Chandigarh Administration Tender
View complete overview of Chandigarh Chandigarh Administration Tender
Chandigarh Administration Tender
Civil And Construction
Building Construction
Eprocure
Opening Date9 Aug 2024
Closing Date16 Aug 2024
Tender Amount₹ 5,39,428
Costs
EMD
₹ 10,789Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CHD_81860_1Bid Award Id
ViewTender No
CP3/2024/1691304Tender Authority
Chandigarh Administration ViewPurchaser Address
-Website
http://http://chandigarh.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement :6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement :6 coarse sand)
5.39
49994
9275.45
... More
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :In cement mortar
21.68
53310
2458.95
... More
Providing and fixing golden champ jaffery on compound wall with frame of golden champ section 2” x 1.3/8” as horizontal member and vertical members fixed with golden champ and strips 4”x 3/8” @ 6” c/c on both faces sides faces of jaffery. The top of jaffery is to be covered with another strip of 2 x 1.3/8”. The complete panel is to fixed over existing wall and M.S. angle with iron nuts and bolts etc. The complete jaffery is to be painted with special quality over one coat of primer complete in all respect to the entire satisfaction of Engineer-in-charge.
48.37
102960
2128.6
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement :2 coarse sand (zone-Ill) derived from natural sources:4 graded stone aggregate 20mm nominal size derived from natural sources)
3.9
30726
7878.5
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10(1cement :5 coarse sand (zone-Ill)derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from naturalsources)
4.54
29594
6518.6
... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.
31.87
10780
338.25
... More
15 mm cement plaster on the rough side of single or half brick wall of mix :1:4 (1 cement: 4 fine sand)
116.72
46623
399.45
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements