Chandigarh Administration Tender
View complete overview of Chandigarh Chandigarh Administration Tender
Chandigarh Administration Tender
Civil And Construction
Building Construction
Eprocure
Opening Date3 Sep 2024
Closing Date10 Sep 2024
Tender Amount₹ 22,11,880
Costs
EMD
₹ 44,238Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CHD_82222_1Bid Award Id
ViewTender No
EECP75/2024/1477671 dated 02.09.2024Tender Authority
Chandigarh Administration ViewPurchaser Address
-Website
http://http://chandigarh.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
With common burnt clay F.P.S.(non modular) brick tile of class designation 10. DSR No.12.16
692.88
727662
1050.2
... More
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : DSR No.12.21
-
-
-
... More
In 75x75 mm deep chase. DSR No.12.21.1
507.9
154985
305.15
... More
Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1 m x1 m x 400 micron, finished with 12 mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat cement, rounding the edges and making and finishing the outlet complete. DSR No.12.22
31
9245
298.25
... More
12 mm cement plaster of mix : DSR No.13.1
-
-
-
... More
1:4 (1 cement: 4 fine sand) DSR No.13.1.1
315.34
109438
347.05
... More
Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3 mm thick water proofing membrane, black finished reinforced with non-woven polyester matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/ litre and viscocity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc, and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : Joint strength in longitudinal and transverse direction at 23°C as 650/ 450N/ 5cm. Tear strength in longitudinal and transverse direction as 300/250N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane : DSR No.14.91
-
-
-
... More
3 mm thick. DSR No.14.91.1
692.88
388671
560.95
... More
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. DSR No.15.23
-
-
-
... More
For thickness of tiles above 25 mm and up to 40 mm. DSR No.15.23.2
692.88
78537
113.35
... More
Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. DSR No.15.25
214.94
57270
266.45
... More
Demolishing mud phaska in terracing and disposal of material within 50 metres. DSR No.15.27
70.36
64330
914.3
... More
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. DSR No.15.56
330.03
18036
54.65
... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved. DSR No.15.56
26.8
7073
263.95
... More
Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations: DSR No.22.7
-
-
-
... More
(a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment.
-
-
-
... More
(b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs.
-
-
-
... More
(c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge.
-
-
-
... More
(d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep.
-
-
-
... More
(e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test. “All above operations to be done in order and as directed and specified by the Engineer-in-Charge”:
-
-
-
... More
With average thickness of 120 mm and minimum thickness at khurra as 65 mm. DSR No.22.7.1
214.94
362087
1684.6
... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. DSR No.24.2
11.15
3771
338.25
... More
Deduct for item not executed as per DSR item 22.7 (d) Finishing the surface with 20mm thick Jointless cement mortar of mix 1:4. NS
214.94
-105709
491.81
... More
Repair of detriorated RCC surface having exposed rusted reinforcement consisting of following operations. (a) Chipping of concrete surface 25mm thick average depth & afterwards removal of loose concrete and exposing of the steel bars. Cleaning the surface properly to remove the dust particles and rust from the steel bars complete in all respects to the entire satisfaction of the engineer in charge. (b) Moistening the surface properly and applying acrylic polymer (acrocrete / pidilite / master crete) coating mixed with cement (@ 0.20kg polymer per 1 kg of cement) for proper bond of old and new concrete in two coats. (c) Providing and fixing of MS wire mesh by using binding wire and nails complete in all respects to the entire satisfaction of the Engineer in charge. (d) Placing and applicaton of the cement concrete 1:1.5:3 having thickness (3/4" to 1.1/4") mixed with acrylic polymer admixture @ 1kg per bag of cement complete in all respects to the entire satisfaction of the Engineer in charge. NS
17.63
12352
700.65
... More
Labour charges for dismantelling and refixing the available double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. (3) The rate is labour rate only. NS
144.92
21158
146
... More
Cleaning of the loose earth and bitumen on existing roof surface / slab with wire brush etc including disposal of the loose material complete in all respects for application of water proofing treatment. NS
907.82
50928
56.1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements