E-tender For Ofc Construction Work
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BSNL_200466_1Bid Award Id
ViewTender No
E-Tender for OFC construction work for New OFC routes in Bastar BATender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://bsnl.co.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
E-Tender for OFC construction work for New OFC routes in Bastar BA
BOQ Items
Z (Rocky-Hard Rocky)
-
-
-
Laying of PLB Pipe coupled with sockets (laying PLB pipe coils of any length including the fixing of couplers)
41200
-
5.18
Horizontal Boring at a depth of 1.65 mtrs. for crossing Road/Railway track inserting 65/40 dia G.I. Pipes and pushing PLB pipe inside.
-
-
-
Laying and fixing of G.I. Pipes in tranches with PLB Pipe inside (Laying and fixing of G.I.PLB Pipes of any size and pushing of PLB pipe/Pipes in tranches including the tightening of GI Couplers.
40
-
12.08
Laying & fixing of GI Pipes on bridges and Culverts with PLB inside (Laying of GI Pipe & pushing PLB pipe inside laying GI Pipe of any size on bridges and Culverts including the fixing & tightening of GI couplers)
80
-
31.05
Laying Fixing and sealing of full round RCC pipes in trenches with PLB pipe inside (Laying RCC pipes of any size Fixing & Fitting of RCC collars )
80
-
20.7
Providing concrete Protection at Site to PLB/G.I/DWC. Pipes reinforced by Weld Mesh RCC 1:2:4 as per specification given in tender document.
80
-
6741
Providing retaining wall at required places as per specification
-
-
2563
Splicing and termination of Optical Fiber Cable
-
-
-
Up to 48F
21
-
4730
Up to 96 F
-
-
6622
Up to 288 F
-
-
7946
Digging of pit for jointing chamber, construction of brick Chamber and filling of brick chamber with clean sand, supply and placing of Pre-cast RCC Slabs on brick chamber, and back filling of jointing pit.
-
-
4950
Digging of pit for jointing chamber, Fixing of Pre-cast RCC chamber, filling of joint chamber with clean sand,Supply and placing of pre-caste RCC slabs on joint chamber, and backfilling of jointing pit.
21
-
1650
Digging of pit 1 meter towards jungle side on each manhole/joint chamber for fixing of route/joint indicator with base concreting as per specification, painting and sign writing of route/joint indicators.
1
-
330
Clamping of PLB pipe inside GI/DWC Pipes along bridges/ culvert (Specifications will be provided by BSNL)
-
-
-
Clamping which requires drilling of holes along the retention wall
-
-
110
Clamping which does not requires drilling of holes along the retention wall
-
-
34.5
Laying of 63/50 mm DWC pipe with PLB pipe inside
120
-
8.25
Laying of DWC pipes bigger size than 63/50 mm with PLB pipe inside
-
-
10.35
Laying half round pipes around (top and bottom ) of PLB pipes
4000
-
6.61
Documentation (6 copies of documents for each route/section = one set) along with CD (soft copy)
1
-
4500
Recovery empty cable drum
20
-
-495
Supply of Ferro cement joint box set
21
-
3960
Supply of RCC Route/Joint indicator with installation
200
-
396
Cable Pulling Work / Cable Blowing/ De- Blowing (Opening of Manholes, Pulling of O.F. Cable, Sealing of PLB pipes in Manholes by Rubber Bushes and providing PLB/RCC Split Pipes in manholes / Back filing of Manholes.
-
-
-
Up to 48 OF Cable
42000
-
12.94
96 F OF Cable
-
-
16.17
288 F OF Cable
-
-
19.4
Sub- ducting in 110 mm pre laid duct with 3 Nos. of 40 mm PLB pipe, dewatering of Manholes, Cleaning of pre laid 110 mm pipe by rotating mandrill, closing the opening of Manholes properly, Sealing of ends of PLB ducts by sealing plugs and replacing existing PP Ropes for ensuring smooth passage for pulling OF Cable.
-
-
8.25
Fabrication and fixing with drilling of MS Clamps made out of flat/angles with necessary nuts/bolts/washers and associated accessories, duly painted with genuine paint over Red oxide, as per required specification and suitable design for fixing pipe along the parapet of Bridges/Culverts and supply at site.
-
-
132
FRP Man Hole installation work : Excavation of FRP manhole pit (1.5mx1.5mx1.5m)providing 6 inch in thick 1:2:4 Cement concrete base installation of FRP Manhole and refilling of pit up to road level with concreting .
-
-
5445
Micro trenching & Backfilling with RCC (1:2:4)
-
-
235