Department Of Rural Development And Panchayats Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

Department Of Rural Development And Panchayats Tender

Works
Civil And Construction
Road Construction
Opening Date28 Jun 2024
Closing Date22 Jul 2024
Tender Amount₹ 11,46,64,000 
Notes
Download

Costs

Summary

Nit 957 Cons. &main. Pm-janman Rural Connectivity Batch-i , Pkg No Cg 11-78 District-

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (A) In area of non-thorny jungle

-

-

5

... More
Compacting Original Ground / Existing Embankment

-

-

-

... More
Loosening, Levelling and Compacting original ground/existing embankment/supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.

-

-

21

... More
Excavation in Cutting in Soil by manual means with lead upto 50 m

-

-

-

... More
Excavation for roadway in soil for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 Earth Work Summary Sheet (B)

-

-

65

... More
Construction of Embankment with Material Obtained from Roadway Cutting

-

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Earth Work Summary Sheet (H)

-

-

55

... More
Construction of Embankment with Material Obtained from Pits

-

-

-

... More
Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 (Beyond 250m)with all leads as per Technical Specification Clause 301.5(Having CBR more than 5) Earth Work Summary Sheet (J)

-

-

176

... More
Construction of Subgrade and Earthen Shoulders

-

-

-

... More
Construction of sub-grade and earthen shoulders with approved material (Granular material having CBR not less than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification

-

-

180

... More
Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1)

-

-

-

... More
Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III)

-

-

650

... More
WBM Grading 2

-

-

-

... More
Providing, laying, spreading and compacting mechanically crushed stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

-

-

1415

... More
WBM Grading 3

-

-

-

... More
Providing, laying, spreading and compacting mechanically crushed stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

-

-

1513

... More
Construction of Subgrade and Earthen Shoulders

-

-

-

... More
Construction of sub-grade and earthen shoulders with approved material (Granular material having CBR not less than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification

-

-

180

... More
Prime Coat (Low Porosity)

-

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

43

... More
Tack Coat

-

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

13

... More
Mix Seal Surfacing

-

-

-

... More
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509, Viscocity grade (VG) Bitumen specification as per IS 73:2006

-

-

140

... More
Cement Concrete cell fill Pavement

-

-

-

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501

-

-

5836

... More
Providing & Fixing of PMGSY 'Logo' board Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings.

-

-

6626

... More
A Typical design of PMGSY information sign Board is shown in fig .1700.1 .The specifition and installation details of typical sign board are given below.

-

-

-

... More
The board will be a composite unit consisting of three plates of Alumininm Composite Materials (ACM), material specifications are per Clause 1701.3.7 The top most plate will be in diamond shape of 600 mn x 600 mm sizr, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size on back on edges. The middle plate will be 1200 mm 150 mm size riveted over welded rvr.s. angle iron frame of 25 mm x 25 nm x 5 mm size on back on edges. The main Iower most plate wiII be 1500 mn x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG ) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate wilt be flushed with the top of 75 nm dia medium steel tube posts and these posts will be embedded in cement concrete M 15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower nost plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders etc. of middle and bottom plate, pMGSy logo on top plates shall be as per clause 1701.4.6 messages/Borders. All the section of frame and posts will be painted with primer and two coats of Epoxy paint The steel tube below ground level will be painted with three coats of Epoxy paint The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sing in a contrasting colour or by stamping in characters not exceeding 50 mm in height.

-

-

17699

... More
Direction and place identification signs up to 0.9 Sqm. sisn board Providing and erecting direction and place identification of Retro reflective sheeting classs A/ class B sign boards type IV as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORI) specifications ofrequired shade and colour. Supported and welded on two nos.47 mm x 47 mm of 12 SWG square tube of 3050 mm height duty strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mmr 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

-

-

6244

... More
Kilometre Stones & Boundary Pillar

-

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703

-

-

-

... More
5th Kilometre Stone (precast)

-

-

3700

... More
Ordinary Kilometer Stone (Precast)

-

-

2194

... More
200 m stone (precast)

-

-

463

... More
Boundary Pillar Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

-

-

517

... More
Providing & Laying Cement Concrete Pipe NP3 on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets as per clause 1106 .(A) 600 mm dia

-

-

2928

... More
Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.)

-

-

604

... More
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and One No. Hume protection work as per drawing and technical specification Clause 1908

-

-

925

... More
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908

-

-

1979

... More
Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

253

... More
Providing and laying rounded hump type of Speed Breaker confirming to IRC – 99 and as per guidelines and drawings of NRRDA circular no. DO No. P-17019/6/2006/PII Dated 16 Sept 2009, including providing, laying and compaction of GSB, G II, G III, OGPC, Seal Coat Type B, as per specifications and appended drawing on both the sides of carriage way up to formation width maintaining rounded hump type shape with bituminous mix material i/c providing and painting of black and white strips, providing and fixing of two no. 600mm equilateral semi reflecting sign boards, i/c cost of all materials, labour T & P & Machinery etc complete and as directed by engineer in charge as per relevant clauses of MORD specifications. For 7.50 M Formation Width

-

-

22547

... More
Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

253

... More
Construction of Plain Cement Concrete Drain with P.C.C. grade M-15 including all shuttering/form work etc. complete as per drawings/technical specification and direction of engineer in charge.

-

-

3811

... More
Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 (Nominal mix 1:3:6)

-

-

3648

... More
Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)

-

-

911

... More
Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II P.C.C grade M 15(Nominal mix (1:2.5:5)

-

-

3731

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I P.C.C grade M 15 (Nominal mix (1:2.5:5)

-

-

3848

... More
Providing and laying concrete for reinforced cement concrete in superstructure as per drawing and technical specification Clause 800,1205.4 & 1205.5 I. R.C.C grade M 20 (i) For nominal mix 1:2:4

-

-

4885

... More
Providing and laying concrete for reinforced cement concrete in superstructure as per drawing and technical specification Clause 800,1205.4 & 1205.5 R.C.C. grade M 25 (Design Mix)

-

-

5223

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry

-

-

4632

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

-

-

54560

... More
Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

239

... More
Filler Joint (II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications

-

-

308

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

-

-

9091

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Granular material

-

-

732

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications as per section 2504

-

-

1440

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications including trimming of slopes to proper profile and preparation of bed as per section 2504

-

-

1660

... More
Dismentaling of Structere like Culverts, bridges , retaining walls and other structure compraising of masnory, cement concrete, wood work, steel work, including T&P and scaffolding whweever necessary, sorting the dismenteled material, disposal serviceable material with all lift & lead of 1000m as per Technical specifications Clause 202. By Manual Means

-

-

1045

... More
Removing all type of hume pipe & stacking within a lead of 1000m includiung earth work & dismentaling of masnory work as per technical specification Clause 202

-

-

222

... More
Construction of un-reinforced, jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying, primer, sealant, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.

-

-

5097

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m

-

-

4316

... More
Total Cost of Construction work

-

-

-

... More
Add 18% GST of Construction work

-

-

-

... More
Grand Total Cost of Construction work

-

-

-

... More
SAY IN LAKHS

-

-

-

... More
Maintenance of Road for First Year

-

-

30000

... More
Maintenance of Road for Second Year

-

-

40000

... More
Maintenance of Road for Third Year

-

-

70000

... More
Maintenance of Road for Fourth Year

-

-

110000

... More
Maintenance of Road for Fifth Year

-

-

150000

... More
Total Cost of Maintenance work

-

-

-

... More
Add 18% GST of Maintenance work

-

-

-

... More
Grand Total Cost of Maintenance work

-

-

-

... More
SAY IN LAKHS

-

-

-

... More
Grand Total Construction work & Maintenance In Rs.

-

-

-

... More
SAY IN LAKHS

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.