Central Scientific Instruments Organisation Tender

View complete overview of Chandigarh CSIO Tender

Central Scientific Instruments Organisation - CSIO Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date14 Jul 2023
Closing Date31 Jul 2023
Tender Amount₹ 6,77,88,533 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and installation of walkable Ceiling Panel 80mm double skin demountable panel made of 0.8 mm thick PCGI Sheet on both side with Puff infill of 40+/-2Kg/M³ density locking system is GI Profile with GI Wall inserter systems with necessary accessories along with sealant for seamless and Airtight finish. Colour - RAL9002

265

-

-

... More
Panel accessories Supply and installation of aluminium Coving of radius 50 mm with Aluminum Backing (Wall to Wall, Wall to Ceiling).

605.2

-

-

... More
Supply and installation of Al. Powder coated 3D corner

44

-

-

... More
Supply and installation of Al. Powder coated 2D corner

18

-

-

... More
Clean Room Doors Supply and installation of galvanized Iron Powder Coated double skin door for cleanroom, with 44 mm leaf thickness made of 1 mm GI sheet for door leaf with PUF of density 40 Kg /M3 infill and door frame made out of 1.60mm thick Galvanized Iron profile/ aluminium powder coated frame for 50 mm panel. ACCESSORIES: SS 304 ball bearing Hinges, SS304 D handle Back to Back , Dead Lock with Both side key operation, SS Kick plate 0.8 mm thick up to 300 mm height Door closer TS 68 Standard Arm, Concealed type Bottom Drop seal , Door stopper floor mounted , Double glazed view panel of 400*800 mm with 5 mm thick toughened glass, Door seal, Concealed type flush bolt for Double leaf door size: 1800 mm x 2400 mm

2

-

-

... More
Supply and installation of galvanized Iron Powder Coated double skin door for cleanroom, with 44 mm leaf thickness made of 1 mm GI sheet for door leaf with PUF of density 40 Kg /M3 infill and door frame made out of 1.60mm thick Galvanized Iron profile/ aluminium powder coated frame for 50 mm panel. ACCESSORIES: SS 304 ball bearing Hinges, SS304 D handle Back to Back , Dead Lock with Both side key operation, SS Kick plate 0.8 mm thick up to 300 mm height Door closer TS 68 Standard Arm, Concealed type Bottom Drop seal , Door stopper floor mounted , Double glazed view panel of 400*800 mm with 5 mm thick toughened glass, Door seal, Concealed type flush bolt for Single leaf door Size: 1000 mm x 2400 mm

6

-

-

... More
Supply and installation, sizing & fixing in position 800 mm x 2400 mm Single leaf Air tight Emergency doors pre-approved make 40 mm thick flush doors made of 1 mm thick GI totally flush with the wall panels sheet with PUF as infill and concealed hardware including providing & fixing door frame, precise cutting of shutters for aligning, positioning in proper line, level & plumb including providing & fixing all required hardware for fixing of door frames & shutters, double glazed hermetically sealed view panel with minimum 5 mm thick tempered toughened glass, 16 swg kick plate from push side, S S push plate, TS 68 standard arm - premium door closure, SS D handle generally of 250 mm length and 25 mm dia, Specially fabricated Heavy Duty SS Ball bearing hinges 3 nos, Auto drop door seal, Door set lock with 1 side key 1 side knob, Panic bar - Panic bar with single point locking arrangement from outside concealed tower bolt as required etc all complete as per detailed specifications, standard operating procedures. Emergency door with panic bar, Size: 800 x 2400 (Single leaf doors)

2

-

-

... More
Supply and installation of double-glazed flushed view panel using Toughened Glass of 5 mm thickness. Vision Panel Size 1000 mm*1000 mm

6

-

-

... More
Cleanroom Light Supply and installation of yellow colour Tear Drop Cleanroom compatible LED light 40W, with an Illumination Value of 400 LUX

16

-

-

... More
Supply and installation of white fluorescent colour Tear Drop Cleanroom compatible LED light 40W, with an Illumination Value of 500 LUX

43

-

-

... More
Terminal Box with HEPA filter and circular damper Supply and installation of Terminal HEPA Module, Flange Type with Filter Room Side Change with the Below Features : * MOC of Housing: Aluminium Powder Coated Extrusion * MOC of Filter: Aluminium Anodized Extrusion * Top Air Inlet * With Internal Air Distribution Perforated Diffuser plate * With Upstream PAO concentration port & pressure measurement ports, * Worm Gear Operated Damper at external to the housing * Supplied with Gel Seal HEPA Filter Box Type, * Filter Media: Glass Fibre Media with Hot Melt Separator, with P/C GI Face Guard on both side * Class : H14, Efficiency: 99.995% @ MPPS, as per EN1822 (99.999% @ 0.3 Micron) * With 18G, SS304 Perforation Sheet Filter Size: 610 x 1220 x 81 mm with 48 mm/2" media pack, with tolerance of +/-10% CFM: 710 +/-10% @0.45 m/s velocity. IPD : 135 Pa+/-10%, FPD:500 pa, Flow 710 +/- 10% CFM at 90 FPM

48

-

-

... More
Return air grill with damper Supply and installation of return air grills fabricated out of aluminium extruded section duly powder coated along with volume control damper. 600 x 600 mm

20

-

-

... More
Flexible Duct Supply and installation of pre insulated flexible duct of length 1700mm dia 300mm Specifications • Temperature Range: up to 60°C • Maximum Positive Pressure: - 10" w.g. • Insulation - Fibre glass insulation • Thickness - 25mm • Density - 16 Kg/m3

103

-

-

... More
Air Shower Supply, installation, testing, commissioning of Air shower for Dust proof entry of the persons in the Clean Room, Fabricated with SS 304 powder coated. Having Sufficient jet nozzles, Blower Motor, Pre-filter, HEPA Filter, Return air perforated grills, Lamps, Door interlocking system) space for 2 people entry at a time with showering duration of 30sec with nozzle speed of 20- 25 m/s. Size 1500 x 2000 x 2800 mm

1

-

-

... More
Garment Storage Cabinet Supply, installation, testing, commissioning of Cleanroom Garments Storage Cabinet, fabricated with 18G GI powder coated. (Blower Motor, Pre-filter, HEPA Filter, Return air perforated grills, Lamps, Shelf, Hanger, IR Lamp, Magnehelic Gauge). Size 1200 x 450 x 1500 mm

1

-

-

... More
Cross Over Bench Supply, installation, testing commissioning of cross over bench 2400 x 450 x 500 mm MOC IS 304 Grade Stainless Steel

1

-

-

... More
Cleanroom Mirror Cleanroom Mirror - 1800 x 600 x 5 mm

1

-

-

... More
Pass Boxes Supply Installation of Dynamic Pass box MOC SS-304 finish with velocity of 90 FPM. Size: 600 x 600 x 600 (L x W X H) mm

1

-

-

... More
Supply Installation of Static Pass box MOC SS-304 finish with velocity of 90 FPM. Size: 600 x 600 x 600 (L x W X H) mm

1

-

-

... More
Shoe Rack Shoe rack 1000 x 500 mm x 300 mm

1

-

-

... More
Floor Providing, laying, 2 mm thick anti-static, PVC flooring of Electrostatic property: 2 KV and Good resistance to chemicals as per manufacturer's recommendations, and standard operating procedures.

265

-

-

... More
Air Curtain Supply, Installation, Testing and Commissioning of Air curtain with outer cabinet shall be of suitable gauge of CRCA sheet & epoxy powder coated. Motor shall be of single phase, 1440 RPM, Grills / louvers shall be made of powder coated mild steel. Support, Door Limit switch & necessary interlocking cabling shall be included in the scope. Unique one-piece Blower Design for optimum displacement of Air High Velocity with high efficiency at low sound levels, very low power Consumption and Heavy duty Motor – Specially Designed Continuous Rating Motor with Class B Insulation, Powerful, Long life single phase Motor. Overheating protection, 5000 hr continuous operation mode, Noise level 50-70 db at 10 ft distance, air flow 1400 +/- 100 m3/hr, rpm @ 1500-2500 rpm. Width- 900 mm

1

-

-

... More
Air Cooled Chiller Supply, installation, testing and commissioning of microprocessor controlled air cooled packaged water chilling machine of 25 TR cooling capacity complete with air-cooled condenser, scroll compressor, evaporator, expansion device and associated accessories. chilled water inlet 11 °C & 7 °C ( 2 working + 1 standby)

3

-

-

... More
Centrifugal Pump Supply, Installation, testing and commissioning of Horizontal split casing type Centrifugal Pump-motor sets of 70 GPM @ 30 m WC capacity complete with nitrile rubber insulation, VFD compatible electrical motor and other associated standard accessories. 70 GPM @ 30 m WC ( 2 working + 1 standby)

3

-

-

... More
Floor mounted AHU Supply, installation, testing, and commissioning of 2-tier horizontal double skin PUF insulated recirculatory air handling units in modular construction having thermal break profile suitable for clean room application complete with fan, electric motor with VFD, cooling coil, eliminator, filters (pre & fine), mixing chamber and other associated accessories of following capacity. AHU 01- 9500 CFM with cooling coil of 11 TR and fan with SP of 125 mm WC

1

-

-

... More
Floor mounted AHU- Supply, installation, testing, and commissioning of 2-tier horizontal double skin PUF insulated recirculatory air handling units in modular construction having thermal break profile suitable for clean room application complete with fan, electric motor with VFD, cooling coil, eliminator, filters (pre & fine), mixing chamber and other associated accessories of following capacity. AHU-02 19000 CFM with cooling coil of 9 TR and fan with SP of 125 mm WC

1

-

-

... More
Floor mounted AHU- Supply, installation, testing, and commissioning of 2-tier horizontal double skin PUF insulated recirculatory air handling units in modular construction having thermal break profile suitable for clean room application complete with fan, electric motor with VFD, cooling coil, eliminator, filters (pre & fine), mixing chamber and other associated accessories of following capacity. AHU -04-900 CFM with cooling coil of 2 TR and fan with SP of 125 mm WC

1

-

-

... More
Supply, installation, testing and commissioning of 1-tier horizontal double skin PUF insulated recirculatory air handling units in modular construction having thermal break profile suitable for HVAC application complete with fan, electric motor with VFD, cooling coil, eliminator, filters (pre and fine filter), mixing chamber and other associated accessories of following capacity. AHU 03 -1500 CFM with cooling coil of 2 TR and fan with SP of 75 mm WC

1

-

-

... More
Dehumidifier Unit Dehumidifier unit- double skin 43mm thick puff insulation & density of 40+/- 2 kg/m3. The inner skin 24 gauge pre coated sheet & external is pre coated 22 gauge G.I sheet . Supply air section shall comprise of : Inlet Fresh Air-filter EU-4 / 10 micron Synthetic Non-Woven media filter. The filter shall be encased in housing which will form an integral part of dehumidifier with aluminium construction. Housing for Pre Cooling Coil. This shall be duly insulated and shall form an integral part of unit. The section need insulated drain pan, drain pan should be 18 G SS 304 construction. Inner skin with SS 304 and outer skin with PGCI sheet of 22 gauge with nitrile rubber insulation 19 mm thick. Dehumidifier section with desiccant honeycomb rotor on a horizontal fixed shaft arrangement & 100% Electrical heater bank. Fan should be DIDW Centrifugal type with process motor. Bed Drive unit with drive rotor. Reactivation Motor with reactivation fan. Thermostat, 30 to 300 deg. C range - 2 Nos The dehumidifier units should have volume control dampers at Supply, Return, Fresh Air, Reactivation air inlet & outlet.Electrical control panel comprising of all electrical components and controller as required for a effective operation shall be provided with dehumidifier and it should be BMS compatible.2500 CFM pre cooling coil with 20 TR CFM.

1

-

-

... More
Humidifier Unit Humidifier Unit- Includes Humidfier tank made from 1.2mm thick Stainless Steel Sheet in welded construction with steam Inlet / Outlet / Drain / Overflow Nozzle, Top cover Openable with S.S Bolts Heating Element : Electrical Resistance Immersion Type, S.S tube Chrome plated Rating : following specification with 0.5 KW additional Heater with Thermostat to maintain 75°C Temperature inside tank Controls : Level Switch – RC-61L for Low Level Cut out (with Nylon Ball) Float valve with S.S Ball at Inlet connection. Thermostat for additional heater (Range = 5 °C to 75 °C) Master Thermostat for total load (Range = 50 °C to 120 °C) Sight glass to be provided to check water, overflow valve. Insulation : 25mm thick fiber glass wool cladded with 22 Gauge thick G.I sheet. with BMS compatible control panel Make up water and drain connection should be considered. Humidifier 01- 2 KW 8 kg/h

1

-

-

... More
Humidifier Unit- Includes Humidfier tank made from 1.2mm thick Stainless Steel Sheet in welded construction with steam Inlet / Outlet / Drain / Overflow Nozzle, Top cover Openable with S.S Bolts Heating Element : Electrical Resistance Immersion Type, S.S tube Chrome plated Rating : following specification with 0.5 KW additional Heater with Thermostat to maintain 75°C Temperature inside tank Controls : Level Switch – RC-61L for Low Level Cut out (with Nylon Ball) Float valve with S.S Ball at Inlet connection. Thermostat for additional heater (Range = 5 °C to 75 °C) Master Thermostat for total load (Range = 50 °C to 120 °C) Sight glass to be provided to check water, overflow valve. Insulation : 25mm thick fiber glass wool cladded with 22 Gauge thick G.I sheet. with BMS compatible control panel Make up water and drain connection should be considered. Humidifier 02 3 KW 12 kg/h

1

-

-

... More
Humidifier Unit- Includes Humidfier tank made from 1.2mm thick Stainless Steel Sheet in welded construction with steam Inlet / Outlet / Drain / Overflow Nozzle, Top cover Openable with S.S Bolts Heating Element : Electrical Resistance Immersion Type, S.S tube Chrome plated Rating : following specification with 0.5 KW additional Heater with Thermostat to maintain 75°C Temperature inside tank Controls : Level Switch – RC-61L for Low Level Cut out (with Nylon Ball) Float valve with S.S Ball at Inlet connection. Thermostat for additional heater (Range = 5 °C to 75 °C) Master Thermostat for total load (Range = 50 °C to 120 °C) Sight glass to be provided to check water, overflow valve. Insulation : 25mm thick fiber glass wool cladded with 22 Gauge thick G.I sheet. with BMS compatible control panel Make up water and drain connection should be considered. Humidifier 03-1.5 KW 6 kg/h

1

-

-

... More
1 HP pump with compatible head for water for the humidifier with all the necessary accessories.

1

-

-

... More
GI Ducting Supply of material, fabrication, installation, testing and commissioning of air-conditioning GI ducts complete with all accessories such as bends, elbows, transition pieces, support , Flange etc. of following material & thickness sheets as per site requirement. 20G GI duct

475

-

-

... More
Supply of material, fabrication, installation, testing and commissioning of air-conditioning GI ducts complete with all accessories such as bends, elbows, transition pieces, support , Flange etc. of following material & thickness sheets as per site requirement. 22G GI duct

735

-

-

... More
Supply of material, fabrication, installation, testing and commissioning of air-conditioning GI ducts complete with all accessories such as bends, elbows, transition pieces, support , Flange etc. of following material & thickness sheets as per site requirement. 24G GI duct

450

-

-

... More
Insulation with AL cladding Supply and installation of closed cell class 0 "ZERO" nitrile rubber insulation on GI ducts covered with 26G aluminium cladding complete with all accessories like adhesive, jointing tap, hardware etc. 19mm insulation with Al cladding

1660

-

-

... More
Volume control damper Supply and installation of manually operated, multi louvered, opposed aerofoil blade volume control damper with outer body frame and blades fabricated out of GI section complete with other accessories such as locking arrangement, gear train, handle, position indicator etc..

6

-

-

... More
Fire and smoke damper Supply and installation of motorised fire cum smoke control damper of following sizes complete with fire & smoke sensors, actuator, control panel, linkage, and other accessories.

3

-

-

... More
Actuator 12 N-m

4

-

-

... More
Back draft damper Supply and installation of multi louvered heavy duty gravity type back draft damper with outer body frame and blades fabricated out of GI section and aerofoil section respectively.

3

-

-

... More
Sound attenuator Supply and installation of sound attenuator with aluminium casing, splitters, acoustic material, fibre glass tissue paper, Al perforated sheet etc. suitable for clean room.

3

-

-

... More
Duct Heaters Supply, installation, testing and commissioning of duct heater, control cum power panel box fabricated out of GSS sheet of appropriate thickness with tubular finned heater of following capacity internal lined with 6 mm thick asbestos sheet, complete with thermostat, terminal box, FRLS wires, MCBs, indicator, contactors, control and power cabling, control logic etc. rated 2 KW

1

-

-

... More
Supply, installation, testing and commissioning of duct heater, control cum power panel box fabricated out of GSS sheet of appropriate thickness with tubular finned heater of following capacity internal lined with 6 mm thick asbestos sheet, complete with thermostat, terminal box, FRLS wires, MCBs, indicator, contactors, control and power cabling, control logic etc. rated 6 KW

1

-

-

... More
Supply, installation, testing and commissioning of duct heater, control cum power panel box fabricated out of GSS sheet of appropriate thickness with tubular finned heater of following capacity internal lined with 6 mm thick asbestos sheet, complete with thermostat, terminal box, FRLS wires, MCBs, indicator, contactors, control and power cabling, control logic etc. rated 7 KW

1

-

-

... More
Supply, installation, testing and commissioning of duct heater, control cum power panel box fabricated out of GSS sheet of appropriate thickness with tubular finned heater of following capacity internal lined with 6 mm thick asbestos sheet, complete with thermostat, terminal box, FRLS wires, MCBs, indicator, contactors, control and power cabling, control logic etc. rated 14 KW

1

-

-

... More
Chilled Water Piping Supply, installation, testing and commissioning of GI piping for chilled water of following sizes & C class for chilled water system complete with all required flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding and supports etc. NB 100 mm class C

1

-

-

... More
Supply, installation, testing and commissioning of GI piping for chilled water of following sizes & C class for chilled water system complete with all required flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding and supports etc. NB 80 mm class C

100

-

-

... More
Supply, installation, testing and commissioning of GI piping for chilled water of following sizes & C class for chilled water system complete with all required flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding and supports etc. NB 65 mm class C

48

-

-

... More
Supply, installation, testing and commissioning of GI piping for chilled water of following sizes & C class for chilled water system complete with all required flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding and supports etc. NB 50 mm class C

30

-

-

... More
Supply, installation, testing and commissioning of GI piping for chilled water of following sizes & C class for chilled water system complete with all required flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding and supports etc. NB 40 mm class C

12

-

-

... More
Supply, installation, testing and commissioning of GI piping for chilled water of following sizes & C class for chilled water system complete with all required flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding and supports etc. NB 25 mm class C

63

-

-

... More
Gate valve Supply, installation, testing and commissioning of flanged end, non rising spindle, PN-16, CI gate valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 80 mm

2

-

-

... More
Supply, installation, testing and commissioning of flanged end, non rising spindle, PN-16, CI gate valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 65 mm

12

-

-

... More
Supply, installation, testing and commissioning of flanged end, non rising spindle, PN-16, CI gate valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 50 mm

8

-

-

... More
Supply, installation, testing and commissioning of flanged end, non rising spindle, PN-16, CI gate valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 40 mm

4

-

-

... More
Supply, installation, testing and commissioning of flanged end, non rising spindle, PN-16, CI gate valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 32 mm

1

-

-

... More
Supply, installation, testing and commissioning of flanged end, non rising spindle, PN-16, CI gate valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 25 mm

8

-

-

... More
Balancing valve Supply, installation, testing and commissioning of flanged end, PN-16, CI balancing valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 65 mm

3

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, CI balancing valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 65 mm

2

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, CI balancing valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 65 mm

1

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, CI balancing valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 65 mm

1

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, CI balancing valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 65 mm

2

-

-

... More
Check valves Supply, installation, testing and commissioning of flanged end, PN-16, CI swing check valves of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 65 mm

3

-

-

... More
Y-strainers Supply, installation, testing and commissioning of flanged end, PN-16, CI Y-strainers of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 65 mm

3

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, CI Y-strainers of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 50 mm

2

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, CI Y-strainers of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 40 mm

1

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, CI Y-strainers of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 32 mm

1

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, CI Y-strainers of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 25 mm

2

-

-

... More
Motorised butterfly valve Supply, installation, testing and commissioning of flanged end, PN-16, motorised butterfly valves with actuator with BMS compatibility of following sizes for chilled water system complete with all required counter flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. Size DN 65 mm

3

-

-

... More
3-way modulating valves Supply, installation, testing and commissioning of flanged end, PN-16, DI/SS motorised 3-way modulating valves of following sizes for chilled water system complete with BMS compatibility and all required counter flanges and/ fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 100 mm DI valves

1

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, DI/SS motorised 3-way modulating valves of following sizes for chilled water system complete with BMS compatibility and all required counter flanges and/ fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 50 mm SS valves

2

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, DI/SS motorised 3-way modulating valves of following sizes for chilled water system complete with BMS compatibility and all required counter flanges and/ fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 50 mm SS valves

1

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, DI/SS motorised 3-way modulating valves of following sizes for chilled water system complete with BMS compatibility and all required counter flanges and/ fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 50 mm SS valves

1

-

-

... More
Supply, installation, testing and commissioning of flanged end, PN-16, DI/SS motorised 3-way modulating valves of following sizes for chilled water system complete with BMS compatibility and all required counter flanges and/ fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding etc. DN 50 mm SS valves

2

-

-

... More
Ball valve/ Drain valve Supply, installation, testing and commissioning of threaded end, PN 16/class-150, CI ball valves of following sizes for chilled water system complete with all required nipples, fittings, Nitrile rubber insulation covered with aluminium cladding etc. 40 mm NB

1

-

-

... More
Supply, installation, testing and commissioning of threaded end, PN 16/class-150, CI ball valves of following sizes for chilled water system complete with all required nipples, fittings, Nitrile rubber insulation covered with aluminium cladding etc. 25 mm NB

16

-

-

... More
Air vent Supply, installation, testing and commissioning of threaded end, PN 16/class-150 CI auto air vent having CI ball valve of 25 mm dia suitable for chilled water system complete with all required nipples, fittings, Nitrile rubber insulation covered with aluminium cladding etc.

10

-

-

... More
Make UP tank Supplying and installation of elevation moulded cylindrical vertical syntax water storage tanks at required height of approved make of 500 litre capacities with suitable S.M.C. cover at top. The tank should have inlet, outlet, drain and overflow, providing and fixing necessary GI nipples ranging from 15mm to 50mm NB. of average 150mm length with double check nuts, washers etc.

1

-

-

... More
Thermometer 0 to 50 °C range stem type thermometers having 100 mm dia dial with suitable stainless steel thermowells for measurement of water temperature.

16

-

-

... More
Pressure Gauge 0 to 10kg/sq. cm. range bourdon tube type pressure gauge having 100 mm dia dial, U syphon, and cock in stainless steel construction for measurement of water pressure.

22

-

-

... More
Building Management System DDC Panel for the Building Management System- DDC Panel Supply, Installation, Testing and Commissioning of Automation stations/DDC Controller with I/O module etc., The controllers shall be 16/32-bit microprocessor based standalone and net workable type with real time clock and historical database of min 1 Mb. DDC Panel for Cleanroom parameters

1

-

-

... More
DDC Panel for the Building Management System- DDC Panel Supply, Installation, Testing and Commissioning of Automation stations/DDC Controller with I/O module etc., The controllers shall be 16/32-bit microprocessor based standalone and net workable type with real time clock and historical database of min 1 Mb. DDC Panel for Chilled water system

1

-

-

... More
DDC Panel for the Building Management System- DDC Panel Supply, Installation, Testing and Commissioning of Automation stations/DDC Controller with I/O module etc., The controllers shall be 16/32-bit microprocessor based standalone and net workable type with real time clock and historical database of min 1 Mb. DDC Panel for HVAC

1

-

-

... More
Centralised BMS controller with software Centralised BMS controller with software- Supply, installation, testing & commissioning of Host PC comprising i9 Processor, 3.2 GHz or above, 32.0GB RAM, 1TBSSD + 1TB HDD, DVD Writer, 27"monitor, keyboard, mouse, and preloaded windows 11 operating system and anti-virus software, Multifunctional LaserJet printer. Communication protocols for BMS to be specified: The system must support the use of RS485 Modbus, Modbus TCP/IP, Ethernet TCP/IP, Profibus, BACnet protocols. The system must provide provision for remote access, configuring alarms and alarm viewing, web-based graphics viewer and editor, logger, trend viewer, report generation, troubleshooting application in the software, access protection with configurable password protection.

1

-

-

... More
Supply, installation, testing & commissioning of 27" LCD for gas cabinet for monitoring.

1

-

-

... More
Field Devices Supply, installation, testing and commissioning of Differential Pressure Switch (Filter status)

12

-

-

... More
Supply, installation, testing and commissioning of Differential Pressure Switch (Fan running status)

5

-

-

... More
Supply, installation, testing and commissioning of Duct Temp & RH Sensor (air ), Temp - 0 - 100 °c & RH - 30 % - 100 %

10

-

-

... More
Supply, installation, testing and commissioning of Smoke sensor

8

-

-

... More
Supply, installation, testing and commissioning of Temp sensor for chilled water 0 to 100 °C

5

-

-

... More
Supply, installation, testing and commissioning of Relative humidity sensor (0% to 95 % )

4

-

-

... More
Supply, installation, testing and commissioning of Air stat/air flow switch suitable for on-off operation of heaters of AHUs.

5

-

-

... More
Supply, installation, testing and commissioning of Room temp & RH sensor

4

-

-

... More
Supply, installation, testing and commissioning of Room differential pressure sensor

4

-

-

... More
Supply, installation, testing and commissioning of Lux intensity sensor

4

-

-

... More
Supply, installation, testing and commissioning of BMS compatible Thermostat with sensor for measuring & control of temperature and suitable for on-off operation of 3-way mixing valves of AHUs.

5

-

-

... More
Supply, installation, testing and commissioning of BMS compatible Flow switches for chilled water lines system.

3

-

-

... More
Supply, installation, testing and commissioning of Dew point sensor

4

-

-

... More
Supply, installation, testing and commissioning of BMS compatible Thermostat with sensor for measuring temperature and RH in cleanroom

3

-

-

... More
Supply, installation, testing and commissioning of Hooter

3

-

-

... More
Flow meter Supply, installation, testing and commissioning of Electromagnetic flow meter of following details for measurement of water flow in pipe lines. 0 to 1500 lpm in 80 mm diameter pipe line

1

-

-

... More
Instrumentation cables Supply, installation, testing and commissioning of Outdoor type junction box - 450H x 300L x 250D

11

-

-

... More
Supply, installation, testing and commissioning of 1 pair 1.5 sqmm armoured multi-stranded twisted cable.

200

-

-

... More
Supply, installation, testing and commissioning of 2 pair 1.5 sqmm armoured multi-stranded twisted cable.

700

-

-

... More
Supply, installation, testing and commissioning of 4 pair 1.5 sqmm armoured multi-stranded twisted cable.

160

-

-

... More
Supply, installation, testing and commissioning of 16 pair 1.5 sqmm armoured multi-stranded twisted cable.

90

-

-

... More
Supply, installation, testing and commissioning of 18 pair 1.5 sqmm armoured multi-stranded twisted cable.

104

-

-

... More
Supply, installation, testing and commissioning of 20 pair 1.5 sqmm armoured multi-stranded twisted cable.

20

-

-

... More
Supply, installation, testing and commissioning of Modbus cable

50

-

-

... More
Supply, installation, testing and commissioning of PVC conduit 25mm dia

1500

-

-

... More
Supply, installation, testing and commissioning of Ethernet Cable

10

-

-

... More
MCC Panels Design, fabrication, supply, installation, testing, commissioning of 3 phase,4-wire,CRCA fabricated, duly powder coated power control centre (PCC)/motor control centre (MCC). Motor/power control centre , with all kind of required accessories as per the standard, attached single line diagram. MCC panel 01 for 3 nos chilled water Pumps & 2 nos additional spares. Incomer of 3 phase 72A, with outgoing of 3 phase 32A - 1nos & 1 phase 10A - 2nos, 3 nos. for pumps

1

-

-

... More
Design, fabrication, supply, installation, testing, commissioning of 3 phase,4-wire,CRCA fabricated, duly powder coated power control centre (PCC)/motor control centre (MCC).Motor/power control centre , with all kind of required accessories as per the standard, attached single line diagram. MCC panel 02 for chiller Incomer of 3 phase 180A, with outgoing of 3 phase 60A - 3nos

1

-

-

... More
Design, fabrication, supply, installation, testing, commissioning of 3 phase,4-wire,CRCA fabricated, duly powder coated power control centre (PCC)/motor control centre (MCC).Motor/power control centre , with all kind of required accessories as per the standard, attached single line diagram. MCC panel 03 for AHU, Dehumidifier & humidifier Incomer of 3 phase 160 A, with outgoing of 3 phase - 22A, 37A, 11A, 8A, 16A, 12A, 18A & 9A and 2 addtional spare 1 phase 16A spare

1

-

-

... More
Design, fabrication, supply, installation, testing, commissioning of 3 phase,4-wire,CRCA fabricated, duly powder coated power control centre (PCC)/motor control centre (MCC).Motor/power control centre , with all kind of required accessories as per the standard, attached single line diagram. MCC panel 04 for CDA, RO & N2 Incomer of 3 phase 180A, with outgoing of 3 phase - 32A-2nos, 15A, 30A, 20A & additional spares -3 Phase 32A & 1 Phase 10 A- 2nos

1

-

-

... More
Design, fabrication, supply, installation, testing, commissioning of 3 phase,4-wire,CRCA fabricated, duly powder coated power control centre (PCC)/motor control centre (MCC).Motor/power control centre , with all kind of required accessories as per the standard, attached single line diagram. MCC panel 05 for Exhaust Incomer of 3 phase 128 A, with outgoing of 3 phase 32A- 4 nos

1

-

-

... More
Starter Panel Supply, Installation, Testing and Commissioning of Starter panel consists of Selector switch, Push button , emergency stop & lamp.

1

-

-

... More
Distribution Boxes Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 01 of 3 phase 70A incomer with outgoing of 3 phase 16A- 2nos & 1 phase of 16A & 1 phase of 6A & additional spares 1phase 6A-2 nos

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 02 of 3 phase 108 A incomer with outgoing of 3 phase 32A- 3nos, additional 1 phase 6A-2 nos.

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 03 of 3 phase 44 A incomer with outgoing of 1 phase 32A & additional 1 phase of 6A-2nos

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 04 of 1 phase 78 A incomer with outgoing of 1 phase 16A- 3nos, 6A-3nos & additional 1 phase of 6A-2nos

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 05 of 3 phase 108 A incomer with outgoing of 1 phase 32A & 3 phase 32A and additional 3 phase of 32A, 6A-2nos

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 06 of 3 phase 140 A incomer with outgoing of 1 phase 32A & 3 phase 32A-3nos & additional 1 phase of 6A-2no

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 07 of 3 phase 64 A incomer with outgoing of 1 phase 6A-2nos and additional 1 phase of 10A-2nos & 3phase 32A

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 08 of 3 phase 40 A incomer with outgoing of 1 phase 10A- 2 nos and additional 1 phase of 10A-2nos

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 09 of 3 phase 20 A incomer with outgoing of additional 1 phase of 10A-2nos

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 10 of 3 phase 23A incomer with outgoing of 3 phase 5A & additional 1 phase of 6A-3nos

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 11 of 3 phase 118A incomer with outgoing of 3 phase 16A, and additional 1 phase of 6A-12 nos, 10A- 3nos

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. Cleanroom light DB consists of MCBs (1 pole, 6A)-6nos , 125mA current leakage RCCB (2 pole,36 A)-1no.

1

-

-

... More
Distribution Box Electrical panel: Design, fabrication, supply, installation, testing, commissioning of 3 phase & 1 phase, 4-wire/ 2 wire stranded, CRCA fabricated, duly powder coated distribution box shall be as per our specification, attached single line diagram. DB 12 of 3 phase 79A incomer with outgoing of 1 phase 5A-3nos, 10A, 6A, 20A, 15A & 3 phase 6A.

1

-

-

... More
Industrial power socket boxes Supply, Installation, Testing and commissioning of cleanroom compatible industrial power socket box consists of MCB's and all other required accessories. Industrial socket box 01of 3 phase 16A- 2nos & 1 phase of 16A & 1 phase of 6A & additional spares 1phase 6A-2 nos

1

-

-

... More
Supply, Installation, Testing and commissioning of cleanroom compatible industrial power socket box consists of MCB's and all other required accessories. Industrial socket box 02 of 3 phase 32A- 3nos, additional 1 phase 6A-2 nos.

1

-

-

... More
Supply, Installation, Testing and commissioning of cleanroom compatible industrial power socket box consists of MCB's and all other required accessories. Industrial socket box 03 of 1 phase 32A & additional 1 phase of 6A-2nos

1

-

-

... More
Supply, Installation, Testing and commissioning of cleanroom compatible industrial power socket box consists of MCB's and all other required accessories. Industrial socket box 04 of 1 phase 16A- 3nos, 6A- 3nos & additional 1 phase of 6A-2nos

1

-

-

... More
Industrial socket box 05 of f 1 phase 32A & 3 phase 32A and additional 3 phase of 32A, 6A-2nos

1

-

-

... More
Supply, Installation, Testing and commissioning of cleanroom compatible industrial power socket box consists of MCB's and all other required accessories. Industrial socket box 06 of 1 phase 32A & 3 phase 32A-3nos & additional 1 phase of 6A-2no

1

-

-

... More
Industrial socket box 07 of 1 phase 6A-2nos and additional 1 phase of 10A-2nos & 3phase 32A

1

-

-

... More
Supply, Installation, Testing and commissioning of cleanroom compatible industrial power socket box consists of MCB's and all other required accessories. Industrial socket box 08 of 1 phase 10A- 2 nos and additional 1 phase of 10A-2nos

1

-

-

... More
Supply, Installation, Testing and commissioning of cleanroom compatible industrial power socket box consists of MCB's and all other required accessories. Industrial socket box 09 of additional 1 phase of 10A-2nos

1

-

-

... More
Supply, Installation, Testing and commissioning of cleanroom compatible industrial power socket box consists of MCB's and all other required accessories. Industrial socket box 10 of 3 phase 5A & additional 1 phase of 6A-3nos

1

-

-

... More
Supply, Installation, Testing and commissioning of cleanroom compatible industrial power socket box consists of MCB's and all other required accessories. Industrial socket box 11 of 3 phase 16A, and additional 1 phase of 6A-12 nos, 10A- 3nos

1

-

-

... More
Supply, Installation, Testing and commissioning of cleanroom compatible industrial power socket box consists of MCB's and all other required accessories. Industrial socket box 12 of 1 phase 5A-3nos, 10A, 6A, 20A, 15A & 3 phase 6A.

1

-

-

... More
Power Cables Supply, Installation, Testing and commissioning of PVC insulated, FRLS PVC sheathed, power cable of 4Cx 150 sq mm Cu conductor, unarmoured cable

15

-

-

... More
Supply, Installation, Testing and commissioning of PVC insulated, FRLS PVC sheathed, power cable of 4Cx 95 sq mm Cu conductor, unarmoured cable

15

-

-

... More
Supply, Installation, Testing and commissioning of PVC insulated, FRLS PVC sheathed, power cable of 4Cx 50 sq mm Cu conductor, unarmoured cable

15

-

-

... More
Supply, Installation, Testing and commissioning of PVC insulated, FRLS PVC sheathed, power cable of 4Cx 300 sq mm Cu conductor, unarmoured cable

68

-

-

... More
End termination cables Supply, Installation, Testing & Commissioning for end termination of 4C x 50 sqmm Cu conductor, unarmoured cable

40

-

-

... More
Supply, Installation, Testing & Commissioning for end termination of 4C x 25 sqmm Cu conductor, unarmoured cable

90

-

-

... More
Supply, Installation, Testing & Commissioning for end termination of 4C x 16 sqmm Cu conductor, unarmoured cable

70

-

-

... More
Supply, Installation, Testing & Commissioning for end termination of 4Cx 10 sq mm Cu conductor, unarmoured cable

30

-

-

... More
Supply, Installation, Testing & Commissioning for end termination of 4Cx 6 sq mm Cu conductor, unarmoured cable

40

-

-

... More
Supply, Installation, Testing & Commissioning for end termination of 4Cx 4 sq mm Cu conductor, unarmoured cable

280

-

-

... More
Supply, Installation, Testing & Commissioning for end termination of 2Cx 1.5sqmm Cu conductor, unarmoured cable

90

-

-

... More
Cable trays Fabrication, Supply & Installation of 2mm thick hot dip galvanised cable trays at all levels of 150 x 75 mm

150

-

-

... More
Fabrication, Supply & Installation of 2mm thick hot dip galvanised cable trays at all levels of 100 x 50mm

800

-

-

... More
Earthing strips Supply and laying GI earthing strip / wire with accessories in cable tray / wall/ floor. Size 25 x 4 mm

150

-

-

... More
GI pipe 20mm

8

-

-

... More
Access control & CCTV Supply & Installation of ESSL C3 100/200 DOOR ACCESS CONTROL with X990 T&A Device integrated inclusive of 12V, 10AMPS SMPS & Enclosure Set & Fingerprint registering USB device. Card Holders Capacity : 30,000 Log Events Capacity : 100,000 Communication : TCP/IP and RS-485 Number of Exit Readers/Push Button Supported : 2 #Software and Database Supported : Access Security System 3.5 (Desktop Version) Database Type:- MS Access / MS SQL #Including full setup of below items: -Door Emlock & Mechanical parts. -Applicable L/U Brackets -Device Power Adapter and accessories -Glass break unit integration with Fire Panel & Access Controller -Fixing of Emlock/Electric Lock along with parts integration. -Testing & Commissioning -Issue of Desktop version with software license inclusive of software installation, device operation training & software report module training.

1

-

-

... More
Bio Mini USB based Fingerprint registration module

1

-

-

... More
Supply & Installation of Network Video Recorder -Up to 16-ch IP camera inputs -H.265+/H.265/H.264+/H.264 video formats -1 HDMI and 1 VGA interfaces, both interfaces support independent video output -2 SATA interfaces for HDD connection (up to 10 TB capacity per HDD) -Up to 256 Mbps incoming bandwidth

1

-

-

... More
Supply & Installation of Dome; 4-inch 2 MP 25X Powered by Dark Fighter IR Network Speed Dome -1/2.8" progressive scan CMOS -High quality imaging with 2 MP resolution Excellent low-light performance with powered-by Dark Fighter technology -25× optical zoom and 16× digital zoom provide close up views over expansive areas -WDR, HLC, BLC, 3D DNR, defog, regional exposure, regional focus -Expansive night view with up to 30 m IR distance -Support H.265+/H.265 video compression

8

-

-

... More
Supply & Installation of Active Pixel/Secureye 16+2 PORT 10/100 POE Network Switch -For Camera Power+ Data commissioning.

1

-

-

... More
Supplying and installation of 43" inch Direct-Lit 4K Crystal UHD LED Display TV

1

-

-

... More
Supply, Installation, Testing and commissioning of CAT 6 cable along with other fixing accessories.

365

-

-

... More
Supply, Installation, Testing and commissioning of 16 Port Network Video Recorder (NVR): • Up to 5 Megapixels resolution recording • HDMI and VGA output at up to 1920×1080P resolution • 16-ch network cameras can be connected with 30m incoming bandwidth • Up to 2 SATA interfaces

1

-

-

... More
Supply, Installation, Testing, and commissioning of HDD Internal 2TB Surveillance.

1

-

-

... More
Supply, Installation, Testing, and commissioning of I/O Box with installation with SMB

1

-

-

... More
Supply, Installation, Testing, and commissioning 9U rack for NVR and switch mounting

1

-

-

... More
Supply, Installation, Testing, and commissioning of 2 core 1.5 sq. mm wire

90

-

-

... More
Fire Alarm System Supply, Installation, Testing, and commissioning of Smoke detector for the fire alarm system

13

-

-

... More
Supply, Installation, Testing, and commissioning of Oxygen level monitor for the fire alarm system

5

-

-

... More
Supply, Installation, Testing, and commissioning of Junction box for smoke detector for the fire alarm system

2

-

-

... More
Supply, Installation, Testing and commissioning of copper power Cable 1.5 sqmm 2 core for the fire alarm system

200

-

-

... More
Supply, Installation, Testing, and commissioning of 2 pair shielded cable 1.5 sqmm for communication for the fire alarm system

80

-

-

... More
Supply & Installation of Fire Panel Conventional 4 Zone Based With Access Control Along with 2 nos. 7AH Batteries for the fire alarm system

1

-

-

... More
Supply, Installation, Testing, and commissioning of 20 pair 1.5 sqmm for communication for the fire alarm system

50

-

-

... More
Supply Panel for Gases Supply, Installation, Testing and commissioning of single cylinder gas supply panel for Ar to safely regulate the pressure of gas present in cylinder to the pressure required at point of use. The gas supply panel consists of the following components: 1) Isolation valve 2) Vent arrangement 3) Pressure Regulator 4) Safety relief valve 5) inlet Filter - 0.5 um and outlet filters- 0.003um 6) Pressure gauges All these components are to be assembled on an SS plate inside a class 100 cleanroom environment. The panels will be undergo 5 step testing and validation process for pressure test, Helium leak test, Trace moisture test, Trace oxygen & particle count.

1

-

-

... More
Supply, Installation, Testing and commissioning of single cylinder gas supply panel for He to safely regulate the pressure of gas present in cylinder to the pressure required at point of use. The gas supply panel consists of the following components: 1) Isolation valve 2) Vent arrangement 3) Pressure Regulator 4) Safety relief valve 5) inlet Filter - 0.5 um and outlet filters- 0.003um 6) Pressure gauges All these components are to be assembled on an SS plate inside a class 100 cleanroom environment. The panels will be undergo 5 step testing and validation process for pressure test, Helium leak test, Trace moisture test, Trace oxygen & particle count.

1

-

-

... More
Supply, Installation, Testing and commissioning of single cylinder gas supply panel for CF4 to safely regulate the pressure of gas present in cylinder to the pressure required at point of use. The gas supply panel consists of the following components: 1) Isolation valve 2) Vent arrangement 3) Pressure Regulator 4) Safety relief valve 5) inlet Filter - 0.5 um and outlet filters- 0.003um 6) Pressure gauges All these components are to be assembled on an SS plate inside a class 100 cleanroom environment. The panels will be undergo 5 step testing and validation process for pressure test, Helium leak test, Trace moisture test, Trace oxygen & particle count.

1

-

-

... More
Supply, Installation, Testing and commissioning of single cylinder gas supply panel for CHF3 to safely regulate the pressure of gas present in cylinder to the pressure required at point of use. The gas supply panel consists of the following components: 1) Isolation valve 2) Vent arrangement 3) Pressure Regulator 4) Safety relief valve 5) inlet Filter - 0.5 um and outlet filters- 0.003um 6) Pressure gauges All these components are to be assembled on an SS plate inside a class 100 cleanroom environment. The panels will be undergo 5 step testing and validation process for pressure test, Helium leak test, Trace moisture test, Trace oxygen & particle count.

1

-

-

... More
Supply, Installation, Testing and commissioning of single cylinder gas supply panel for SF6 to safely regulate the pressure of gas present in cylinder to the pressure required at point of use. The gas supply panel consists of the following components: 1) Isolation valve 2) Vent arrangement 3) Pressure Regulator 4) Safety relief valve 5) inlet Filter - 0.5 um and outlet filters- 0.003um 6) Pressure gauges All these components are to be assembled on an SS plate inside a class 100 cleanroom environment. The panels will be undergo 5 step testing and validation process for pressure test, Helium leak test, Trace moisture test, Trace oxygen & particle count.

1

-

-

... More
Supply, Installation, Testing and commissioning of single cylinder gas supply panel for O2 to safely regulate the pressure of gas present in cylinder to the pressure required at point of use. The gas supply panel consists of the following components: 1) Isolation valve 2) Vent arrangement 3) Pressure Regulator 4) Safety relief valve 5) inlet Filter - 0.5 um and outlet filters- 0.003um 6) Pressure gauges All these components are to be assembled on an SS plate inside a class 100 cleanroom environment. The panels will be undergo 5 step testing and validation process for pressure test, Helium leak test, Trace moisture test, Trace oxygen & particle count.

1

-

-

... More
Supply, Installation, Testing and commissioning of single cylinder gas supply panel for N2 to safely regulate the pressure of gas present in cylinder to the pressure required at point of use. The gas supply panel consists of the following components: 1) Isolation valve 2) Vent arrangement 3) Pressure Regulator 4) Safety relief valve 5) inlet Filter - 0.5 um and outlet filters- 0.003um 6) Pressure gauges All these components are to be assembled on an SS plate inside a class 100 cleanroom environment. The panels will be undergo 5 step testing and validation process for pressure test, Helium leak test, Trace moisture test, Trace oxygen & particle count.

1

-

-

... More
Supply, Installation, Testing and commissioning of 4 cylinder gas supply panel for N2 to safely regulate the pressure of gas present in cylinder to the pressure required at point of use. The gas supply panel consists of the following components: 1) Isolation valve 2) Vent arrangement 3) Pressure Regulator 4) Safety relief valve 5) inlet Filter - 0.5 um and outlet filters- 0.003um 6) Pressure gauges All these components are to be assembled on an SS plate inside a class 100 cleanroom environment. The panels will be undergo 5 step testing and validation process for pressure test, Helium leak test, Trace moisture test, Trace oxygen & particle count.

1

-

-

... More
Diaphragm Valve Supply, Installation, Testing and commissioning of 1/4" low pressure diaphragm valve MVCR end

3

-

-

... More
Gas Cylinders Supply of gas cylinder for Ar, capacity 47 litre 5N grade

2

-

-

... More
Supply of gas cylinder for He, capacity 47 litre 5N grade

2

-

-

... More
Supply of gas cylinder for CF4, capacity 47 litre 5N grade

2

-

-

... More
Supply of gas cylinder for CHF3, capacity 47 litre 5N grade

2

-

-

... More
Supply of gas cylinder for SF6, capacity 47 litre 5N grade

2

-

-

... More
Supply of gas cylinder for O2, capacity 47 litre 5N grade

2

-

-

... More
Supply of gas cylinder for N2, capacity 47 litre 5N grade

6

-

-

... More
Gas Cabinets Supply, Installation, Testing and commissioning of Gas cabinet for Cl2 & BCl3 for safely regulating the pressure of gas present in cylinder to the pressure required at point of use. The gas cabinet consists of the following components: 1) Isolation valve 2) Vent & purge arrangement 3) Pressure Regulator 4) Safety relief valve 5) inlet and outlet filters 6) Pressure gauges 7) Vacuum generator 8) Pressure transducer 9) Check valve 10) Emergency shut off valve 11) Excess flow switch 12) Restricted orifice 13) Sprinkler 14) Gas Leak Detector 15) ROR sensor 16) Exhaust Differential Pressure Switch All these components are to be assembled on an SS plate inside a Class 100 cleanroom environment complying to SEMI standards. The gas panels will be mounted inside an enclosure that is constantly exhausted and monitored. The gas cabinet will house a gas specific self-suction type gas leak detector. The enclosure shall be made of cold rolled sheet and have a explosion proof glass for viewing the panels. The panels will be undergo 5 step testing and validation process for pressure test, Helium leak test, Trace moisture test, Trace oxygen & particle count.

1

-

-

... More
Supply, Installation, Testing and commissioning of Gas cabinet for H2 for safely regulating the pressure of gas present in cylinder to the pressure required at point of use. The gas cabinet consists of the following components: 1) Isolation valve 2) Vent & purge arrangement 3) Pressure Regulator 4) Safety relief valve 5) inlet and outlet filters 6) Pressure gauges 7) Vacuum generator 8) Pressure transducer 9) Check valve 10) Emergency shut off valve 11) Excess flow switch 12) Restricted orifice 13) Sprinkler 14) Gas Leak Detector 15) ROR sensor 16) Exhaust Differential Pressure Switch All these components are to be assembled on an SS plate inside a Class 100 cleanroom environment complying to SEMI standards. The gas panels will be mounted inside an enclosure that is constantly exhausted and monitored. The gas cabinet will house a gas specific self-suction type gas leak detector. The enclosure shall be made of cold rolled sheet and have a explosion proof glass for viewing the panels. The panels will be undergo 5 step testing and validation process for pressure test, Helium leak test, Trace moisture test, Trace oxygen & particle count.

1

-

-

... More
Supply, Installation, testing and commissioning of PLC Controller for the cabinets with HMI with all other necessary accessories like emergency shutdown, etc.

1

-

-

... More
Heating Jacket Supply, Installation and testing of heating jacket for supplied BCl3 cylinder

1

-

-

... More
Gas Detector Supply, Installation and testing of gas detector in Cleanroom

1

-

-

... More
Supply, Installation and testing of gas detector in Cleanroom

1

-

-

... More
Supply, Installation and testing of Oxygen Depletion Sensor

2

-

-

... More
Point of use sticks Supply, Installation and testing of 1/4" point of use stick including the following: - Pressure regulator - Pressure gauge - Diaphragm valves - Non return valve - VCR gland with nut & gasket.

8

-

-

... More
Flash Pack arrestor Supply, Installation, and testing of point of flash pack arrestor for Oxygen gas supply panel and Hydrogen gas cabinet. MOC: BRASS INLET: 1/4 NPT FEMALE OUTLET: 1/4 NPT FEMALE SAFETY ELEMENTS : FA,NV, TV 105"C Pressure 10 Bar

4

-

-

... More
Gas purifier Supply, Installation, and testing of the SS316 purifier of size 1/4" for Cl2 & BCl3 gas cabinet. The flow rate of 2 LPM with a pressure range of 800 PSIG.

2

-

-

... More
Supply, Installation, and testing of the SS316 purifier of size 1/4" for N2 supply panel. The maximum flow rate of 75 LPM with a pressure range of 600 PSIG.

1

-

-

... More
Heat Tracing Cable Supply, Installation, and testing of point of heat tracing for Cl2 and BCl3 gas cabinet and tube for maintaining temperature at 40 °C.

98.88

-

-

... More
SS316L EP Tube Supply, Installation, and testing of SS316L electropolished Tubes of 1/4" Upon installation completion, the tubes shall undergo 5 step testing and validation. The steps are : - Pressure hold test ( 0 psi drop over 24 hours) - Helium leak check ( 10^-9 mbar l/sec) - Trace oxygen ( 10ppm) - Trace moisture ( 10ppm) - Trace Particle ( 0.1 micron)

330.8

-

-

... More
Co-axial EP Tube Supply, Installation, and testing of Coaxial Tubes of 1/4" X 1/2" along with associated fittings. Upon installation completion, the tubes shall undergo 5 step testing and validation. The steps are: - Pressure hold test ( 0 psi drop over 24 hours) - Helium leak check ( 10^-9 mbar l/sec) - Trace oxygen ( 1ppm) - Trace moisture ( 1ppm) - Trace Particle ( 0.1 micron)

70.4

-

-

... More
Co- axial pressure swtich Supply, Installation, and testing of Co- axial pressure swtich consisting of - Pressure Switch - Diaphragm valves - VCR gland with nut & gasket. -VCR blind nut - Fittings

2

-

-

... More
Nitrogen Generator Supply, Installation, Testing, and commissioning of 99.999% purity Nitrogen generator of capacity 20 LPM at 6 bar outlet pressure, bidder shall consider oxygen & moisture analysers and a SS nitrogen storage tank of 200 Litres capacity as per the ASME standard. 20 LPM@ 6 bar outlet pressure or more.

1

-

-

... More
N2 Storage Tank 200L Storage tank, MOC - SS304 with Pressure gauge, auto drain, isolation valve, Relief valve

1

-

-

... More
Diaphragm Valve Supply, Installation, Testing and commissioning of low pressure diaphragm valve MVCR end 1/2"

6

-

-

... More
Supply, Installation, Testing and commissioning of low pressure diaphragm valve MVCR end 1/4"

19

-

-

... More
Nitrogen Spray guns- MOC: PTFE

2

-

-

... More
Pressure regulator Pressure regulator with in & out pressure gauges NPT end 1/4" Pressure regulator NPT end

13

-

-

... More
Pressure regulator with in & out pressure gauges NPT end 1/2" Pressure regulator NPT end

3

-

-

... More
Pressure gauge 1/4"

15

-

-

... More
Non retrun valve 1/4"

13

-

-

... More
SS316L EP Tubing Supply, Installation, Testing, and commissioning of SS316L electropolished Tubes of 1/4" Upon installation completion, the tubes shall undergo 5 step testing and validation. The steps are : - Pressure hold test ( 0 psi drop over 24 hours). - Helium Leak check 10 -9 mbar l/sec - Trace oxygen 10 ppm - Trace moisture 10 ppm - Trace particle 0.1 micron

146.3

-

-

... More
Supply, Installation, Testing, and commissioning of SS316L electropolished Tubes of 1/2" Upon installation completion, the tubes shall undergo 5 step testing and validation. The steps are : - Pressure hold test ( 0 psi drop over 24 hours). - Helium Leak check 10 -9 mbar l/sec - Trace oxygen 10 ppm - Trace moisture 10 ppm - Trace particle 0.1 micron

100.1

-

-

... More
Dryer with filter for N2 Generator Supply, Installation, Testing, and commissioning of Desiccant type drier with filter for the inlet of N2 generator Heatless and heat regenerative dryer that works on pressure swing adsorption or thermal swing adsorption. Must be capable of operating above 12 bar @400lpm. Should be of vertical design with minimum pressure drop. Should include an equivalent controller and auto drain. Pressure dew point of (-)40°C to be attained using this drier. Coalescing filters for the removal of dirt, oil and water (Liquid, aerosol & vapour form), made of activated carbon and borosilicate microfiber material. Three stage filtration is required using 3 um filter, fine filter 0.1um and micro filter 0.01um as well as 0.01um activated carbon filter. Must be suitable for use above 400L/min @12 bar.

1

-

-

... More
Oil Free Air Compressor Supply, Installation, Testing, and commissioning of Air cooled oil free scroll compressor with Desiccant Drier & particle filter to achieve dew point of ADP (-40)°C and 24 m3/hr ( 400 l/min @ 10 bar).

1

-

-

... More
Dryer with filter for CDA Supply, Installation, Testing, and commissioning of Desiccant type drier with filter for CDA. Heatless and heat regenerative dryer that works on pressure swing adsorption or thermal swing adsorption. Must be capable of operating above 12 bar @400lpm. Should be of vertical design with minimum pressure drop. Should include an equivalent controller and auto drain. Pressure dew point of (-) 40°C to be attained using this drier. Coalescing filters for the removal of dirt, oil and water (Liquid, aerosol & vapour form), made of activated carbon and borosilicate microfiber material. Three stage filtration is required using 5 um filter, fine filter 1um and micro filter .01um as well as 0.01um activated carbon filter. Must be suitable for use above 400L/min @12 bar.

1

-

-

... More
200L Storage tank, MOC - SS with Pressure gauge, auto drain, isolation valve, Relief valve

2

-

-

... More
SS Ball Valves Supply, Installation, Testing and commissioning of stainless-steel ball valve of 1/2"

3

-

-

... More
Supply, Installation, Testing and commissioning of stainless-steel ball valve of 1/4"

19

-

-

... More
Pressure regulator Pressure regulator with in & out pressure gauges NPT end-1/2"

4

-

-

... More
SS316L BA Tube Supply, Installation and testing of SS 316L BA Tubes of 1/4" Upon installation completion, the tubes shall undergo 5 step testing and validation. The steps are : - Pressure hold test ( 0 psi drop over 24 hours). - Helium Leak check 10 -9 mbar l/sec - Trace oxygen 10 ppm - Trace moisture 10 ppm - Trace particle 0.1 micron

125

-

-

... More
Supply, Installation and testing of SS 316L BA Tubes of 1/2" Upon installation completion, the tubes shall undergo 5 step testing and validation. The steps are : - Pressure hold test ( 0 psi drop over 24 hours). - Helium Leak check 10 -9 mbar l/sec - Trace oxygen 10 ppm - Trace moisture 10 ppm - Trace particle 0.1 micron

130

-

-

... More
Deionized water unit Supply, installation, testing and commissioning of DI system should be: Resistivity at 25C should be 18.2 Megaohm-cm Total Organic Carbon (TOC) 5 ppb Dispense rate should be up to 2 l/min DI storage tank of 50 litres (PPH) RO storage Tank - 200 Litres (PP) Flow capacity 2 LPM Two remote dispense units (with 5 meter long tubing for each) in addition to main unit are required as per SLD

1

-

-

... More
Ball Valve Supply, installation, testing and commissioning of threaded end, PN 10 high purity PPH ball valve. 25mm

2

-

-

... More
Ball Valve Supply, installation, testing and commissioning of threaded end, PN 8 high purity UPVC ball valve 1"

1

-

-

... More
Supply, installation, testing and commissioning of threaded end, PN 8 high purity UPVC ball valve 1/2"

2

-

-

... More
PPH 3 way diaphragm valve Supply, installation, testing and commissioning of threaded end, PN 10 high purity PPH 3 way diaphragm valve of size 1" x 1/2" x 1"

3

-

-

... More
PPH Pipe Supply, installation, testing and commissioning of PN 10 High purity PPH pipe of 25mm

30

-

-

... More
Supply, installation, testing and commissioning of PN 10 High purity PPH pipe of 15mm

30

-

-

... More
UPVC Pipe Supply, installation, testing and commissioning of PN 6 high purity UPVC pipe of 25mm

55

-

-

... More
Supply, installation, testing and commissioning of PN 6 high purity UPVC pipe of 15mm

20

-

-

... More
Guns Supply, installation, testing and commissioning of DI water PPH gun of 1/2"

2

-

-

... More
General Exhaust Blower Supply and Installation of SISW centrifugal low noise level Blower housing shall be made of PPFRP. Pedestal and base frame of blowers is M.S epoxy painted/powdered coated. Impeller with dynamic balancing. Motor make CG/ABB. (IE2) 2100 m3/hr @ 150mmwg (1 Working + 1 Standby )

2

-

-

... More
Wet Scrubber Supply and installation of Vertical type wet scrubber with liquid recirculation tank, recirculation pump dosing tank & dosing pump, PH sensor with the transmitter, exhaust sensor, differential pressure switch, exhaust blower (1w+ 1s) of the static pressure of 200mmwg and stack. Material: PP-FRP, Pressure drop across the scrubber column should be below 50mm wg (approx.), The design velocity for the scrubber column shall be 1.5 m/s. Interconnection piping between the scrubber, Re-circulation tank, and Dosing tank shall be considered. complete with makeup water connection with control valve, water level indicator, drain with control valve, overflow pipe, scrubber recirculation pump without Mechanical seal, inlet flange connection with 'Y' Strainer, outlet flanged connections with nonreturn valve (NRV), Ball valve with gaskets & bolt nuts, single stage PP packing rings. The blower stack shall be 7M in height. liquid spray nozzle system , Including Dosing Plug with Valve, Mounting Bolt & Nuts with Anti Vibration Pads,. Scrubber Pump of suitable motor rating, 3phase 50Hz, 415Volts. Including all pumps cover, Ladders. @ 2100 m3/hr

1

-

-

... More
Solvent Scrubber Supply and installation of Vertical type Solvent scrubber with liquid recirculation tank, recirculation pump dosing tank & dosing pump, PH sensor with the transmitter, exhaust sensor, differential pressure switch, exhaust blower (1w+ 1s) of the static pressure of 200mmwg and stack. Material: PP-FRP, Pressure drop across the scrubber column should be below 50mm wg (approx.), The design velocity for the scrubber column shall be 1.5 m/s. Interconnection piping between the scrubber, Re-circulation tank, and Dosing tank shall be considered. complete with makeup water connection with control valve, water level indicator, drain with control valve, overflow pipe, scrubber recirculation pump without Mechanical seal, inlet flange connection with 'Y' Strainer, outlet flanged connections with nonreturn valve (NRV), Ball valve with gaskets & bolt nuts, single stage PP packing rings. The blower stack shall be 7M in height. liquid spray nozzle system , Including Dosing Plug with Valve, Mounting Bolt & Nuts with Anti Vibration Pads,. Scrubber Pump of suitable motor rating, 3phase 50Hz, 415Volts. Including all pumps cover, Ladders. @ 800 m3/hr

1

-

-

... More
Wet etching hood Supply, installation, testing and commissioning of wet etching hood of size 2.5 X 1.5 m having 2 sinks - one for acids and one for alkali. It must have a flat 10 mm thick polypropylene worktop at a standard workable height with a skirting of 10 mm height to contain any spills on the work top and prevent spilling on the floor. MOC of wet bench construction shall be of PP of suitable grade of min. 10 mm thickness. Wet bench will have all the standard accessories like sockets -3 Nos. (all the controls to be on one side of the hood), lifting setup will include clear transparent height adjustable counter-weight balanced sash made of acid resistant material that is at least 6mm in thickness -1 Nos., lighting on Top, Magnehelic gauge, drain ports & isolation valve, exhaust port with volume control damper and fresh air supply through FFU consisting of HEPA filter of H14 grade. Hood must include all the fittings for routing the exhaust duct. The bench will consist of two stage storage cabinet below the top. Electrical panel should be supplied for the blowers with all the protection devices, start/stop button and indication lights.

1

-

-

... More
Developer hood Supply, installation, testing and commissioning of Developer hood of size 2.5 X 1.5 m. Supply and installation of developer hood of at a standard workable height; made of white polypropylene material of min. 10 mm thickness with all the standard accessories like sockets -3 Nos. (all the controls to be on one side of the hood), lifting setup will include clear transparent height adjustable counter-weight balanced sash made of solvent resistant material that is at least 6mm in thickness -1 Nos., UV free Yellow lighting to filter light with wavelength of 500 nm on Top, including 2 sinks, Magnehelic gauge, drain port & isolation valve, exhaust port with volume control damper at the rear end of the bench and a FFU with HEPA filter of H14 grade for the supply of air to the hood. Hood must include all the fittings for routing the exhaust duct. The hood will consist of two stage storage cabinet below the top. Electrical panel should be supplied for the blowers with all the protection devices, start/stop button and indication lights.

1

-

-

... More
FRP Ducts Supply, installation, testing and commissioning of FRP duct of ID 1.5" with 2mm Thickness

14

-

-

... More
Supply, installation, testing and commissioning of FRP duct of ID 2" with 2mm Thickness

7.7

-

-

... More
Supply, installation, testing and commissioning of FRP duct of ID 3" with 2mm Thickness

7.7

-

-

... More
Supply, installation, testing and commissioning of FRP duct of ID 4" with 2mm Thickness

7.7

-

-

... More
Supply, installation, testing and commissioning of FRP duct of ID 5" with 2mm Thickness

49.5

-

-

... More
Supply, installation, testing and commissioning of FRP duct of ID 12" with 5mm thickness

68

-

-

... More
PPFRP Ducts Supply, installation, testing and commissioning of PPFRP duct of 3mm PP thickness & 3mm FRP thickness, ID 1/2"

38

-

-

... More
Supply, installation, testing and commissioning of PPFRP duct of 3mm PP thickness & 3mm FRP thickness, ID 3"

14

-

-

... More
Supply, installation, testing and commissioning of PPFRP duct of 3mm PP thickness & 3mm FRP thickness, ID 4"

35

-

-

... More
Supply, installation, testing and commissioning of PPFRP duct of 3mm PP thickness & 3mm FRP thickness, ID 5"

7

-

-

... More
Supply, installation, testing and commissioning of PPFRP duct of 3mm PP thickness & 3mm FRP thickness, ID 8"

50

-

-

... More
Supply, installation, testing and commissioning of PPFRP duct of 3mm PP thickness & 3mm FRP thickness, ID 12"

67

-

-

... More
Non return valves Supply, installation, testing and commissioning of PP non return valve with flanges and other accessories of 12"

3

-

-

... More
Supply, installation, testing and commissioning of PP non return valve with flanges and other accessories of 8"

1

-

-

... More
PP Dampers Supply, installation, testing and commissioning of PP volume control damper with flanges and other accessories of 1.5"

2

-

-

... More
Supply, installation, testing and commissioning of PP volume control damper with flanges and other accessories of 2"

1

-

-

... More
Supply, installation, testing and commissioning of PP volume control damper with flanges and other accessories of 3"

1

-

-

... More
Supply, installation, testing and commissioning of PP volume control damper with flanges and other accessories of 4"

1

-

-

... More
Supply, installation, testing and commissioning of PP volume control damper with flanges and other accessories of 5"

2

-

-

... More
Supply, installation, testing and commissioning of PP volume control damper with flanges and other accessories of 12"

2

-

-

... More
PPFRP Dampers Supply, installation, testing and commissioning of PPFRP volume control damper with flanges and other accessories of 3"

2

-

-

... More
Supply, installation, testing and commissioning of PPFRP volume control damper with flanges and other accessories of 4"

4

-

-

... More
Supply, installation, testing and commissioning of PPFRP volume control damper with flanges and other accessories of 5"

1

-

-

... More
Supply, installation, testing and commissioning of PPFRP volume control damper with flanges and other accessories of 8"

2

-

-

... More
Supply, installation, testing and commissioning of PPFRP volume control damper with flanges and other accessories of 12"

1

-

-

... More
UPVC Pipe Supply, installation, testing and commissioning of UPVC pipe for drain piping and makeup water piping of pressure rating 10 BAR and dia 1/4"

10

-

-

... More
Supply, installation, testing and commissioning of UPVC pipe for drain piping and makeup water piping of pressure rating 10 BAR and dia 1"

45

-

-

... More
Ball valve Supply, installation, testing and commissioning of UPVC thread end connection Ball Valve, with connector and coupling of 1/4" dia

4

-

-

... More
Supply, installation, testing and commissioning of UPVC thread end connection Ball Valve, with connector and coupling of 1" dia

1

-

-

... More
Non return valve Supply, installation, testing and commissioning of UPVC thread end connection non return valve opens a medium to flow in only one direction, with all type of connectors and coupling of 1"

1

-

-

... More
PP pipe Supply, installation, testing and commissioning of PP pipe of pressure rating 8 BAR of dia 1/4"

4

-

-

... More
Supply, installation, testing and commissioning of PP pipe of pressure rating 8 BAR of dia 1/2"

16

-

-

... More
Ball valve Supply, installation, testing and commissioning of PP thread end connection Ball Valve, with connector and coupling for 1/4"

1

-

-

... More
Supply, installation, testing and commissioning of PP thread end connection Ball Valve, with connector and coupling for 1/2"

1

-

-

... More
Non return valve Supply, installation, testing and commissioning of PP thread end connection non return valve opens a medium to flow in only one direction, with all type of connectors and coupling of 1/4"

1

-

-

... More
Structural Supports Supply, installation, testing and commissioning of Intermittent Structure and secondary MS structure like angle, I beam, C channels for structure support of duct, pipe, cable tray, tube etc. including unistrut, threadrod, fastner and pipe clamps. MS Channels must be coated with red oxide followed by two coats of cleanroom compatible synthetic enamel.

10000

-

-

... More
Sprinkler system for Gas Cabinet Storage Tank-Supply, installation, and testing of 1000 liter triple layer Syntex water storage tank with make-up connection, Outlet Connection and drain connection. Tank also should have a float Valve and low-level switch and a Stand for mounting the tank. Required for sprinkler system for the gas cabinets.

1

-

-

... More
Centrifugal Pump Supply, Installation, testing, and commissioning of horizontal split casing type centrifugal pump-motor sets of 120GPM @ 20 m WC capacity complete with nitrile rubber insulation, VFD compatible electrical motor, with pressure transmitter and contro panel with starter and other associated standard accessories.

1

-

-

... More
GI Piping Supply, installation, testing and commissioning of GI piping of following sizes & C class for chilled water system complete with all required flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding and supports etc. NB 40 mm class C

12

-

-

... More
Supply, installation, testing and commissioning of GI piping of following sizes & C class for chilled water system complete with all required flanges, fittings, gaskets, fasteners, Nitrile rubber insulation covered with aluminium cladding and supports etc. NB 25 mm class C

21

-

-

... More
Ball valve/ Drain valve Supply, installation, testing and commissioning of threaded end, PN 16/class-150, CI ball valves of following sizes for chilled water system complete with all required nipples, fittings, Nitrile rubber insulation covered with aluminium cladding etc.

2

-

-

... More
Fire Extinguisher Supply, installation, testing of ABC type Fire Extinguisher of 4Kgs. Capacity, made from the brand new seamless cylinder, as per IS and CCE approved, fitted with hose and horn and Squeeze Grip Valve with initial Charge of Dry chemical powder conforming to IS and Extinguisher ISI Mark along with mounting Bracket.

32

-

-

... More
Emergency eye wash and shower Supply, installation and emergency eye shower emergency showers is 75.5L/ min for at least 5 minutes. The same applies for showers in shower-eyewash combination units. Plumbed and self-contained eyewash stations, and those in combination units, must flow at a minimum of 1.5L/ min for 5 minutes; plumbed or self-contained eye and face wash stations at 11.4L/ min for 5 minutes. The flow of any supplementary equipment, such as a hand-held drench hose, must be low enough to be non-injurious to the user.

1

-

-

... More
Public Address system Supply ,installation, testing & commissioning of Call station with Ten zone selection keys, Voice controller/router, all-call key and momentary PTT-key for calls and with selectable gain, speech filter, limiter, Microphone for announcement, multizone paging system and output level for improved intelligibility, LED indications for zone selection, fault, and emergency state as per the technical specification.

1

-

-

... More
Supply, installation, testing & commissioning power amplifier with 8 Channel output in a 2U high housing with 70 V / 100 V and 8 ohm outputs, Dual inputs with priority switching,100 V input for slave operation on 100 V speaker line, Mains, battery back-up, and pilot tone supervision, TÜV certified according to IEC 60849.

1

-

-

... More
Supply, Installation, Testing and Commissioning of 6 watt Ceiling Ring Speakers with Variable wattage tapings of 6 / 3 / 1.5 watt SPL 96 dB with built-in matching transformer, having the frequency range 70 - 10000 Hz , off white colour grill, clamp type mount, top cover to protect from the mechanical damage and dust to the speaker. The rate shall including the PVC gland for the end connection.

8

-

-

... More
24 / 0.2 mm ATC twin twisted, FRLS type Armoured cable.

10

-

-

... More
AV Cable

140

-

-

... More
Cleanroom compatible Chairs Supply of Perforated SS316 construction Chair with levelling legs Adjustable height with comfort backrest Chairs must have tubular base, antistatic rotating castor wheels and Fixed foot ring Metal parts of the chairs must be chrome plated for non-contaminating operation

4

-

-

... More
Stools (For developer hood & wet etching hood) Supply of S316 construction Stool Height should be adjustable Antistatic rotating castor wheels Metal parts of the chairs must be chrome plated for non-contaminating operation

2

-

-

... More
Table Supply of Perforated SS316 construction Table with levelling legs Dimension (Length x Width x Height): 4 ft x 2 ft x 2.5 ft approx.

2

-

-

... More
Open Shelves Rack Supply of SS304, Non-EP, smooth & powder free construction Rack. Dimension: (Length x Width x Height) 2 ft x 1.5 ft x 5 ft approx. (No. of shelves-02)

1

-

-

... More
Gas Trolley Supply of SS304, Non-EP, smooth & powder free construction Gas trolley for carrying single cylinder.

1

-

-

... More
Bins Supply of SS304, Non-EP, smooth & powder free construction Bin with detachable top lid. Dimension: (Length x Width x Height) 1 ft x 1 ft x 1.5 ft approx.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.