Nava Raipur Atal Nagar Vikas Pradhikaran Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.
Nava Raipur Atal Nagar Vikas Pradhikaran Tender
Civil And Construction
Drainage Work
Opening Date8 Feb 2024
Closing Date19 Feb 2024
Tender Amount₹ 4,23,72,768.1
Costs
EMD
₹ 4,23,728Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
152709Bid Award Id
ViewTender No
152709Tender Authority
Nava Raipur Atal Nagar Vikas Pradhikaran ViewPurchaser Address
-Website
http://eproc.cgstate.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Surface dressing of the ground including removing vegetation and making up undulations and in-equalities not exceeding 15 cms in depth/ height including disposal of rubbish upto 1.5 m lift and lead upto 50m (at least 5m away from the dressed area).
1000
7480
7.48
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
1000
3840
3.84
... More
Excavation in all types of soils, using mechanical means including loading in tipper for disposal of excavated earth to disposal site, unloading and spreading with dozer for all lifts and lead upto 3 Km for 90% of excavated soil and 10 Km for 10% of excavated soil as per direction of engineer in charge and as per relavent clauses of section 300. This Item is inclusive bailing out of water and excavation of marshy soil, wherever required. Nothing extra shall be paid on account of extra lead involved due to excavated soil to be reused in filling / refilling within the lead as specified above. The rate is inclusive of the stacking of excavated top cohesive soil for use in the lining of developed water bodies.
23278.7
2418424
103.89
... More
Excavation in ordinary rock including loading in a truck and carrying of excavated material to embankment site with in all lifts and leads upto 3 Km as per relevant clauses of section 300.
7956.72
1587127
199.47
... More
Excavation in Hard Rock (requiring blasting) with disposal upto 3km (Excavation in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal with in all lifts and leads upto 3km as per direction of engineer in charge as per relevant clauses of section 300.
5983.18
1404791
234.79
... More
Construction of Embankment with Material Deposited from Cutting (Construction of embankment with approved materials deposited at site from cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) all complete as per direction of engineer in charge
-
-
83.11
... More
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification as per clause 2503 all complete as per direction of engineer in charge.
427.68
1072138
2506.87
... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical
specifications as per section 2504. all complete as per direction of engineer in charge. Stone/Boulder
211.2
529450
2506.87
... More
Grouting with C.M. 1:4 in Pitching as per drawing and technical specification all complete as per direction of engineer in charge.
638.87
663727
1038.9
... More
Puddle filling of good clay (excluding cost of puddle earth including transportation, loading and unloading mixing, watering and kneeding by tamping, ramming, and laying etc.) all complete as per direction of engineer in charge.
7515.87
796456
105.97
... More
Pointing with cement mortar (1:3 ) on stone masonry head walls as per Technical specifications section 1300 and 2200 all complete as per direction of engineer in charge.
488
16221
33.24
... More
Plain cement concrete complete as per drawing and Technical Specifications. PCC Grade M 15 all complete as per direction of engineer in charge.
371.4
1453875
3914.58
... More
Providing and laying of apron with Cement Concrete Blocks of size 0.5 x 0.5 x 0.5 m cast in-situ and made withnominal mix of M-15 grade cement concrete with a minimumcement content of 250 kg/cum as per specification all complete as per direction of engineer in charge.
160
782083
4888.02
... More
Stone masonry work in cement mortar 1:3 for head wall complete as per drawing and Technical Specifications section 1400 and 2200 all complete as per direction of engineer in charge.
336
864299
2572.32
... More
Manufacturing, supply & fixing of precast kerb stone of size 400mm x 259mm x 200mm thick made of M-20 concrete rectangularin shape with one corner chamfered by 100 mm x 100 mm asapproved design i/c cost of all material, labour and curing etc. all complete as per direction of engineer in charge.
18070
2628281
145.45
... More
Providing and laying nominal mix plain cement concrete with crushed stone aggregate using concrete mixer in all works upto plinth level excluding cost of form work.
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size).
144.56
446028
3085.53
... More
Providing and laying Reinforced Cement Concrete pipe NP 3 /prestressed concrete pipe on first class bedding. (Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets), all complete as per direction of engineer in charge. Pipe diameter : 1000 mm dia
150
1054536
7030.24
... More
Providing and laying Design mix Reinforced cement concrete (RCC) with crushed graded stone aggregate 20mm nominal size using batching plant, transit mixer and concrete pump, in all works upto plinth level excluding cost of form work all complete as per direction of engineer in charge. M-20 Grade
1154
5072510
4395.59
... More
Providing and fixing form work including centring, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for: Foundations, footings, bases of columns plinth beam, curtain wall in any shape and size and all type of wall below plinth level.
1701.6
245728
144.41
... More
Providing and placing in position reinforcement for R.C.C. work including straightening, cutting, bending, binding etc. complete as per drawings including cost of binding wire in foundation and plinth all complete:Thermo-Mechanically treated bars FE 500D
92320
5227158
56.62
... More
Supplying and fixing in position Chain linked Steel wire fabric made of 4 mm dia G.I. wire of required width in mesh to concrete/ wooden/ angle iron posts including securing and screwing with 2mm dia G.I. wire, G.I. staples, G.I.U-nails or steel pins etc., complete. Aperture 75x75mm.
10842
3277753
302.32
... More
Supplying and fixing cement concrete boundary pole of height 1980 mm, cross section 100 mm X 100 mm at top and 150 mm X 150 mm at bottom with concrete of Grade 1:1.5:3 using 8 mm dia main reinforcement ( 4 nos ) and 6 mm dia stirrups @ 300 mm c/c including transportation at site ( Excavation and concrete for fixing to be paid seperately ) and as per direction of Engineer-in-Charge.
2780
1014310
364.86
... More
Grassing with grass including watering and maintenance of the lawn for 30 days or more till the grass froms a thick lawn free from weeds and fit for mowing including supplying good earth if needed (the good earth shall be paid for separately). 5 cm in each direction as approved by engineer on Charge
(1) Doob / local grass/ Wetland grass/ Khash grass
72280
495840
6.86
... More
Supplying and stacking at site well decayed cow dung manure & Vermi-Compost from approved source, including loading, unloading and carriage upto 5 km (manure measured in stacks will be reduced by 8% for payment).
1417
347420
245.18
... More
Mixing earth and sludge or manure in proportion specified or directed.
5715.56
65328
11.43
... More
Filling mixture of earth and sludge or manure in the desired proportion in trenches, flooding with water and levelling (cost of supplying earth and sludge / manure / mixing excluded )
5715.56
29663
5.19
... More
Supply of good quality approved Avenue trees (Fruting or non Fruting ) with minimum 4 feet height including transportation to site, well developed and well grown condition and as per direction of Engineer in charge.
33740
4696945
139.21
... More
Plantation of Trees at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cost of plant ). Trees Plant
33740
260135
7.71
... More
Maintenance of tree Plantation works for 5 years: The work is inclusive of replanting at the location of the damaged planted trees during the course of contract maintenance period , watering of plants & irrigation system, deweeding, supply and application of insecticides, pesticides and fertilizers all complete and as per direction of Engineer in charge.
-
-
-
... More
1st year
33740
2623622
77.76
... More
2nd year
33740
1172465
34.75
... More
3rd year
33740
1107346
32.82
... More
4th year
33740
368103
10.91
... More
5th year
33740
367091
10.88
... More
Total Amount
-
42372768
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements