Chhattisgarh Housing Board Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

Chhattisgarh Housing Board - CGHB Tender

Works
Civil And Construction
Civil Works Others
Opening Date28 Dec 2023
Closing Date4 Jan 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Combined Column

16.2

-

-

... More
Providing and laying nominal mix plain cement concrete with crushed stone aggregate using concrete mixer in all works upto plinth level excluding cost of form work.

-

-

-

... More
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size).

-

-

-

... More
Column

5.75

-

-

... More
Combined Column

0.83

-

-

... More
Providing and laying nominal mix reinforced cement concrete with crushed stone aggregate using concrete mixer in all works upto plinth level excluding cost of form work.

-

-

-

... More
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size).

-

-

-

... More
Footting

9.79

-

-

... More
Combined Footting

1.44

-

-

... More
Column up GL

2.28

-

-

... More
Column up PL

1.37

-

-

... More
Beam (200 x 300)

6

-

-

... More
Column Above G.L.

4.1

-

-

... More
Coping of Compound wall

3

-

-

... More
Total (A+B+C) =

33.1

137812

4163

... More
Extra for laying PCC/RCC of any grade in superstructure above plinth level for every floor or part thereof in addition to rate for foundation and plinth:

-

-

-

... More
Column Above P.L.

4.1

-

-

... More
Coping of Compound wall

3

-

-

... More
Providing and placing in position reinforcement for R.C.C. work including straightening, cutting, bending, binding etc. complete as per drawings including cost of binding wire in foundation and plinth all complete:

-

-

-

... More
Thermo-Mechanically treated bars FE 415

-

-

-

... More
Quantity as per Item no.3

33.1

-

-

... More
RCC @ 100/- Kg. Per Cum. =

3310.4

180417

54.5

... More
Providing and fixing formwork including centering, shuttering, strutting staging propping bracing etc. complete and including its removal at all levels for:

-

-

-

... More
Foundations, footings, bases of columns plinth beam, curtain wall in any shape and size and all type of wall below plinth level.

-

-

-

... More
Footing Base

19.76

-

-

... More
Combined Footing Base

1.28

-

-

... More
Column Footing

36.48

-

-

... More
Combined Column

2.4

-

-

... More
Column upto GL

15.2

-

-

... More
Column upto PL

9.12

-

-

... More
Beam

120

-

-

... More
Columns, Pillars, Piers and likes- rectangular or square in shape

-

-

-

... More
Column

27.36

-

-

... More
Window sills, anchor blocks, string course, bends, copings, bed plates and like.

-

-

-

... More
Coping of Compound wall

15

-

-

... More
Bottom

18.48

-

-

... More
Brick work with modular fly-ash lime bricks (FLAG Bricks) confirming to IS: 12894-2002 of claa designation 40 in

-

-

-

... More
Cement Mortar 1:6 (1 Cement : 6 Coarse Sand)

-

-

-

... More
Brick Solling

1.86

-

-

... More
Upto Plinth

5.59

-

-

... More
Compound Wall

33.55

-

-

... More
Extra for brick work in superstructure above plinth level for every floor or part thereof in addition to rate for foundation and plinth:

-

-

-

... More
Compound Wall

33.55

-

-

... More
12mm thick cement plaster of mix:

-

-

-

... More
In Cement Mortar 1:5 (1 cement : 5 fine sand)

-

-

-

... More
Inside of Compound Wall

190

-

-

... More
Beam Bottom

9.57

-

-

... More
Beam Side

7.18

-

-

... More
15mm thick cement plaster on the rough side of single or half brick wall of mix:

-

-

-

... More
In Cement Mortar 1:5 (1 cement : 5 fine sand)

-

-

-

... More
Outside of Compound Wall

250

-

-

... More
Beam Side

7.18

-

-

... More
Beam Bottom

9.57

-

-

... More
Beam Top

40

-

-

... More
Painting exterior surface with ACRYLIC SMOOTH exterior paint of required shade as per manufacturer's specifications to give protective and decorative finish including cleaning washing of surface etc. complete with:

-

-

-

... More
On new work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)

-

-

-

... More
Area same as 12 mm Plaster, Item No. 11

220.61

-

-

... More
Area same as 15 mm Plaster, Item No. 12

320.61

-

-

... More
Providing and fixing in position impregnated fibre board confirming to IS: 1838 in expansion joints, including cost of primer, sealing compound all complete.

-

-

-

... More
25mm thick

2.28

1751

768

... More
Filling from available excavated stuff (Excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering with a lead upto 50 M. and lift upto 1.5 M.

-

-

-

... More
Excavation

138.95

-

-

... More
CC 1:4:8

6.58

-

-

... More
Volume up to g.L

20

-

-

... More
Net Qty.

112.37

7304

65

... More
Hence For 1.00 Mtr

-

6704

-

... More
Hence For 750.00 Mtr

-

5028000

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.