibres to reduce shrinkage, in 10-15 mm thick layers in damaged areas of concerete including applying bonding agent in between the layers of mortor, level profiling, proper curing with gunny bags for the repaired work including form work wherever required, complete. Note :- For measurement and payment, patch area of repair work shall be taken.

1143

-

-

... More
Providing and applying low viscous thermosett monomer impegnation by brush on the clean and dry surface of concrete, brushing @ 4 Sqmt/kg of Monomer in one coat, air curing etc., complete.

2286

-

-

... More
Protective Coating:- Surface cleaning by removing dust/coating, if any, to completely expose concrete without chipping and without damaging concrete, repair of surface i.e., cleaning, filling of cracks, joints with Low Viscosity MMA based polymer resin etc., wherever, needed and applying an appropriate priming coat of primer compatible to substrate (Cemetatious).

1143

-

-

... More
Supplying & applying two or more coats of ready mixed SBR based coatings with broad brush of roller over a coat of primer (of penetrating silane siloxane based primer) over prepared surface, using not less than theoritical consumption as per the manufacturer's specification and direction of Engineer-in-Charge. Time gap between two coatings shall not be less than 8 hrs. Total dry film thickness (DFT) including primer shall be 225-240 microns. Coating shall be ready mixed UV resistant acrylic polymer based water proof protective coating. The coating material shall be single component aliphatic acrylic coating system (AAC) compatible with primer giving coverage of about 5 - 6 sqm per litre per coat. Both primer and protective coatings shall be of reputed make and approved by EIC in sealed containers.

-

-

-

-

-

-

... More
Prices must be filled in the exact same format as given above. Any variation in format, description, unit, quantity or T&C, if noticed, may lead to rejection of the bid.

-

-

-

... More
In case some or many of the items of BOQ are left blank, the offer and subsequent evaluation shall be treated as per the manner specified in clause no. 12.3 of ITT.

-

-

-

... More
In case of discrepancy between rates and amount quoted above, the quoted rates shall prevail and appropriate corrections shall be made by corporation during evaluation.

-

-

-

... More
Adjustments made by the Corporation as a part of Correction of Errors in the quoted BOQ, shall be final and binding upon the bidders. If a bidder does not except the corrected calculation, their bid shall be rejected.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.