Military Engineer Services Tender

View complete overview of Chandigarh MES Tender

Military Engineer Services - MES Tender

Works
Paints and Enamels
Eprocure
Opening Date23 May 2025
Closing Date13 Jun 2025
Tender Amount₹ 45,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Brick work with sub-class `B' bricks, straight or curved on plan exceeding 6 M mean radius (except bricks) built in cement sand mortar 1:6 complete in and including demolition of brickwork or stone boulder masonary built in cement mortar including all quoins, arches, pillars etc for area where servicable bricks retrived and removal of rubbish outside MoD land ,complete all as specified and as directed by Engineer -in-Charge. Note: Servicable bricks retrived from demolition of item No.01 ,02 and this item shall be used under this item after proper cleaning and washing of old bricks.

5

-

-

... More
Rendering 15 mm thick on fair faces of brick work or concrete surfaces in cement mortar 1:4 finished the surfcae even and smooth without using extra cement , complete all as specified and directed by Engineer-in-Charge.

200

-

-

... More
Rendering 15 mm thick on brick work or concrete surfaces in cement mortar 1:4 finished even and smooth without using extra cement in and including taking down cement plaster on brick walls & concrete surfaces & the like including raking out joints, hacking for key, scrubbing down with water etc., any description, and removal of rubbish outside MoD land , complete all as specified and directed by Engineer-in-Charge. Notes: (i).Quoted rate shall be deemed to include for necessary scaffolding & formwork for building upto 20.00m high. (ii) No extra payment made to contractor for work in small patches as required at site/as directed. (iii) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor.

1000

-

-

... More
Rendering 15 mm thick on brick work or concrete surfaces in cement mortar 1:6 finished even and smooth without using extra cement in and including taking down cement plaster on brick walls & concrete surfaces & the like including raking out joints, hacking for key, scrubbing down with water etc., any description, and removal of rubbish outside MoD land , complete all as specified and directed by Engineer-in-Charge. Notes: (i).Quoted rate shall be deemed to include for necessary scaffolding & formwork for building upto 12.00m high. (ii) No extra payment made to contractor for work in small patches as required at site/as directed. (iii) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor.

200

-

-

... More
Rendering 10 mm thick in cement mortar (1:3), as on concrete surfaces (such as top & bittom of chajjas, beams, balcony ceiling ,roof slab ceiling etc.) finished the surfcae even and smooth without using extra cement in and including taking down cement plaster on brick walls & concrete surfaces & the like including raking out joints, hacking for key, scrubbing down with water etc., any description, and removing of rubbish outside MoD land , complete all as specified and directed by Engineer-in-Charge. Notes: (i).Quoted rate shall be deemed to include for necessary scaffolding & formwork for building upto 12.00m high. (ii) No extra payment made to contractor for work in small patches as required at site/as directed. (iii) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor.

100

-

-

... More
Providing precast cement concrete 1:2:4 type B-0, using 12.5 mm graded mechanically crushed stone aggregates set in cement mortar 1:4 as louvres and jallies,25mm thick (measured solid), in cluding all mouldings but excluding frame in and including dismantling one way trellis work (Jafri) including taking as under of battens in trellis (posts and rails measured separately) and removal of rubbish outside MoD land , complete all as specified and directed by Engineer-in-Charge.

50

-

-

... More
Preparation of new plastered or unplastered surfaces of ceiling and applying three coats of white washing , complete all as specified and directed by Engineer-in-Charge.

100

-

-

... More
Preparation of new plastered or unplastered surfaces of walls and applying two coats of oil bound distemper including priming with alkali resistant priming paint preparatory to distempering , complete all as specified and directed by Engineer-in-Charge. Notes: (i) Quoted rate shall be deemed to include for necessary scaffolding & formwork for building upto 15m high. (ii) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor.

200

-

-

... More
Preparation of newly plastered /unplastered surfaces of walls/ceiling and applying two coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/ litre and UV resistance as per IS 15489: 2004, alkali & fungal resistant, dirt resistant exterior paint of required shade with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces in camouflage pattern , complete all as specified and directed by Engineer-in-Charge. Notes: (i) Pattern of camouflaging as per desired pattern shall be approved by GE. (ii) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor. (iii) Quoted rate shall deemed to be included the cost of necessary scaffolding & formwork for building upto 21.00m high.

1000

-

-

... More
Complete removal of existing treatment of old plastered /unplastered surfaces of walls/ceiling and applying two coats of 100% premium acrylic emulsion paint having VOC less than 50 gm/ litre and UV resistance as per IS 15489: 2004, alkali & fungal resistant, dirt resistant exterior paint of required shade in camouflage pattern as approved by GE with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over old surfaces in camouflage pattern , complete all as specified and directed by Engineer-in-Charge. Notes: (i) Pattern of camouflaging as per desired pattern shall be approved by GE. (ii) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor. (iii) Quoted rate shall deemed to be included the cost of necessary scaffolding & formwork for building upto 21.00m high.

10000

-

-

... More
Preparation of existing painting of plastered /unplastered surfaces of walls/ceiling and applying one coat of 100% Premium acrylic emulsion paint having VOC less than 50 gm/ litre and UV resistance as per IS 15489: 2004, alkali & fungal resistant, dirt resistant exterior paint of required shade with silicon additives @ 1.43 litre/ 10 sqm over old surfaces in camouflage pattern , complete all as specified and directed by Engineer-in-Charge. Notes: (i) Pattern of camouflaging as per desired pattern shall be approved by GE. (ii) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor. (iii) Quoted rate shall deemed to be included the cost of necessary scaffolding & formwork for building upto 21.00m high.

12000

-

-

... More
Preparation of old painted steel or Iron surfaces over 10cm width or grith not otherwise described from external surfaces on roofs and walls of hangers up to 15 mtrs of height ( in camouflage pattern using numbers of colours ) and applying one coat synthetic enamel paint, complete all as specified and directed by Engineer-in-Charge. Notes: (i) Camouflage pattern using number of colours shall be approved by GE. (ii) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor. (iii) Quoted rate shall deemed to be included the cost of necessary scaffolding & formwork for building upto 15.00m high.

7200

-

-

... More
Preparation of old painted steel or Iron surfaces over 10cm width or grith not otherwise described from external surfaces on roofs and walls of hangers up to 15 mtrs of height ( in camouflage pattern using numbers of colours ) and applying two coats of synthetic enamel paint, complete all as specified and directed by Engineer-in-Charge. Notes: (i) Camouflage pattern using number of colours shall be approved by GE. (ii) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor. (iii) Quoted rate shall deemed to be included the cost of necessary scaffolding & formwork for building upto 15.00m high.

2000

-

-

... More
Preperation of old surfaces of walls including brooming down or steel wire brushing scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc; washing, rubbing down and stopping of surfaces using sand paper and applying one coat of oil bound distemper including minor repair of plastering etc, complete all as specified and directed by Engineer-in-Charge. Notes: (i) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor. (ii) Quoted rate shall deemed to be included the cost of necessary scaffolding & formwork for building upto 12.00m high.

5000

-

-

... More
Complete removal of existing treatment of brik/stone/plastered surfaces of walls including brooming down or steel wire brushing scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc; washing, rubbing down and stopping of surfaces using sand paper and applying two coat of oil bound distemper including 1mm thick Walll care putty and smoothing the surface, complete all as specified and directed by Engineer-in-Charge. Notes: (i) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor. (ii) Quoted rate shall deemed to be included the cost of necessary scaffolding & formwork for building upto 12.00m high.

1000

-

-

... More
Preparation of old plastered /unplastered surfaces of walls/ceiling and applying one coat of 100% Premium acrylic emulsion paint having VOC less than 50 gm/ litre and UV resistance as per IS 15489: 2004, alkali & fungal resistant, dirt resistant exterior paint of required shade with silicon additives @ 1.43 litre/ 10 sqm (Company Depot Tinted) over and including priming coat of exterior primer including leveling by 1mm thick cement base wall care putty , complete all as specified and directed by Engineer-in-Charge. Notes: (i) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor. (ii) Quoted rate shall deemed to be included the cost of necessary scaffolding & formwork for building upto 10.00m high.

5000

-

-

... More
Preperation of old surfaces of walls including brooming down or steel wire brushing scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc; washing, rubbing down and stopping of surfaces using sand paper and applying one coat of cement base paint including minor repair of plastering etc, ,complete all as specified and directed by Engineer-in-Charge. Notes: (i) All safety measures for the safety of workers shall be ensured by contractor before execution of work. Insurance of workers shall be got done by contractor before execution of the work and the cost for the same shall be deemed to be included in rate quoted by contractor. (ii) Quoted rate shall deemed to be included the cost of necessary scaffolding & formwork for building upto 10.00m high.

1000

-

-

... More
Writing letters or figures (Block, Roman, Italic or indian) n. exc. 30cm high, painted with thick paint so that they stand out boldly and solidly without showing signs of brush marks; if necessary, they shall be repainted until the desired result is obtained , complete all as specified and directed by Engineer-in-Charge.

20

-

-

... More
Writing Stops, commas, short lines, dashes, hyphens, brackets, etc., painted with thick paint so that they stand out boldly and solidly without showing signs of brush marks; if necessary, they shall be repainted until the desired result is obtained , complete all as specified and directed by Engineer-in-Charge.

5

-

-

... More
Repairing the edges of RCC chajja, fascia, columns, beams & loft of stair cases and like by providing PCC (1:2:4) type B-0 including necessary formwork or provision of rendering 15mm thick (average thickness) in cement mortar (1:3) with chicken wire mesh and finishing the surface fair and even including applying a coat of cement of slurry @3kg/ sqm of surface; surface area not exceeding 600mm wide in patches including taking down swollen/ damaged plaster or concrete upto 12 metre height ,complete all as specified and as directed by Engineer -in-Charge.

100

-

-

... More
PVC (SWR) pipes 75 mm bore single socketed in any length with ruber rings joints fixed to walls with necessary brackets and making good the mouth of rain water pipe in and including taking down eaves gutters and rainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., including cleaning or refixing or removal to Store (measured overall as fixed along the centre line over fittings and accessories ,complete all as specified and directed by Engineer-in- Charge.

20

-

-

... More
PVC (SWR) pipes 110 mm bore single socketed in any length with ruber rings joints fixed to walls with necessary brackets and making good the mouth of rain water pipe in and including taking down eaves gutters and rainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., including cleaning or refixing or removal to Store (measured overall as fixed along the centre line over fittings and accessories ,complete all as specified and directed by Engineer-in- Charge.

95

-

-

... More
PVC (SWR) bends any radius 110mm bore fixed with solvent cement in any position as per site requirement fixed as in repair , complete all as specified and directed by Engineer-in-Charge.

30

-

-

... More
PVC (SWR) bends any radius 75mm bore fixed with solvent cement in any position as per site requirement fixed as in repair , complete all as specified and directed by Engineer-in-Charge.

10

-

-

... More
Note :Schedule of credit to be deducted on acceptances of bid.Details of Schedule of credit is given in tender documentse.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.