Municipal Corporation Tender

View complete overview of Chandigarh Municipal Corporation Tender

Municipal Corporation Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date25 Nov 2023
Closing Date1 Dec 2023
Tender Amount₹ 9,44,498 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Prov and laying of 6 inch DI w/s pipe line in lieu of old rusted/damaged existing 6 inch CI w/s pipe line in front of Luxmi Narayan Mandir to Post Office, Sector 20-C, Chandigarh under the jurisdiction of SDE, MCPH Sub Division No.16 Chd
Financial document
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing push-on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and the cost of rubber gasket : 150 mm dia pipes as per DSR item no.18.70

58

6670

115

... More
Providing and fixing of CI/DI specials ISI marked including cost of nut bolt, rubber sheet, pig lead, hemp yarn , fuel, cutting etc. complete in all respects. (i) Tail piece 6”i/d (S/F)

2

6240

3120

... More
Tail piece 6”i/d (F/P)

2

5520

2760

... More
Collar 6” i/d

2

6720

3360

... More
Tee 6” x6”x6” i/d (A/F)

2

11280

5640

... More
Tail piece 10” i/d (F/P)

1

6360

6360

... More
Collar 10” i/d

1

6600

6600

... More
Reducer 10” x 6” i/d

1

4840

4840

... More
Providing and fixing of 150mm dia DI sluice valve (with cap)ISI marked including cost of rubber packing, nut & bolts, carriage, loading unloading complete in all respects make VAG/ AVK / IVC/ Kirloskar/ Sigmaflow.

1

17544

17544

... More
Construction of brick masonry chamber for sluice valve & scouring including excavation 1st class brick work in cement sand mortar 1.6 cement conc. 1:5:10 complete in all respects. Internal size 3’X3’X4’(inner)

1

10800

10800

... More
Providing and fixing of RCC cover 1:2:4 of 3” thickness of complete in all respects. (each cover in two parts)

20.25

2632

130

... More
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.

192

182400

950

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m as per DSR itemNo.2.25

32.75

4847

148

... More
Carriage of materials by mechanical transport including loading, unloading and stacking of earth upto 3km as per DSR item no.1.1.2.

38.4

6432

167.5

... More
Extra for cutting through, metalled road and stacking the material outside complete in all respect.

96

14208

148

... More
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. As per DSR Item no.16.83

96

7200

75

... More
Labour for making arrangement for connection with existing line including cost of excavation, dewatering, cutting, alignment, dewatering etc. complete in all respects. 10” i/d to 6” i/d

1

4200

4200

... More
6” i/d to 6” i/d

1

3500

3500

... More
Note:- (i)Less against C l Scrap @Rs. 25/ Per Kg (ii)If JCB will be provided by Deptt. (Govt. JCB) in repair work then recovery will be made @Rs.850/-Hr

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.