Road Construction Department Tender

... More
With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.

Road Construction Department Tender

Works
Eprocure
Opening Date11 May 2018
Closing Date19 May 2018
Tender Amount₹ 20,26,54,383 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. Above 600 mm to 900 mm dia Hume pipe. Including cess @ 1% & seigniorage @ 2%

8.25

2958

358.57

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including cess @ 1%&seigniorage@2%

21049.06

1519531

72.19

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5. Including cess @ 1% &seigniorage@2%

21049.06

1575522

74.85

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead from upto 205 as per Technical Specification Clause 301.5. Including cess @ 1%) & seigniorage @ 2%

163099.27

25405973

155.77

... More
By Mix in Place Method. Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Including cess @ 1%) & seigniorage @ 2%

10475.55

28080549

2680.58

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead. Including cess @ 1% &seigniorage@2%

9654.71

29530378

3058.65

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.) . Including cess @ 1%&seigniorage@2% (Excluding cost of empty bitumen drums)

42909.83

1431471

33.36

... More
Tack coat.Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Excluding cost of empty bitumen drums) Including cess @ 1%&seigniorage@2%

183471.75

2221842

12.11

... More
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) (19 mm nominal size). (Excluding cost of empty bitumen drums). Including cess @ 1% &seigniorage@2%

4586.79

44857705

9779.76

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects). For grading II (10 mm Nominal size) (Excluding cost of empty bitumen drums). Including cess @ 1%&seigniorage@2%

2293.4

23886999

10415.54

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.). Including cess @ 1%&seigniorage@2%

3494.7

2915802

834.35

... More
Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing). Including cess @ 1%&seigniorage@2% (1200 x 1800 mm)

8.64

114300

13229.27

... More
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing). Including cess @ 1%&seigniorage@2%

-

-

-

... More
(i) 80 x 60cm (Rectangular)

110

759454

6904.13

... More
(ii) 60 x 45 cm Chevron

60

278389

4639.83

... More
(iii) 60 cm Circular

110

525762

4779.66

... More
(iv) 90 cm Octagonal

55

493571

8974.03

... More
(v) Triangular

110

358556

3259.6

... More
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973). Including cess @ 1%&seigniorage@2%

2450

590768

241.13

... More
Metal Beam Crash Barrier. Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810) Including cess @ 1%.&seigniorage@2%

800

2153864

2692.33

... More
Providing and Fixing 'Logo' of PMGSY Project. Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 Including cess @ 1%&seigniorage@2%

2

22347

11173.78

... More
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc). Including cess @ 1%&seigniorage@2%

-

-

-

... More
5th kilometre stone (precast)

4

16806

4201.59

... More
Ordinary Kilometer stone (Precast)

13

33087

2545.17

... More
Hectometer stone (Precast)

64

45191

706.11

... More
Excavation for Structures. Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary spil upto 3 m. depth. Including cess @ 1% & seigniorage @ 2%

2718

655119

241.03

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. P.C.C grade M 15. Including cess @ 1% &seigniorage@2%

639.01

3571075

5588.45

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. P.C.C. grade M 20 . Including cess @ 1% & seigniorage @ 2%

1005.76

6505305

6468.05

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3. Including cess @ 1% & seigniorage @ 2%

54.95

737200

13415.84

... More
Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211. Including cess @ 1% & seigniorage @ 2%

176.4

1927431

10926.48

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209. Including cess @ 1% &seigniorage@2%

28

17647

630.27

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3. Including cess @ 1% & seigniorage @ 2%

134.4

414064

3080.84

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202. Including cess @ 1% & seigniorage @ 2%

40.56

2692350

66376.18

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301. Including cess @ 1% & seigniorage @ 2%

476.9

1339898

2809.6

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8. Including cess @ 1% & seigniorage @ 2%

149.91

426944

2848.1

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7. Including cess @ 1% & seigniorage @ 2%

598

69200

115.72

... More
Painting lines, Dashes, Arrows, etc. on Road in Two Coats on New Work. Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702. Including cess @ 1% & seigniorage @ 2%

504

52799

104.76

... More
Filler Joint. Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications. Including cess @ 1% &seigniorage@2%

152.6

48375

317.01

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8. Granular material. Including cess @ 1% &seigniorage@2%

112.37

292719

2604.94

... More
Construction of Embankment with Material Obtained from Borrow Pits. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead from 750m to 1000m as per Technical Specification Clause 301.5 Including cess @ 1% & seigniorage @ 2%

2450

666204

271.92

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. P.C.C. grade M 20. Including cess @ 1% & seigniorage @ 2% (wing wall & return wall)

105.53

682572

6468.04

... More
Utility shifting work (Item rate including 2% (T&P) + 4% (Transportation) + 10 % (Labour cost), With 1% cess.

-

-

-

... More
For 11 KV Line

-

-

-

... More
Rail pole 105 Ibs, 13 mtr Long

26

1775820

68300.77

... More
Base Plate for Rail pole

22

9098

413.57

... More
V' Cross arm

22

44850

2038.68

... More
Pole Top Bracket

22

6397

290.79

... More
Clamp for V cross Arm and Top Bracket

44

7843

178.26

... More
Support clamp for 'V' cross arm

44

9201

209.13

... More
Line D.P. Channel

2

10356

5178.47

... More
Support clamp for D.P. Channel

4

836

209.13

... More
Cross bracing for D.P. Structure

2

8365

4182.61

... More
Clamp for cross bracing

4

1752

438.18

... More
Packing piece

52

4142

79.67

... More
11 Kv Pin insulator with G.I. Pin

70

16238

231.98

... More
11 Kv Disc insulator 2 Nos with 1 no fitting = 1 set

15

8505

567.05

... More
40 mm Dia 3 Mtr Long G.I. Pipe earthing

26

27963

1075.53

... More
Bentonite powder

1300

16757

12.89

... More
G.I. Stay complete set (20 mm) with stay wire (7/8 Swg)

12

17855

1487.93

... More
Stay Insulator

12

421

35.15

... More
Stay Clamp

12

2868

239.01

... More
M.S. Nut & Bolts

80

9279

115.99

... More
Guard bracket channel 75 x 40 x 6 mm

2

2509

1254.78

... More
Clamp for guard bracket

2

242

121.49

... More
G.I. Wire Number 6 for lacing

8

439

54.94

... More
G.I. Wire Number 8 for lacing

8

439

54.94

... More
ACSR Dog conductor

5.12

395319

77210.78

... More
PG Clamp for connecting

12

857

71.47

... More
Concreating

22

154651

7029.6

... More
11 Kva isolataor 600 AMP

1

16144

16144.65

... More
Danger board

26

1340

51.55

... More
Red oxide paint

52

9504

182.77

... More
Aluminum paint

52

19800

380.77

... More
B.B. Paint

13

2376

182.77

... More
Jointing sleeves for ACSR

6

702

117.16

... More
Binding tape

4

187

46.86

... More
Painting & numbering of Support.

26

6701

257.75

... More
Rail pole 105 Ibs, 13 mtr Long

-

-

-

... More
Psc Pole 8 mtr Long

22

96657

4393.5

... More
40 mm Dia 3 Mtr Long Pipe G.I. earthing

6

6453

1075.53

... More
G.I. stay complete set with stay wire

12

17855

1487.93

... More
Stay insulator

12

477

39.83

... More
Stay clamp

12

2868

239.01

... More
M.S. Nut & Bolts

30

3479

115.99

... More
ACSR rabbit conductor

6

243294

40549.08

... More
Al. Binding wire

5

1657

331.56

... More
L.T. Bracket

22

9859

448.14

... More
Clamp for Lt Bracket

22

2190

99.59

... More
L.T Shackle Insulator with strip

88

9278

105.44

... More
L.T. Spacer

88

8248

93.73

... More
Service wire 4 Sqmm

3300

302049

91.53

... More
Concreating

19

133562

7029.6

... More
Red oxide paint

44

8041

182.77

... More
Aluminum paint

44

16753

380.77

... More
B.B. paint

11

2010

182.77

... More
Painting & numbering of support.

22

5670

257.75

... More
Rail pole 105 Ibs, 13 mtr Long

16

1092812

68300.77

... More
Base Plate for Rail pole

16

6617

413.57

... More
Packing Piece

80

6373

79.67

... More
11 Kv pin Insulator with G.I. Pin

24

13974

582.29

... More
11 Kv Disc insulator with fitting

24

41052

1710.54

... More
40 mm Dia 3 Mtr Long G.I. Pipe earthing

48

51625

1075.53

... More
G.I stay complete set with stay wire

32

47613

1487.93

... More
Stay insulator

32

1274

39.83

... More
Stay clamp

32

7648

239.01

... More
M.S. Nut & Bolts

145

16818

115.99

... More
ACSR Dog conductor

0.8

61768

77210.78

... More
63 KVA Transformer

5

698935

139787.11

... More
100 KVA Transformer

3

571819

190606.43

... More
AI. Binding wire/ACSR Dog Conductor

8

2652

331.56

... More
PG Clamp for connecting

24

1715

71.47

... More
Copper wire for D/S/S

16

9241

577.6

... More
G.I. wire 8 No. for Lacing

24

1318

54.94

... More
11 KV AB switch 200 Amp

8

101020

12627.5

... More
11 KV HG Fuse set

8

34098

4262.28

... More
11 KV Lighting Arrester

24

130469

5436.22

... More
LT. Shackle insulator with Strip

32

3374

105.44

... More
MS channel for supporting TR Base Channel

8

42575

5321.88

... More
MS channel for supporting ABS Channel

8

42575

5321.88

... More
MS channel for supporting HGF/LA 1 set each

24

119096

4962.37

... More
Support clamp for DSS

16

3346

209.13

... More
TR Belting set

8

23103

2887.99

... More
Clamp for TR Belting set

8

971

121.49

... More
L.T. Transformer Bus Bar

16

7170

448.14

... More
Clamp for LT Bus Bar

16

1943

121.49

... More
Concreating

21

147621

7029.6

... More
Aluminum Paint

32

12184

380.77

... More
Red Oxide Paint

32

5848

182.77

... More
B.B Paint

8

1462

182.77

... More
Danger Board

16

1349

84.36

... More
Maintanance

-

-

-

... More
1st year after completion of construction work

16.18

1111974

68746.46

... More
2nd year after completion of construction work

16.18

1420198

87802.04

... More
3rd year after completion of construction work

16.18

1724081

106589.24

... More
4th year after completion of construction work

16.18

2027119

125324.2

... More
5th year after completion of construction work

16.18

2346319

145058.42



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.