Chandigarh Administration Tender
View complete overview of Chandigarh Chandigarh Administration Tender
Chandigarh Administration Tender
Civil And Construction
Building Construction
Eprocure
Opening Date24 Jan 2024
Closing Date31 Jan 2024
Tender Amount₹ 14,72,531
Costs
EMD
₹ 29,451Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CHD_78939_1Bid Award Id
ViewTender No
CP3/2024/1368451Tender Authority
Chandigarh Administration ViewPurchaser Address
-Website
http://http://chandigarh.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
565.92
12484
22.06
... More
Providing, applying and filling with cement based putty (Birla, JK or equivalent) and sand papering, preparing the surface smooth to required finish complete in all satisfaction of Engineer in Charge.
565.92
16423
29.02
... More
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the
113.18
57232
505.68
... More
Providing and fixing 6mm thick polycarbonate multi wall sheet to be fixed on existing M.S. frame with Aluminum rivets complete in all respect to the entire satisfaction of Engineer-in-charge.
239.68
472136
1969.86
... More
Providing and fixing top aluminium profile with rubber gasket to seal the joint of polycarbonate sheet with self drilling screws etc complete fixed in all respect and to the entire satisfaction of Engineer-in-charge.
82.3
27534
334.56
... More
Providing and fixing bottom aluminium profile with rubber gasket to seal the joint of polycarbonate sheet with self drilling screws etc complete fixed in all respect and to the entire satisfaction of Engineer-in-charge.
82.3
29423
357.52
... More
Providing and fixing 1.5mm thick polycarbonate sheet to be fixed on the existing MS frame with self drilling machine screws complete in all respect to the entire satisfaction of Engineer-in-charge.
55.74
60000
1076.43
... More
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished seamless type tubes
1352.23
234233
173.22
... More
Providing and fixing golden champ jaffery on compound wall with frame of golden champ section 2” x 1.3/8” as horizontal member and vertical members fixed with golden champ and strips 4”x 3/8” @ 6” c/c on both faces sides faces of jaffery. The top of jaffery is to be covered with another strip of 2 x 1.3/8”. The complete panel is to fixed over existing wall and M.S. angle with iron nuts and bolts etc. The complete jaffery is to be painted with special quality over one coat of primer complete in all respect to the entire satisfaction of Engineer-in-charge.
46.25
93097
2012.92
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements