Road Construction Department Tender

With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.

Road Construction Department Tender

Works
Eprocure
Opening Date23 May 2018
Closing Date31 May 2018
Tender Amount₹ 14,97,21,582 
Notes
Download

Costs

Summary

Widening and Strengthening of (From Single Lane to Intermedeate Lane) of Kanti-Motipur Road (Km 0.000 to Km 15.800) under PMGSY (RCP LWE)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading I Material Add 1% labour cess and 2% seigniorage.

5268.03

12013215

2280.4

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. Add 1% labour cess and 2% seigniorage.

4157.32

10871890

2615.12

... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. Add 1% labour cess and 2% seigniorage.

17323.36

574269

33.15

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Add 1% labour cess and 2% seigniorage.

105094.62

1264288

12.03

... More
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) Add 1% labour cess and 2% seigniorage.

2588.72

24029249

9282.29

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects) grading II materal (10mm nominal size) Add 1% labour cess and 2% seigniorage.

1315.59

13081779

9943.66

... More
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) Add 1% labour cess and 2% seigniorage.

1216.54

4845539

3983.05

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, Add 1% labour cess and 2% seigniorage.

7233.53

51098162

7064.07

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Add 1% labour cess and 2% seigniorage.

1964.13

1639459

834.7

... More
Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. Add 1% labour cess and 2% seigniorage.

8.64

112478

13018.39

... More
Providing and Fixing 'Logo' of PMGSY Project- (Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1). Add 1% labour cess and 2% seigniorage.

6

63499

10583.24

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. Add 1% labour cess and 2% seigniorage. (i) 80 x 60 cm (Rectangular)

42

285463

6796.75

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. Add 1% labour cess and 2% seigniorage. (ii) 60 x 60 cm

12

66293

5524.46

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. Add 1% labour cess and 2% seigniorage. (iii) 60 cm circular -

15

70625

4708.39

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. Add 1% labour cess and 2% seigniorage. (iv) 90 cm Octagonal

30

264949

8831.66

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. Add 1% labour cess and 2% seigniorage. (v) 90 cm Trangular

76

415271

5464.1

... More
Road Marker/Road stud Providing and fixing of road stud 100 x 100 mm die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling holes 30 mm upto a depth of 600 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973. Add 1% labour cess and 2% seigniorage.

800

189968

237.46

... More
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc. Add 1% labour cess and 2% seigniorage. Hectometer stones (Precast)

63

36679

582.22

... More
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc. Add 1% labour cess and 2% seigniorage. Ordinary Kilometer stones (Precast)

12

22678

1889.89

... More
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc. Add 1% labour cess and 2% seigniorage. 5th Kilometre Stone (Precast)

5

16112

3222.45

... More
Boundary Pillar Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 Add 1% labour cess and 2% seigniorage.

316

143723

454.82

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Add 1% labour cess and 2% seigniorage.

1349.26

322000

238.65

... More
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9. Sand filling Add 1% labour cess and 2% seigniorage.

126

54883

435.58

... More
Providing concrete for plain/reinforced concrete grade M10 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2.5:5) Add 1% labour cess and 2% seigniorage.

126

667396

5296.8

... More
Providing concrete for plain/reinforced concrete grade M15 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2.5:5) Add 1% labour cess and 2% seigniorage.

42.1

217010

5154.4

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M 20 Add 1% labour cess and 2% seigniorage.

579.6

3510938

6057.52

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 Add 1% labour cess and 2% seigniorage.

46.37

3067319

66151.64

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 Add 1% labour cess and 2% seigniorage.

791.76

79753

100.73

... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 In 1:3 cement mortar Add 1% labour cess and 2% seigniorage.

260.41

1553137

5964.2

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 Add 1% labour cess and 2% seigniorage.

864.24

137241

158.8

... More
Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106.. 1200 mm dia. Add 1% labour cess and 2% seigniorage.

75

339838

4531.18

... More
S/F/F of Rail Pole 13M long as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

41

1690039

41220.47

... More
S/F/F of 11KV pin insulater with pine as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

168

26995

160.69

... More
Dismentlingof 11KV Disc insulater with pine as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

60

36441

607.35

... More
S/F/F of 11 KV Tapping Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

8

25828

3228.57

... More
S/F/F of 11 KV V crose Arm as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

41

34252

835.43

... More
S/F/F of Back Clamp for Tapping Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

8

796

99.58

... More
S/F/F of Back clame for 11 KV V crose Arm as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

92

6394

69.5

... More
S/F/F of Top Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

41

6580

160.5

... More
S/F/F of Backe Clamp for F Top Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

16

1056

66.03

... More
S/F/F of A.C.S.R. Rabbit Conductor as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

0.24

10766

44862.45

... More
S/F/F of Stay set complete with wire as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

21

24601

1171.48

... More
S/F/F of Stay Clamp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

42

5108

121.64

... More
S/F/F of Danger Board as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

49

4133

84.35

... More
S/F/F of Guard Wire 7/16 as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

300

17979

59.93

... More
S/F/F of Guard bracket with clamp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

16

20076

1254.78

... More
S/F/F of Back Clamp for Rail Pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

16

2852

178.25

... More
S/F/F of Packing pice for Rail Pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

178

14179

79.66

... More
S/F/F of MS Nut Bolts as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

225

20560

91.38

... More
S/F/F of Base Plate for Rail pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

25

10339

413.57

... More
S/F/F of Support Clamp for V Cross Arm as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

76

15893

209.13

... More
S/F/F of Line DP Channel as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

6

31070

5178.47

... More
S/F/F of Support Clamp DP Channel as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

12

2502

208.54

... More
S/F/F of Cross Braccing DP Structure as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

6

25095

4182.61

... More
S/F/F of Clamp for Cross Braccing as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

24

10516

438.17

... More
S/F/F of Stay Insulater as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

15

527

35.14

... More
S/F/F of ACSR DOG Conductor as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

11

961654

87423.12

... More
S/F/F of PG Clamp for Connecting as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

36

2572

71.46

... More
S/F/F of 11 KV isolater 600 AMP. as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

1

16144

16144.64

... More
S/F/F of P.S.C. pole 400 KG for rail pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

58

407716

7029.6

... More
S/F/F of Stay set complete with wire as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

25

29287

1171.48

... More
S/F/F of Stay Clamp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

40

4865

121.64

... More
S/F/F of 03 Dia AB Cable as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3.1

962116

310360.21

... More
S/F/F of Suspension with Clamp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

46

26838

583.45

... More
S/F/F of Dead End Clamp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

10

6268

626.8

... More
S/F/F of SMD Box Set as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

58

74748

1288.76

... More
S/F/F of Danger Board as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

50

4217

84.35

... More
S/F/F of Earthing Pipe as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

10

10755

1075.52

... More
S/F/F of Stay Insulatar as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

10

398

39.83

... More
S/F/F of ACSR Rabbite Conductor as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

6

269174

44862.46

... More
S/F/F of LT Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

35

15664

447.55

... More
S/F/F of Clamp For LT Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

35

3485

99.58

... More
S/F/F of LT Sachel insulator with Strip as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

140

14761

105.44

... More
S/F/F of LT spacer with Strip as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

115

10777

93.72

... More
S/F/F of AL Binding Wire as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

20

6631

331.56

... More
S/F/F of MS Nut Bolt as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

66

6031

91.38

... More
S/F/F of PSC pole 200 KG as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

30

113598

3786.61

... More
S/F/F of Rail Pole 13M long as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

164881

41220.47

... More
S/F/F of Support Clamp for Channel as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

18

2705

150.31

... More
S/F/F of 11 KV pin insulater with GI pine as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

27

4338

160.69

... More
S/F/F of 11 KV HG fuse set as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3

10941

3647.04

... More
S/F/F of T.R. Tope, Horn gap, Base channle as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

9

35201

3911.27

... More
S/F/F of Stay Clamp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

36

4379

121.64

... More
S/F/F of LT Bracket/M.S Angel for LT fuse Set r as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

5

2240

448.13

... More
S/F/F of Stay set complete with wire as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

18

21086

1171.48

... More
S/F/F of Danger Board as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3

252

84.33

... More
S/F/F of G.I. Wire 8 SWG set as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

90

4943

54.93

... More
S/F/F of Earting set complete as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

9

9679

1075.52

... More
S/F/F of 11 Kv AB Switch 200 Amp. as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3

43917

14639.14

... More
S/F/F of M.S,. Nute and Bolt for rail pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

60

5482

91.38

... More
S/F/F of Transformer Belting Angel as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3

6164

2054.89

... More
S/F/F of ACSR Rabbite Conductor as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

0.12

5383

44862.46

... More
S/F/F of 11 KV Disk Insulater as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

9

5466

607.35

... More
S/F/F of 11 KV Tapping Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3

9685

3228.57

... More
S/F/F of Back Clamp for Tapping Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3

298

99.58

... More
S/F/F of LT Pin Insulater as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

24

2446

101.92

... More
S/F/F of Packing Pice for Rail Pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

20

1593

79.66

... More
S/F/F of PSC Pole 400 KG as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

2

14059

7029.6

... More
S/F/F of Rail Pole 105 Ibs 13 Mtr Long as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

164881

41220.47

... More
S/F/F of Base Plate For Rail Pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

1654

413.57

... More
S/F/F of Packing Piece as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

32

2549

79.66

... More
S/F/F of 11 KV Pin Insulator with G.I Pin as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

18

2892

160.69

... More
S/F/F of 11 KV Disk Insulator with Fitting as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

18

10932

607.35

... More
S/F/F of 40 mm Dia 3 mtr Long G.I Pipe Earthing as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

9

9679

1075.52

... More
S/F/F of G.I Stay Complete Set with Stay Wire as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

12

14061

1171.78

... More
S/F/F of Stay Insulator as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

12

477

39.83

... More
S/F/F of Stay Clamp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

12

1459

121.64

... More
S/F/F of M.S Nut Bolt as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

40

3655

91.38

... More
S/F/F of ACSR DOG Conductor as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

0.5

43711

87423.12

... More
S/F/F of AL. Binding Wire For D/S/S as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

12

3978

331.56

... More
S/F/F of P.G Clamp For Connecting as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

24

1715

71.46

... More
S/F/F of Copper wire For D/S/S as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

20

11551

577.59

... More
S/F/F of G.I.Wire 8 No. For Lacing as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

10

549

54.93

... More
S/F/F of 11 KV AB Switch 200 Amp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

48223

12055.76

... More
S/F/F of 11 KV HG Fuse Set as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

14588

3647.04

... More
S/F/F of 11 KV Lighting Arrester as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

21744

5436.22

... More
S/F/F of L.T Shackle Insulator with Strip as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

72

7591

105.44

... More
S/F/F of MS Channel For Supporting TR Base Channel as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

21287

5321.87

... More
S/F/F of MS Channel For Supporting ABS Channel as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

21287

5321.87

... More
S/F/F of MS Channel For Supporting HGF / LA 1 Set each as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

19849

4962.37

... More
S/F/F of Support Clamp For DSS as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

16

3346

209.13

... More
S/F/F of TR Belting Set per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

8

23104

2888

... More
S/F/F of Clamp For TR Belting Set as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

8

971

121.49

... More
S/F/F of L.T. Transformer Bus Bar as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

8

3580

447.55

... More
S/F/F of Clamp For L.T Bus Bar as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

8

971

121.49

... More
PCC M15 of Concreating as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

22.05

113654

5154.4

... More
Dismentling of PSC Pole 400 KG as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

9

7635

848.4

... More
Dismentling of Back Clamp for F Top Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

14

111

7.96

... More
Dismentling of 11KV pin insulater with pine as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

42

814

19.39

... More
Dismentlingof 11KV Disc insulater with pine as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

24

1759

73.3

... More
Dismentling of 11 KV V crose Arm as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

14

1411

100.82

... More
Dismentling of Back clame for 11 KV V crose Arm as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

9

75

8.38

... More
Dismentling of Top Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

14

271

19.37

... More
Dismentling of A.C.S.R. Weseal Conductor as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

0.24

778

3242.96

... More
Dismentling of Rail Pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

5

24874

4974.87

... More
Dismentling of Back clamp for F/ Top Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

48

12

... More
Dismentling of G.I Stay Set Complite as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

565

141.38

... More
Dismentling of Side Stay Clamp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

8

168

21.03

... More
Dismentling of 11 K.V Tapping Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

1558

389.65

... More
Dismentling of Back Clamp for Rail Pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

5

107

21.51

... More
Dismentling of P.S.C. pole 200 KG for rail pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

26

11882

457

... More
Dismentling of Scackle insuleter with U clam as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

40

339

8.48

... More
Dismentling of LT pin Insulater with Pine as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

70

613

8.76

... More
Dismentling of Weasal conducter as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4.8

15566

3242.95

... More
Dismentling of LT Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

30

1622

54.08

... More
Dismentling of back calmp for garding as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

30

360

12

... More
Dismentling of Stay Set Complite with Wire as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

8

1131

141.38

... More
Dismentling of Stay Clamp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

16

234

14.68

... More
Dismentling of 02 Dia AB Cable as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

0.8

1131

1414

... More
Dismentling of 03 Dia AB Cable as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

0.6

22474

37457.26

... More
Dismentling of PSC Pole 400 KG as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

6

5090

848.4

... More
Dismentling of DEAD END Clamp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

10

756

75.64

... More
Dismentling of SMD Box as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

30

4666

155.54

... More
Dismentling of JOIST Pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

12443

3110.8

... More
Dismentling of P.S.C. pole 200 KG for rail pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

4

1828

457

... More
Dismentling of TR, TOP HORN GAP & Base Channel as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

9

4248

472.04

... More
Dismentlingof 11 KV pin insulater with GI pine as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

27

523

19.39

... More
Dismentling of 11 KV HG fuse set as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3

1320

440.16

... More
Dismentling of Rail Pole as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

2

9949

4974.87

... More
Dismentling of Support Clamp for Channel as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

18

216

12

... More
Dismentling of Stay Clamp as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

36

528

14.68

... More
Dismentling of Stay set complete with wire as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

18

2544

141.38

... More
Dismentling of LT Bracket/M.S Angel for LT fuse Set as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

5

270

54.08

... More
Dismentling of 11 Kv AB Switch 200 Amp. as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3

4365

1455

... More
Dismentling of ACSR Weasel Conductor as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

0.12

649

5414.43

... More
Dismentling of 11 KV Tapping Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3

1168

389.65

... More
Dismentling of 11 KV Disk Insulator as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

9

659

73.3

... More
Dismentling of LT pin Insulator as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

24

210

8.76

... More
Dismentling of Backl Clamp for Tapping Bracket as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3

36

12

... More
Dismentling of Transformer Belting Set as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

3

744

248

... More
Dismentling of G.I Wire 8 as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

90

596

6.63

... More
Dismentling of Earthing Pipe as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

9

1168

129.8

... More
Dismentling of MS Nut Bolts as per specification & direction of E/I. with Labour charge, TransportationT & P and Add 1% labour cess

60

661

11.02

... More
1st year maintenance cost

15.8

1017851

64421

... More
2nd year maintenance cost

15.8

1318020

83419

... More
3rd year maintenance cost

15.8

1787627

113141

... More
4th year maintenance cost

15.8

2081523

131742

... More
5th year maintenance cost

15.8

2394569

151555



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.