Chandigarh Administration Tender
View complete overview of Chandigarh Chandigarh Administration Tender
Chandigarh Administration Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date8 Aug 2022
Closing Date17 Aug 2022
Tender Amount₹ 4,68,643 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 13,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_CHD_67122_2Bid Award Id
ViewTender No
PH1/2022/133Tender Authority
Chandigarh Administration ViewPurchaser Address
-Website
http://http://chandigarh.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Maintenance of Air Conditioning Plant of Civil Work and other allied works in Govt. Medical College and Hospital, Sector-32, Chandigarh
BOQ Items
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
-
-
-
... More
Cement mortar 1:4 (1 cement : 4 coarse sand)
2
-
8468.69
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
-
-
-
... More
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
350
-
141.57
... More
Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound , jointing tapes , finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer's specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with :
-
-
-
... More
12.5 mm thick tapered edge gypsum moisture resistant board
50
-
1293.87
... More
12 mm cement plaster of mix :
-
-
-
... More
1:4 (1 cement: 4 coarse sand)
30
-
305.68
... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :
-
-
-
... More
New work (two or more coats) over and including water thinnable priming coat with cement primer
50
-
161.72
... More
Applying priming coat:
-
-
-
... More
With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works
250
-
55.22
... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
50
-
123.22
... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
-
-
-
... More
One or more coats on old work
3000
-
86.11
... More
Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) :
-
-
-
... More
For fixed portion
-
-
-
... More
Anodised aluminium (anodised transparent or dyed to required shade according to
IS: 1868, Minimum anodic coating of grade AC 15)
150
-
431.74
... More
For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately)
-
-
-
... More
Anodised aluminium (anodised transparent or dyed to required shade according to
IS: 1868, Minimum anodic coating of grade AC 15)
50
-
529.09
... More
Providing and fixing 12 mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS:12823 Grade l Type ll, in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineerin-charge.
-
-
-
... More
Pre-laminated particle board with decorative lamination on both sides
30
-
946.2
... More
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge. (Cost of aluminium snap beading shall be paid in basic item):
-
-
-
... More
With float glass panes of 4.0 mm thickness (weight not less than 10kg/sqm)
15
-
1014.6
... More
Clenaing of Pre Laminated Board Fixing in the false ceiling by removing, cleaning from both side (inside/ outside) and refixing after strengthing the grid of false ceiling with suitable arrangement likes fastners/ Gitti/ Pattes etc to the entire satisfaction of EIC. The cleaning of prelaminated board should be done by suitable cleaning agent which can not damage the material and colour of the already installed false ceiling. The work also includes cleaning of grid provided for the false ceiling including cost of all T and P, cleaning material, ladders, tools and precautionary measures to safequard the patients in hospital area.
5000
-
15
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements