Road Construction Department Tender

With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.

Road Construction Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date4 Dec 2024
Closing Date16 Dec 2024
Tender Amount₹ 2,60,59,880 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

648.9

196

127515

... More
Granular Sub-Base with Well Graded Material (Table:- 400- 1):--Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(GSB GR-I)

231.3

2181

504491

... More
Wet Mix Macadam :-- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

182.25

2575

469321

... More
Prime Coat:- Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.

810

41

33623

... More
Tack Coat :- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

810

15

12450

... More
Dense Graded Bituminous Macadam :-- Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.

44.55

10000

445528

... More
Semi-Dense Bituminous Concrete :-- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects (Providing and laying 25 mm SDBC over full Crust width )

20.25

10081

204152

... More
(I)Providing and Fixing 'Logo' of Project

2

13846

27693

... More
( III ) Providing & Fixing of LOGO of "Citizen Information Board"

2

13846

27693

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (i)Ordinary Soil up to 3.0m

59.58

116

6955

... More
II.B Ordinary Rock (not requiring blasting) up to 3.0m

195.78

618

121153

... More
Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.With Batching Plant, Transit Mixer and manual placing

12.24

4691

57423

... More
Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification. RCC Grade M35, With Batching Plant, Transit Mixer and manual placing

206.55

5572

1150917

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.1200mm dia (i) Normal Soil

8

13692

109539

... More
(ii) Soft Rock

88

68308

6011164

... More
(iii) Hard Rock

19.2

109615

2104620

... More
Supplying, fitting and placing TMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

25.95

73070

1896182

... More
Providing and constructing one span service road to reach island location from one pier location to another pier location. Assuming width of service road 10m

36

4047

145708

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification. (i) Upto 5m height

92.91

5972

554944

... More
ii) From 5m upto 10m height

20.87

6086

127028

... More
Supplying, fitting and placing TMT bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

14.9

73279

1091859

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications.(200MT capacity)

12

43690

524280

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical Specifications

56

140

7853

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 With sandy material

174.91

1372

240073

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

62.79

2060

129354

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 II. RCC M-35 (Height 5m to 10m)

158.9

6529

1037547

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

29.84

72956

2177035

... More
Providing and laying cement concrete wearing course M30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

20.21

10908

220462

... More
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

86

1883

161955

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

16

923

14771

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification (Using Batching PlantT & Manual Placing

7.09

4691

33262

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification

14.81

9138

135342

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

25.2

13177

332083

... More
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.

94.6

118

11240

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

19.33

2122

41025

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

6.44

2305

14844

... More
Seigniorage Fee for Construction Work

1

157952

157952

... More
Labour Cess (1%) for Construction Work

1

212315

212315

... More
1st Year Maintenance Work (i) Maintenance of Bituminous Surface Road Patch repair on already filled pot holes with 75mm BM with 20mm Premix Carpet and seal coat Type B as per drawing and technical specifications Clauses 1904.2, 508 and 510. For Approach Road portion

66

172

11360

... More
(ii) Maintenance of RCC Railing Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings and technical specification Clause 1911

8.6

2220

19096

... More
2nd Year Maintenance Work (i) Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. Kerb & Hand Rail

258

118

30656

... More
(ii) Maintenance of Bituminous Surface Road Patch repair on already filled pot holes with 75mm BM with 20mm Premix Carpet and seal coat Type B as per drawing and technical specifications Clauses 1904.2, 508 and 510. For Approach Road portion

132

172

22720

... More
(iii) Maintenance of RCC Railing Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings and technical specification Clause 1911

8.6

2220

19096

... More
3rd Year Maintenance Work i) Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. Kerb & Hand Rail

258

118

30656

... More
(ii) Maintenance of Bituminous Surface Road Patch repair on already filled pot holes with 75mm BM with 20mm Premix Carpet and seal coat Type B as per drawing and technical specifications Clauses 1904.2, 508 and 510. For Approach Road portion

216

172

37178

... More
(iii) Maintenance of RCC Railing Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings and technical specification Clause 1911

8.6

2220

19096

... More
4th Year Maintenance Work (i) i) Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. Kerb & Hand Rail

258

118

30656

... More
(ii) Maintenance of Bituminous Surface Road Patch repair on already filled pot holes with 75mm BM with 20mm Premix Carpet and seal coat Type B as per drawing and technical specifications Clauses 1904.2, 508 and 510. For Approach Road portion

360

172

61963

... More
(iii) Maintenance of RCC Railing Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings and technical specification Clause 1911

8.6

2220

19096

... More
5th Year Maintenance Work (i) i) Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. Kerb & Hand Rail

258

118

30656

... More
(ii) Maintenance of Bituminous Surface Road Patch repair on already filled pot holes with 75mm BM with 20mm Premix Carpet and seal coat Type B as per drawing and technical specifications Clauses 1904.2, 508 and 510. For Approach Road portion

720

172

123926

... More
(iii) Maintenance of RCC Railing Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings and technical specification Clause 1911

8.6

2220

19096

... More
Seigniorage Fee for Maintenance Work

1

2915

2915

... More
Labour Cess (1%) for Maintenance Work

1

4752

4752

... More
18% GST Amount (Construction Work+ Maintenance Work)

1

3975236

3975236



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.