Central Scientific Instruments Organisation Tender
View complete overview of Chandigarh CSIO Tender
Central Scientific Instruments Organisation - CSIO Tender
Eprocure
Opening Date20 Jun 2024
Closing Date4 Jul 2024
Tender Amount₹ 14,93,718
Costs
EMD
₹ 29,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Csio/1533/2024-25/esd
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CSIR_198936_1Bid Award Id
ViewTender No
CSIO/1533/2024-25/ESDTender Authority
Central Scientific Instruments Organisation ViewPurchaser Address
-Website
http://https://www.csir.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Wall painting with acrylic emulsion paint of Asian paint / Nerolac paint / Dulux paint make to give an even shade including priming one coat of primer :Two or more coats on new work including repair work with putty up to 1 sqm wherever required at wall / ceiling. Note :- All Stains of Paint old /new to be removed by agency from Floor , Glass Frame etc same day.
432
-
-
... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer J k wall putty / Asian / birla wallcare putty , over the plastered wall surface to prepare the surface even and smooth complete.Scraped matrial shift with in CSIO.
720
-
-
... More
Wall painting with acrylic emulsion paint of Asian paint / Nerolac paint / Dulux paint make to give an even shade :Two or more coats old work including repair work with putty up to 1 sqm wherever required at wall / ceiling.Note :- All Stains of Paint old /new to be removed by agency from Floor , Glass Frame etc same day.
1409.56
-
-
... More
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete
440
-
-
... More
White washing with lime to give an even shade :Old work (two or more coats) All Stains of Paint old /new to be removed by agency from Floor , Glass Frame etc same day.
450
-
-
... More
Distempering with oil bound washable distemper of Asian paint / Nerolac paint / Dulux paint make to give an even shade :Old work (two coats) including repair work with putty up to 1 sqm wherever required at wall / ceiling. All Stains of Paint old /new to be removed by agency from Floor , Glass Frame etc same day.
7748.51
-
-
... More
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.Scraped material shift within CSIO.
1960
-
-
... More
Painting with synthetic enamel paint of Asian paint / Nerolac paint / Dulux paint makeof required colour to give an even shade two coats on old work. Note :- All Stains of Paint old /new to be removed by agency from Floor , Glass Frame etc same day.dismentle matrial shift with in CSIO.
3419.38
-
-
... More
Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50metres lead :With cement mortar 1:4 (1 cement : 4 fine sand). Note :- All Floors to be Cleaned properely after Work dismentle matrial shift with in CSIO.
17.6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements