Chhattisgarh Housing Board Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

Chhattisgarh Housing Board - CGHB Tender

Civil And Construction
Building Construction
Opening Date29 May 2023
Closing Date8 Jun 2023
Tender Amount₹ 67,09,500 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
In all types of soils.

-

-

-

... More
Footing

270.81

-

-

... More
For Beam

-

-

-

... More
Horizontel

5.08

-

-

... More
Vertical

1.74

-

-

... More
Extra for every additional lift of 1.5 m or part thereof.

-

-

-

... More
All types of soils

-

-

-

... More
Footing

45.14

-

-

... More
Providing and filling in plinth with sand/ Crusher dust and hard moorum under floor in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, including dressing etc. complete.

-

-

-

... More
Under Floor

-

-

-

... More
footing

15.05

-

-

... More
for beam

-

-

-

... More
horizontal

2.54

-

-

... More
vertical

0.87

-

-

... More
Below Floor

-

-

-

... More
tahsil court

26.04

-

-

... More
nayab tahsildar

26.04

-

-

... More
office

12.6

-

-

... More
retiring room

12.6

-

-

... More
sdo court

26.04

-

-

... More
tahsil office

26.04

-

-

... More
record room

12.6

-

-

... More
malkhana

12.6

-

-

... More
najir room

12.6

-

-

... More
retiring room

12.6

-

-

... More
sdo court

26.04

-

-

... More
toilet

18

-

-

... More
toilet

7.8

-

-

... More
water room

4.2

-

-

... More
patwari room

12.6

-

-

... More
record room

12.6

-

-

... More
revenu inspector room

31.5

-

-

... More
entrance hall

22.26

-

-

... More
passage

53.76

-

-

... More
passage

13.02

-

-

... More
passage

15.96

-

-

... More
poarch

17.33

-

-

... More
Providing and laying nominal mix plain cement concrete with crushed stone aggregate using concrete mixer in all works upto plinth level excluding cost of form work.

-

-

-

... More
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size).

-

-

-

... More
Ground Floor

-

-

-

... More
Footing

22.57

-

-

... More
For Beam

-

-

-

... More
Horizontel

2.54

-

-

... More
Vertical

0.87

-

-

... More
Below Floor

-

-

-

... More
tahsil court

2.6

-

-

... More
nayab tahsildar

2.6

-

-

... More
office

1.26

-

-

... More
retiring room

1.26

-

-

... More
sdo court

2.6

-

-

... More
tahsil office

2.6

-

-

... More
record room

1.26

-

-

... More
malkhana

1.26

-

-

... More
najir room

1.26

-

-

... More
retiring room

1.26

-

-

... More
sdo court

2.6

-

-

... More
toilet

0.9

-

-

... More
toilet

0.78

-

-

... More
water room

0.42

-

-

... More
patwari room

1.26

-

-

... More
record room

1.26

-

-

... More
revenu inspector room

3.15

-

-

... More
entrance hall

2.23

-

-

... More
passage

5.38

-

-

... More
passage

1.3

-

-

... More
passage

1.6

-

-

... More
poarch

2.17

-

-

... More
Filling from available excavated stuff (Excluding rock) in trenches, plinth, sides of foundation etc. in each deposited layer by ramming and watering with

-

-

-

... More
For Footing (Total Excavated Earth)

277.63

-

-

... More
Deduct : PCC Work

25.98

-

-

... More
RCC Work

71.61

-

-

... More
Providing and laying design mix reinforced cement concrete with crushed graded stone aggregate 20mm nominal size using batching plant, transit mixer and concrete pump, in all works upto plinth level excluding cost of form work.

-

-

-

... More
M-20 Grade

-

-

-

... More
Ground Floor

-

-

-

... More
Footing

34.52

-

-

... More
Column upto Plinth

8.02

-

-

... More
For ground/plinth Beam

-

-

-

... More
tahsil court

0.99

-

-

... More
tahsil court

0.67

-

-

... More
nayab tahsildar room

0.99

-

-

... More
nayab tahsildar room

0.67

-

-

... More
office

0.48

-

-

... More
office

0.67

-

-

... More
retiring room

0.48

-

-

... More
retiring room

0.67

-

-

... More
sdo court

0.99

-

-

... More
sdo court

0.34

-

-

... More
tahsil office

0.99

-

-

... More
tahsil office

0.67

-

-

... More
record room

0.48

-

-

... More
record room

0.34

-

-

... More
malkhana

0.48

-

-

... More
malkhana

0.34

-

-

... More
najir room

0.48

-

-

... More
najir room

0.34

-

-

... More
retiring room

0.48

-

-

... More
retiring room

0.34

-

-

... More
sdo court

0.99

-

-

... More
sdo court

0.34

-

-

... More
toilet

1.2

-

-

... More
toilet

0.29

-

-

... More
urinal

0.22

-

-

... More
passage

0.24

-

-

... More
passage

0.17

-

-

... More
toilet

1.68

-

-

... More
water room

0.67

-

-

... More
water room

0.19

-

-

... More
patwari room

0.48

-

-

... More
patwari room

0.67

-

-

... More
record room

0.48

-

-

... More
revenu inspector room

0.67

-

-

... More
revenu inspector room

1.2

-

-

... More
entrance hall

0.42

-

-

... More
entrance hall

0.34

-

-

... More
passage

0.48

-

-

... More
projection

0.4

-

-

... More
poarch

0.42

-

-

... More
poarch

0.61

-

-

... More
column

16.99

-

-

... More
For Lintel Beam

-

-

-

... More
tahsil court

0.5

-

-

... More
tahsil court

0.34

-

-

... More
nayab tahsildar room

0.5

-

-

... More
nayab tahsildar room

0.17

-

-

... More
office

0.24

-

-

... More
office

0.17

-

-

... More
retiring room

0.24

-

-

... More
retiring room

0.17

-

-

... More
sdo court

0.5

-

-

... More
sdo court

0.17

-

-

... More
tahsil office

0.5

-

-

... More
tahsil office

0.34

-

-

... More
record room

0.24

-

-

... More
record room

0.17

-

-

... More
malkhana

0.24

-

-

... More
malkhana

0.17

-

-

... More
najir room

0.24

-

-

... More
najir room

0.17

-

-

... More
retiring room

0.24

-

-

... More
retiring room

0.17

-

-

... More
sdo court

0.5

-

-

... More
sdo court

0.17

-

-

... More
toilet

0.6

-

-

... More
toilet

0.14

-

-

... More
urinal

0.11

-

-

... More
passage

0.12

-

-

... More
passage

0.08

-

-

... More
toilet

0.6

-

-

... More
water room

0.34

-

-

... More
water room

0.1

-

-

... More
patwari room

0.24

-

-

... More
patwari room

0.17

-

-

... More
record room

0.24

-

-

... More
revenu inspector room

0.34

-

-

... More
revenu inspector room

0.6

-

-

... More
entrance hall

0.21

-

-

... More
entrance hall

0.17

-

-

... More
passage

0.24

-

-

... More
projection

0.2

-

-

... More
poarch

0.21

-

-

... More
poarch

0.3

-

-

... More
For Slab Beam

-

-

-

... More
tahsil court

0.99

-

-

... More
tahsil court

0.67

-

-

... More
nayab tahsildar room

0.99

-

-

... More
nayab tahsildar room

0.34

-

-

... More
office

0.48

-

-

... More
office

0.34

-

-

... More
retiring room

0.48

-

-

... More
retiring room

0.34

-

-

... More
sdo court

0.99

-

-

... More
sdo court

0.34

-

-

... More
tahsil office

0.99

-

-

... More
tahsil office

0.67

-

-

... More
record room

0.48

-

-

... More
record room

0.34

-

-

... More
malkhana

0.48

-

-

... More
malkhana

0.34

-

-

... More
najir room

0.48

-

-

... More
najir room

0.34

-

-

... More
retiring room

0.48

-

-

... More
retiring room

0.34

-

-

... More
sdo court

0.99

-

-

... More
sdo court

0.34

-

-

... More
toilet

2.4

-

-

... More
toilet

0.29

-

-

... More
urinal

0.22

-

-

... More
passage

0.24

-

-

... More
passage

0.17

-

-

... More
toilet

1.2

-

-

... More
water room

0.67

-

-

... More
water room

0.19

-

-

... More
patwari room

0.48

-

-

... More
patwari room

0.34

-

-

... More
record room

0.48

-

-

... More
revenu inspector room

0.67

-

-

... More
revenu inspector room

1.2

-

-

... More
entrance hall

0.42

-

-

... More
entrance hall

0.34

-

-

... More
passage

0.48

-

-

... More
projection

0.4

-

-

... More
poarch

0.42

-

-

... More
poarch

0.61

-

-

... More
RCC Of Slab

46.51

-

-

... More
poarch

3.6

-

-

... More
Extra for laying PCC/RCC of any grade in superstructure above plinth level for every floor or part thereof in addition to rate for foundation and plinth:

-

-

-

... More
Above Plinth

124.87

12174

97.5

... More
Providing and fixing form work including centring, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:

-

-

-

... More
Foundations, footings, bases of columns plinth beam, curtain wall in any shape and size and all type of wall below plinth level.

-

-

-

... More
Footing

46.02

-

-

... More
For Ground Beam

-

-

-

... More
tahsil court

9.92

-

-

... More
tahsil court

6.72

-

-

... More
nayab tahsildar room

9.92

-

-

... More
nayab tahsildar room

6.72

-

-

... More
office

4.8

-

-

... More
office

3.36

-

-

... More
retiring room

4.8

-

-

... More
retiring room

3.36

-

-

... More
sdo court

9.92

-

-

... More
sdo court

3.36

-

-

... More
tahsil office

9.92

-

-

... More
tahsil office

6.72

-

-

... More
record room

4.8

-

-

... More
record room

3.36

-

-

... More
malkhana

4.8

-

-

... More
malkhana

3.36

-

-

... More
najir room

4.8

-

-

... More
najir room

3.36

-

-

... More
retiring room

4.8

-

-

... More
retiring room

3.36

-

-

... More
sdo court

9.92

-

-

... More
sdo court

3.36

-

-

... More
toilet

12

-

-

... More
toilet

2.88

-

-

... More
urinal

2.16

-

-

... More
passage

2.4

-

-

... More
passage

1.68

-

-

... More
toilet

12

-

-

... More
water room

6.72

-

-

... More
water room

1.92

-

-

... More
patwari room

4.8

-

-

... More
patwari room

3.36

-

-

... More
record room

4.8

-

-

... More
revenu inspector room

6.72

-

-

... More
revenu inspector room

12

-

-

... More
entrance hall

8.48

-

-

... More
entrance hall

3.36

-

-

... More
passage

4.8

-

-

... More
projection

4

-

-

... More
poarch

4.24

-

-

... More
poarch

6.08

-

-

... More
Columns, Pillars, Piers and likes- rectangular or square in shape

-

-

-

... More
Column

84.96

-

-

... More
Beams, lintels, cantilevers & walls

-

-

-

... More
Above Plinth

-

-

-

... More
For Lintel Beam

-

-

-

... More
tahsil court

4.96

-

-

... More
tahsil court

3.36

-

-

... More
nayab tahsildar room

4.96

-

-

... More
nayab tahsildar room

1.68

-

-

... More
office

2.4

-

-

... More
office

1.68

-

-

... More
retiring room

2.4

-

-

... More
retiring room

1.68

-

-

... More
sdo court

4.96

-

-

... More
sdo court

1.68

-

-

... More
tahsil office

4.96

-

-

... More
tahsil office

3.36

-

-

... More
record room

2.4

-

-

... More
record room

1.68

-

-

... More
malkhana

2.4

-

-

... More
malkhana

1.68

-

-

... More
najir room

2.4

-

-

... More
najir room

1.68

-

-

... More
retiring room

2.4

-

-

... More
retiring room

1.68

-

-

... More
sdo court

4.96

-

-

... More
sdo court

1.68

-

-

... More
toilet

6

-

-

... More
toilet

1.44

-

-

... More
urinal

1.08

-

-

... More
passage

1.2

-

-

... More
passage

0.84

-

-

... More
toilet

6

-

-

... More
water room

3.36

-

-

... More
water room

0.96

-

-

... More
patwari room

2.4

-

-

... More
patwari room

1.68

-

-

... More
record room

2.4

-

-

... More
revenu inspector room

3.36

-

-

... More
revenu inspector room

6

-

-

... More
entrance hall

2.12

-

-

... More
entrance hall

1.68

-

-

... More
passage

2.4

-

-

... More
projection

2

-

-

... More
poarch

2.12

-

-

... More
poarch

3.04

-

-

... More
For slab Beam

-

-

-

... More
tahsil court

9.92

-

-

... More
tahsil court

6.72

-

-

... More
nayab tahsildar room

9.92

-

-

... More
nayab tahsildar room

3.36

-

-

... More
office

4.8

-

-

... More
office

3.36

-

-

... More
retiring room

4.8

-

-

... More
retiring room

3.36

-

-

... More
sdo court

9.92

-

-

... More
sdo court

3.36

-

-

... More
tahsil office

9.92

-

-

... More
tahsil office

6.72

-

-

... More
record room

4.8

-

-

... More
record room

3.36

-

-

... More
malkhana

4.8

-

-

... More
malkhana

3.36

-

-

... More
najir room

4.8

-

-

... More
najir room

3.36

-

-

... More
retiring room

4.8

-

-

... More
retiring room

3.36

-

-

... More
sdo court

9.92

-

-

... More
sdo court

3.36

-

-

... More
toilet

12

-

-

... More
toilet

2.88

-

-

... More
urinal

2.16

-

-

... More
passage

2.4

-

-

... More
passage

1.68

-

-

... More
toilet

12

-

-

... More
water room

6.72

-

-

... More
water room

1.92

-

-

... More
patwari room

4.8

-

-

... More
patwari room

3.36

-

-

... More
record room

4.8

-

-

... More
revenu inspector room

6.72

-

-

... More
revenu inspector room

12

-

-

... More
entrance hall

4.24

-

-

... More
entrance hall

3.36

-

-

... More
passage

4.8

-

-

... More
projection

4

-

-

... More
poarch

4.24

-

-

... More
poarch

6.08

-

-

... More
Suspended floors, roofs, access Kitchen Platform, balconies (plain surfaces) and shelves (cast in situ)

-

-

-

... More
outer projection

42.3

-

-

... More
outer projection

14.5

-

-

... More
Below Floor

-

-

-

... More
tahsil court

26.04

-

-

... More
nayab tahsildar

26.04

-

-

... More
office

12.6

-

-

... More
retiring room

12.6

-

-

... More
sdo court

26.04

-

-

... More
tahsil office

26.04

-

-

... More
record room

12.6

-

-

... More
malkhana

12.6

-

-

... More
najir room

12.6

-

-

... More
retiring room

12.6

-

-

... More
sdo court

26.04

-

-

... More
toilet

18

-

-

... More
toilet

7.8

-

-

... More
water room

4.2

-

-

... More
patwari room

12.6

-

-

... More
record room

12.6

-

-

... More
revenu inspector room

31.5

-

-

... More
entrance hall

22.26

-

-

... More
passage

53.76

-

-

... More
passage

13.02

-

-

... More
passage

15.96

-

-

... More
poarch

21.66

-

-

... More
outer projection

8.46

-

-

... More
Weather shade, chhajja, Cornices and mouldings

-

-

-

... More
chajja

42.3

-

-

... More
chajja front

8.46

-

-

... More
chajja side

0.2

-

-

... More
chajja

12.3

-

-

... More
chajja front

2.46

-

-

... More
chajja side

0.2

-

-

... More
chajja

9

-

-

... More
chajja front

3.6

-

-

... More
chajja side

0.6

-

-

... More
Providing and placing in position reinforcement for R.C.C. work including straightening, cutting, bending, binding etc. complete as per drawings including cost of binding wire in foundation and plinth all complete:

-

-

-

... More
Thermo-Mechanically treated bars FE 415 (Make:- Tata / Sail / Goel /Jindal /Gk or Equivalent)

-

-

-

... More
Qty. of R.C.C. M 20

24257.78

1322048

54.5

... More
Providing and laying damp proof course (upto 50mm thick) with plain cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded crushed stone aggregate 20mm nominal size) including form work.

-

-

-

... More
outer wall

0.85

-

-

... More
outer wall

0.29

-

-

... More
outer wall

0.12

-

-

... More
outer wall

0.08

-

-

... More
Brick work with modular fly-ash lime bricks (FaLG Bricks) confirming to IS:12894-2002 of class designation 4.0 in foundation and plinth in:

-

-

-

... More
Cement Mortar 1:5 (1 cement : 5 coarse sand)

-

-

-

... More
Below Beam

-

-

-

... More
outer wall

16.92

-

-

... More
outer wall

5.8

-

-

... More
outer wall

2.36

-

-

... More
outer wall

1.52

-

-

... More
Brick work with modular fly-ash lime bricks (FaLG Bricks) confirming to IS:12894-2002 of class designation 4.0 in foundation and plinth in:

-

-

-

... More
Cement Mortar 1:6 (1 cement : 6 coarse sand)

-

-

-

... More
tahsil court

7.44

-

-

... More
tahsil court

5.04

-

-

... More
nayab tahsildar room

7.44

-

-

... More
nayab tahsildar room

2.52

-

-

... More
office

3.6

-

-

... More
office

2.52

-

-

... More
retiring room

3.6

-

-

... More
retiring room

2.52

-

-

... More
sdo court

7.44

-

-

... More
sdo court

2.52

-

-

... More
tahsil office

7.44

-

-

... More
tahsil office

5.04

-

-

... More
record room

3.6

-

-

... More
record room

2.52

-

-

... More
malkhana

3.6

-

-

... More
malkhana

2.52

-

-

... More
najir room

3.6

-

-

... More
najir room

2.52

-

-

... More
retiring room

3.6

-

-

... More
retiring room

2.52

-

-

... More
sdo court

7.44

-

-

... More
sdo court

2.52

-

-

... More
toilet

18

-

-

... More
toilet

2.16

-

-

... More
urinal

1.62

-

-

... More
passage

1.8

-

-

... More
passage

1.26

-

-

... More
toilet

12.6

-

-

... More
water room

5.04

-

-

... More
water room

1.44

-

-

... More
patwari room

3.6

-

-

... More
patwari room

2.52

-

-

... More
record room

3.6

-

-

... More
revenu inspector room

5.04

-

-

... More
revenu inspector room

9

-

-

... More
entrance hall

3.18

-

-

... More
entrance hall

2.52

-

-

... More
passage

3.6

-

-

... More
projection

3

-

-

... More
poarch

3.18

-

-

... More
poarch

4.56

-

-

... More
Deduction of opening

-

-

-

1.01

-

-

... More
Side Gate

0.88

-

-

3.78

-

-

3.02

-

-

1.68

-

-

1.44

-

-

6.34

-

-

0.43

-

-

0.27

-

-

... More
Hence the nett oty

162.7

530877

3263

... More
Extra for brick work in superstructure above plinth level for every floor or part thereof in addition to rate for foundation and plinth:

-

-

-

... More
Half brick thick brick masonry with fly-ash lime bricks (FaLG Bricks) confirming to IS:12894-2002 of class designation 4.0 in superstructure above plinth level upto plinth level:

-

-

-

... More
Cement Mortar 1:4 (1 cement : 4 coarse sand)

-

-

-

... More
10 cm wall

14.4

-

-

... More
Extra for half brick work in superstructure above plinth level for every story or part thereof in addition to rate for upto plinth level:

44.28

487

11

... More
Extra for providing and placing in position hopping 25x1.60 mm or 2 Nos 6mm dia MS bars reinforcement at every third course of half brick masonry.

44.28

2767

62.5

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames wrought framed and fixed in position.

-

-

-

... More
Sal, bijasal, benteak, khair, haldu

-

-

-

... More
door frame

-

-

-

... More
Providing and fixing commercial grade water proof ply for wall paneling on wooden frame with necessary nails complete as required.

-

-

-

37.8

46531

1231

... More
Providing and fixing powder coated M.S. sliding door bolts with bolts, nuts and necessary iron screws

-

-

-

... More
300x16mm

20

2700

135

... More
Providing and fixing powder coated M.S. tower bolts (Barrel type) with necessary iron screws:

-

-

-

... More
250x10mm

20

850

42.5

... More
Providing and fixing powder coated M.S. handles with necessary iron screws:

-

-

-

40

2460

61.5

... More
Providing and fixing powder coated MS hanging door stopper with necessary powder coated MS steel screws complete.

30

450

15

... More
Providing and fixing in position doors, windows and ventilators frames made of cold rolled pressed steel sheet framed profiles made from commercial M.S. Sheets conforming to I.S. 513 of 1973 and as per general specifications of I.S 4351 including hinges jamb, lock jamb, steel butt hinges, base tie, joints mitred and welded with 10cm long legs of size 15x3mm M.S. flat, embedded in cement concrete blocks 15x10x10cm size of grade M-10 or rawl plugs and screws or with fixing clips or with bolts and nuts including neatly compacted filling M-10 cement concrete inprofile section applying a priming coat of red oxide zinc chromate primer.

-

-

-

... More
Double rebate 115mmx50mm size, 1.6mm thick sheet

43.2

-

-

88.4

-

-

35

-

-

166.6

87964

528

... More
Providing and fixing flush door shutters, conforming to IS : 2202 (Part-I), decorative type core of block board construction with frame of first class hard wood and well matched teak ply veneering with vertical grains or cross bands and face veneers on both faces of shutters excluding hinges. (Make:- Green Board/ National/ Centuary or Equivalent)

-

-

-

... More
35 mm. thick (single leaf)

-

-

-

17.28

-

-

31.2

-

-

... More
Providing and fixing M.S. grill of approved pattern made of M.S. flats or square or round bars welded to steel frame of windows etc. including applying a priming coat welded to frame with all necessary fitting complete including applying a priming of red oxide zinc chromate primer.

-

-

-

792

-

-

54

-

-

27

-

-

144

-

-

... More
Providing and fixing factory made UPVC door frame made of UPVC profile section having an overall dimension as below (tolerance ± 1mm) with wall thickness 2.0mm ± 0.2mm, corners of the door frame to be jointed with galvanized brackets and stainless steel screws, joints mitred and plastic welded. The hinge side vertical of the frames reinforced by galvanized M.S. tube of size 19 X 19mm and 1mm ± 0.1mm wall thickness and 3 nos. stainless steel hinges fixed to the frame complete as per manufacturers specification and direction of Engineer-in-charge

11.76

2304

196

... More
Providing and fixing factory made 25mm thick PVC flush door shutters made out of a one piece Multi chamber extruded PVC section of the size of 762mm X 25mm or less as per requirement with an average wall thickness of 1mm ± 0.3mm. PVC foam end cap of size 23x10mm are provided on both vertical edges to ensure the overall thickness of 25mm. An M.S. tube having dimensions 19mm x 19mm is inserted along the hinge side of the door. Core of the door shutter should be filled with High Density Polyurethane foam. The Top & Bottom edges of the shutter are covered with an end-cap of the size 25mm X 11mm. Door shutter shall be reinforced with special polymeric reinforcements as per manufactures' specification.

11.76

30376

2583

... More
Providing and fixing double glazed hermetically sealed glazing in aluminium windows, ventilators and partition etc. with 6 mm thick clear float glass both side having 12 mm air gap including providing EPDM gasket, perforated aluminium spacers, desiccants, sealant (Both primary and secondary sealant) etc. complete.

-

-

-

39.6

-

-

2.7

-

-

... More
Providing and fixing stainless wire gauge of average width of aperture 1.56mm with wire of 0.35mm to existing steel door, window shutter frames with necessary M.S. strip beading etc. complete.

-

-

-

39.6

-

-

2.7

-

-

6.3

-

-

... More
Providing and fixing chicken mesh weighting not less than 250 gms/sqm as per IS : specification in the required width with 40mm long steel nails on vertical and horizontal surface near R.C.C. and brick walls junctions including scaffolding and all lead and lifts etc. complete before plastering upto 10mts in height.

-

-

-

80

-

-

... More
Column

247.8

-

-

... More
Providing and laying vitrified floor tiles with double charge/ multi charge (minimum 2.0 mm thick layer) with water absorption less than 0.5% and conforming to IS : 15622 of approved make in all colours and shades and size mentioned below (+/- 10mm), laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete.

-

-

-

... More
Size 600x600mm thickness 9 to 10 mm

-

-

-

... More
tahsil court

26.04

-

-

... More
nayab tahsildar

26.04

-

-

... More
office

12.6

-

-

... More
retiring room

12.6

-

-

... More
sdo court

26.04

-

-

... More
tahsil office

26.04

-

-

... More
record room

12.6

-

-

... More
malkhana

12.6

-

-

... More
najir room

12.6

-

-

... More
retiring room

12.6

-

-

... More
sdo court

26.04

-

-

... More
toilet

9

-

-

... More
toilet

7.8

-

-

... More
water room

4.2

-

-

... More
patwari room

12.6

-

-

... More
record room

12.6

-

-

... More
revenu inspector room

31.5

-

-

... More
entrance hall

22.26

-

-

... More
passage

53.76

-

-

... More
passage

13.02

-

-

... More
passage

15.96

-

-

... More
Chequered terrazzo tiles 22 mm thick with graded marble chips of size upto 6mm in floors on 25mm thick bed of cement mortar 1:6 (1 cement : 6 coarse sand) jointed with neat cement slurry mixed with pigment to match the shade of tiles including grinding rubbing and polishing complete.

-

-

-

... More
Medium shade using approximately. 50% white cement and 50% ordinary cement

24

-

-

... More
Providing and fixing rectified glazed ceramic tiles of 1st quality conforming to IS : 15622-2017 of approved make,in colours, shades over 20 mm thick bed of cement Mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with matching pigment complete.

-

-

-

... More
Size 300x300mm thickness 7 to 8 mm

-

-

-

... More
Providing and fixing rectified glazed ceramic wall/dado tiles of 1st quality conforming to IS : 15622-2017 of approved make,in colours, shades on wall /dado over 12 mm thick bed of cement Mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with matching pigment complete.

-

-

-

... More
Size 300x450mm thickness 7 to 8 mm

-

-

-

... More
Providing and making 6mm thick cement plaster of mix:

-

-

-

... More
In Cement mortar 1:4 (1 cement : 4 fine sand)

-

-

-

... More
Shuttering of suspended floor

489.52

-

-

... More
chajja shuttering

79.12

-

-

... More
Providing and making 12mm thick cement plaster of mix:

-

-

-

... More
In Cement Mortar 1:5 (1 cement : 5 fine sand)

-

-

-

... More
tahsil court

44.64

-

-

... More
tahsil court

30.24

-

-

... More
nayab tahsildar room

44.64

-

-

... More
nayab tahsildar room

15.12

-

-

... More
office

21.6

-

-

... More
office

15.12

-

-

... More
retiring room

21.6

-

-

... More
retiring room

15.12

-

-

... More
sdo court

44.64

-

-

... More
sdo court

15.12

-

-

... More
tahsil office

44.64

-

-

... More
tahsil office

30.24

-

-

... More
record room

21.6

-

-

... More
record room

15.12

-

-

... More
malkhana

21.6

-

-

... More
malkhana

15.12

-

-

... More
najir room

21.6

-

-

... More
najir room

15.12

-

-

... More
retiring room

21.6

-

-

... More
retiring room

15.12

-

-

... More
sdo court

43.92

-

-

... More
sdo court

15.12

-

-

... More
toilet

108

-

-

... More
toilet

12.96

-

-

... More
urinal

9.72

-

-

... More
passage

10.8

-

-

... More
passage

7.56

-

-

... More
toilet

54

-

-

... More
water room

30.24

-

-

... More
water room

8.64

-

-

... More
patwari room

21.6

-

-

... More
patwari room

15.12

-

-

... More
record room

21.6

-

-

... More
revenu inspector room

30.24

-

-

... More
revenu inspector room

54

-

-

... More
entrance hall

19.08

-

-

... More
entrance hall

15.12

-

-

... More
passage

21.6

-

-

... More
projection

18

-

-

... More
poarch

19.08

-

-

... More
poarch

27.36

-

-

... More
Deduction

-

-

-

5.04

-

-

... More
Side Gate

4.41

-

-

15.12

-

-

18.9

-

-

8.4

-

-

7.2

-

-

31.68

-

-

2.16

-

-

1.35

-

-

... More
Hence the nett qty

959.1

-

-

... More
Total 12mm Plaster

959.1

87757

91.5

... More
Providing and making 15mm thick cement plaster on the rough side of single or half brick wall of mix:

-

-

-

... More
In Cement Mortar 1:5 (1 cement : 5 fine sand)

-

-

-

... More
tahsil court

44.64

-

-

... More
tahsil court

30.24

-

-

... More
nayab tahsildar room

44.64

-

-

... More
nayab tahsildar room

15.12

-

-

... More
office

21.6

-

-

... More
office

15.12

-

-

... More
retiring room

21.6

-

-

... More
retiring room

15.12

-

-

... More
sdo court

44.64

-

-

... More
sdo court

15.12

-

-

... More
tahsil office

44.64

-

-

... More
tahsil office

30.24

-

-

... More
record room

21.6

-

-

... More
record room

15.12

-

-

... More
malkhana

21.6

-

-

... More
malkhana

15.12

-

-

... More
najir room

21.6

-

-

... More
najir room

15.12

-

-

... More
retiring room

21.6

-

-

... More
retiring room

15.12

-

-

... More
sdo court

44.64

-

-

... More
sdo court

15.12

-

-

... More
toilet

108

-

-

... More
toilet

12.96

-

-

... More
urinal

9.72

-

-

... More
passage

10.8

-

-

... More
passage

7.56

-

-

... More
toilet

54

-

-

... More
water room

30.24

-

-

... More
water room

8.64

-

-

... More
patwari room

21.6

-

-

... More
patwari room

15.12

-

-

... More
record room

21.6

-

-

... More
revenu inspector room

30.24

-

-

... More
revenu inspector room

54

-

-

... More
entrance hall

19.08

-

-

... More
entrance hall

15.12

-

-

... More
passage

21.6

-

-

... More
projection

18

-

-

... More
poarch

19.08

-

-

... More
poarch

27.36

-

-

84.6

-

-

8.26

-

-

... More
Total 15mm Plaster

1181.26

126394

107

... More
Providing and applying 2mm thick ready mix exterior grade approved make putty (like Birla wall care, Alltek Superfine W/R of (NCL), Asian, ICI, Nerolac, J.K. wall putty) on walls to make the surface smooth and even.

-

-

-

... More
As per 6mm Plaster

568.64

-

-

... More
As per 12mm Plaster

959.1

-

-

... More
As per 15mm Plaster

1181.26

-

-

... More
Distempering with acrylic washable distemper to give an even shade.

-

-

-

... More
On new work (Two or more coats

-

-

-

... More
As per 6mm Inner Plaster

489.52

-

-

... More
As per 12mm Plaster

959.1

-

-

... More
Total

1448.62

55047

38

... More
Painting exterior surface with ACRYLIC SMOOTH exterior paint of required shade as per manufacturer's specifications to give protective and decorative finish including cleaning washing of surface etc. complete with:

-

-

-

... More
On new work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)

-

-

-

... More
As per 15mm Plaster

1181.26

66150

56

... More
Painting on new work (two or more coats) to give an even shade with:

-

-

-

... More
Satin synthetic enamel paint

-

-

-

22.68

-

-

... More
SIDE GATE

19.85

-

-

68.04

-

-

122.85

-

-

7.2

-

-

102.96

-

-

7.02

-

-

1.35

-

-

... More
Applying cement slurry on R.C.C. slab or cement concrete work using 2.75 kg/ sqm for receiving cement concrete floor including roughening cleaning etc complete.

-

-

-

... More
Providing Water proofing treatment over Roof, Wall, Chhajjas, Balcony with Diamond Shield and Sealer coat or equivalent at leakage/ seepage area consisting of the operation

-

-

-

... More
(i) Surface preparation roughening of surface, opening of cracks in ‘V’ groove in size of 5mm x 10m (WxD), filling of cracks with putty of Diamond shield with laying fiber glass mesh, Cleaning of surface by scrubbing with steel wire/ Nylon brush. Removing all dust particles and washing with adequate water to clean completely

-

-

-

... More
(ii) Providing and applying 1st coat of diamond shield or equivalent compound (having two component dry powder 80% Chemical 20% (chemical having 30% solid contents) making flexible waterproof and protective modified mortar with minimum thickness 70-80 micron after proper mixing of both the parts of compound along with laying of fiber glass mesh (of weaving size of 10x10 yarn/inch duly coated with alkaline resistant polymer). Allow the coating to set in natural air for minimum 2 Hrs. After 1st coat apply 2nd coat with minimum thickness 100 micron of the same compound. Allow the 2nd coat to set in natural air for minimum 4 Hrs. Total consumption of the diamond shield or equivalent in both coat should be @ 17.90 kg for 10sqm area.

-

-

-

... More
poarch

28.81

-

-

... More
WATERSUPPLY AND SANITARY WORK WORK

-

-

-

... More
Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank

2000

14600

7.3

... More
Providing and fixing in position G.I B Class pipe line best Indian make complete with fittings, except controls such as cocks and valves fitted and fix to the walls with G.I approved clamps at any floor or buried under ground including making necessary chases and holes in walls and floors or trenching etc. complete with making good or refilling including painting of pipes.

-

-

-

... More
15 mm dia

20

2980

149

... More
20 mm dia

30

5550

185

... More
25 mm dia

45

11610

258

... More
Providing and fixing on wall face or under floor UV stabilized Unplasticised Rigid PVC pipes (single socketed) having 3.2mm wall thickness conforming to IS : 13592 (4kg/sqcm) including required couplers, jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion etc complete. a. 75mm dia Make: (Supreme/Finolex)

-

-

-

... More
75mm dia pipe

20

3640

182

... More
110mm dia pipe

30

8010

267

... More
Providing and fixing on wall face or under floor UV stabilized Unplasticised Rigid PVC pipes (single socketed) having 3.2mm wall thickness conforming to IS : 13592 (4kg/sqcm) including required couplers, jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion etc complete.

-

-

-

... More
Tee/ Tee with door/ Bend 45°/ Bend 90°

-

-

-

5

565

113

6

924

154

... More
Double "Y" with or without door

-

-

-

5

645

129

6

1344

224

... More
Vent cowel

-

-

-

5

220

44

... More
"P" trap 110mmx110mm long

7

1589

227

... More
Providing and fixing water closet squatting pan (Indian type W.C. pan ), 100mm sand cast Iron P or S trap, 10 litre low level P.V.C. flushing cistern (same colour) conforming to IS : 7231, with flush bend and other fittings and fixtures complete including cutting and making good the walls and floors wherever required :

-

-

-

... More
White Orissa pattern W.C. pan of size 580x440 mm

7

20293

2899

... More
Providing and fixing vitreous china water closet (European type W.C. pan) with white ISI marked plastic seat and lid, 10 litre low level white P.V.C. flushing cistern (same colour), conforming to IS : 7231, with all fittings and fixtures complete including cutting and making good the walls and floors wherever required :

-

-

-

... More
White wall hung type

1

4415

4415

... More
Providing and fixing vitreous china wash basin with C.I. brackets, 32 mm C.P. brass waste of standard pattern, including painting of brackets, cutting and making good the walls wherever required :

-

-

-

... More
i) Flat Back (White) - 550X400 mm

7

10010

1430

... More
Providing and fixing flexible P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete.

-

-

-

... More
32 mm dia

7

479

68.5

... More
Providing and fixing 15 mm nominal bore Brass bib/stop cock of approved quality:

-

-

-

... More
Stop cock (350 grams)

20

4740

237

... More
Providing and fixing 15 mm nominal bore C.P. brass fittings of approved make and conforming to IS:8931 including C.P. brass extension if required:

-

-

-

... More
Piller Cock (400 grams)

10

3980

398

... More
Soap dish plate

3

489

163

... More
Towel rail (600mm long x 20mm dia)

7

2366

338

... More
Providing and fixing stainless steel drain jali of approved make/quality.

10

510

51

... More
Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing

-

-

-

... More
5 mm thick mirror

6.3

12700

2016

... More
Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) all-round S.W. pipes including bed concrete 150mm thick as per standard design

-

-

-

... More
100 mm diameter S.W. pipe

20

7140

357

... More
Providing and constructing brick masonry road gully chamber 50x45x60 cm with well burnt modular clay bricks crushing strength not less than 35kg/cm2 in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm precast R.C.C. horizontal grating with frame complete as per standard design.

4

11488

2872

... More
Providing and constructing soak pit 1.20x1.20x1.20m filled with brickbats including S.W. drain pipe 100 mm diameter and 1.20 m long complete as per standard design.

1

1709

1709

... More
Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2mm and braced with flat iron diagonals 20x5mm size with top and bottom rails of T-iron 40x40x6mm with 38mm steel pulleys complete with bolts, nuts, locking arrangement stoppers, handles including applying a priming coat of red oxide zinc chromate primer.

-

-

-

... More
main gate

5.76

-

-

2.88

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.