Ministry Of Road Transport And Highways Tender
With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.
Costs
EMD
₹ 2,00,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Consultancy Services For Preparation Of Detailed Project Report For The Upgradation Of Newly Declared N.h. 131 B Starting From Its Junction With Nh-31
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MoRTH_818395_1Bid Award Id
ViewTender No
NIT NO. 06/2024-25Tender Authority
Ministry Of Road Transport And Highways ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Highway cum Pavement Engineer
6
-
-
Material cum Geotechnical Engineer - Geologist
6
-
-
Senior Survey Engineer
7
-
-
Traffic and Safety Expert
4
-
-
Environmental Specilist
3
-
-
Quantity Surveyor / Documentation Expert
6
-
-
Land Acquisition Expert
7
-
-
Utility Expert
4
-
-
SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate)
-
-
-
..
-
-
-
..
-
-
-
..
-
-
-
..
-
-
-
..
-
-
-
..
-
-
-
..
-
-
-
SUPPORT STAFF :
-
-
-
Office Manager
-
-
-
Typist
-
-
-
Office Boy
-
-
-
Night Watchman
-
-
-
Transportation (Fixed Costs)
-
-
-
The Vehicles Provided by the consultants shall include the cost for rental drivers operation, maintenance, Repairs, insurance etc., A. For use of Consultant
-
-
-
Duty Travel to Site(Fixed Costs):
-
-
-
Office Rent (Fixed Costs) The rent includes maintenance, cleaning, repairing etc.,
-
-
-
..
-
-
-
OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs)
-
-
-
Office Supplies
-
-
-
Drafting Supplies
-
-
-
Computer Running Costs
-
-
-
Domestic and International Communication
-
-
-
OFFICE FURNITURE AND EQUIPMENT (Rental)
-
-
-
Office Furniture and Ecquipment ( L.S)
-
-
-
REPORTS & DOCUMENTS PRINTING ( For Clubbed Projects)
-
-
-
Monthly report (3copies per Month)
3
-
-
Inception Report & QAP
3
-
-
Environment and Social Impact Screening Report
4
-
-
Draft Feasibility Report
4
-
-
Final Feasibility Report
6
-
-
Strip Plan with LA Reports
6
-
-
Draft LA and Clearances I Report
4
-
-
Final LA and Clearances I Report
4
-
-
Draft Environmental Assessment Report & RAP
4
-
-
Final Environmental Assessment Report and RAP
6
-
-
Draft Detailed Design Report & Drawings etc.
4
-
-
Draft EMP
4
-
-
Draft Bidding Documents
4
-
-
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
6
-
-
Final EMP.
6
-
-
Final Bidding Documents
6
-
-
Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)
9
-
-
LA & Clearances II Report
6
-
-
Survey and Investigation
-
-
-
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
-
-
-
Detailed topographic surveys using mobile / aerial LiDAR or better Technology
-
-
-
Investigation (Fixed Cost)
-
-
-
Road and Bridge Inventory
-
-
-
FWD Test and Pavement Evaluation
-
-
-
Roughness Survey
-
-
-
Axle Load Survey
-
-
-
Material Survey and Investigation
-
-
-
Sub-grade Investigation
-
-
-
Traffice Survey
-
-
-
Socio-economic & Census Survey/Studies
-
-
-
Land Acquisition Studies
-
-
-
Any other Investigations/Surveys
-
-
-
Sub-Soil Investigation (Boring)
-
-
-
a) Boring in all type of soils (other than hard rock)
-
-
-
b) Boring in hard rock
-
-
-
Network Survey and GPR
-
-
-
Network Survey of the existing Highways as a repository for civil works as per directions from Authority
-
-
-
GPR Survey for detection of under ground utilities
-
-
-
Cost of Supply and Fixing Boundary pillars
-
-
-
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
-
-
-
Land Acquisition Team including support staff and logistics/ transportation
-
-
-
Ex-Land Revenue Inspector/ Officer or equivalent
-
-
-
Ex-Kanoogo/Girdwar or equivalent
-
-
-
Ex-Patwari or Equivalent
-
-
-
Typist
-
-
-
Peon
-
-
-
B. Logistics for Land Acquisition Team
-
-
-
Computer including necessary peripherals
-
-
-
Printers
-
-
-
Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km
-
-
-
Estimate of Costs for Expatriate Consultants (in Indian Rupees)
-
-
-
I. Remuneration of Expatriate Staff including per diem allwances
-
-
-
II. Mobiliation and Demobilization
-
-
-
1. International Airfares (Fixed Costs)
-
-
-
Total Cost Net of Tax:
-
-
-
I. Income Tax (Expatriate Staff)
-
-
-
II. Other Taxes/ duties (if any) Specify Clearly
-
-
-
Goods and Service Taxes @ 18%
0.18
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements