Inland Waterways Authority Of India Tender

With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.

Inland Waterways Authority Of India - IWAI Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date31 Jul 2024
Closing Date6 Aug 2024
Tender Amount₹ 36,83,500 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Cutter teeth to be fabricated as per sample and fitted back in OE position and make operational as required as per direction of EIC.

-

-

-

... More
Labour charges

1

30000

30000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Fairing & cropping damaged railing pipe and stand(MS flat bar) to be straightened, welded, providing nut-bolts and railing to be cut in necessary manner, including labour & material cost as required as per direction of EIC.

15

60000

4000

... More
Joint swing operation from the wheel house was reported non operational ,same to be checked, defects to be rectified and make operational as required as per direction of EIC.

-

-

-

... More
Labour charges

1

80000

80000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
All gauges/indicators i.e Spud hoisting/lowering/free fall speed controller ,Ladder hoisting/lowering speed controller & meter , Spud carriage in/out speed controller ,Spud carriage in/out push button switch malfunctioning ,Spud carriage distance meter gauge,02 nos. spud operating lever/joystick, Dredge pump engaging/disengaging clutch liver to be checked and defects to be rectified and make operational as required as per direction of EIC.

-

-

-

... More
Labour charges

1

125000

125000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
All grease lines and points/nipples to be checked and repaired with renewal of its pipe, adaptor, nozzle, tube, coupling nut, connector, screw sleeve, coupler and nipple etc as required as per direction of EIC.

-

-

-

... More
Labour charges

1

50000

50000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Replace/renew of both anchor swing winches rope as per sample (Swing Winch wire length : 220 mtrs each and dia : 26 mm) as per direction of EIC.

1

180000

180000

... More
Air Bottles, Make:ODS, Capacity:350 ltrs/0.25 cum/hrs @ 30 bar has to be cleaned/serviced & pressure tested as per OEM; relief valve to be changed ,fitted and callibrated. All air bottles to be pressure tested upto 45 Bar as required as per direction of EIC.

-

-

-

... More
Labour and consumable charges

2

70000

35000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Air Compressors Quince- 325LS, Type: Reciprocating, Model: LT 7-30, Capacity: 20Cu.m/hr@30bar to be top overhauled with renewal of spare parts and made operational as required with engage/disengage to drive motor. Also check and repair/renew the electric starter, pressure gauge, solenoid switches, clutch and other accessories e.g. control unit etc. as required as per direction of EIC.

-

-

-

... More
Labour charges

1

35000

35000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
All flushing pump Make-Stork, Model-C No 80-400G2,Capacity-43m3/hr to be completly serviced with renewal of spares and fitted back in OE position as required as per direction of EIC.

-

-

-

... More
Labour and consumable charges

4

180000

45000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Seals of Dredge Pump thrust bearing units was reported leakage same to be arrested and make the dredge leakage free and make operational as required as per direction of EIC.

-

-

-

... More
Labour and consumable charges

1

45000

45000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Engine room blowers and motor & fan fitted is to be required servicing, relay switch is not operational same to be rectified and make operational as per direction of EIC.

-

-

-

... More
Labour and consumable charges

1

25000

25000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
General Service pump to be serviced and defects to be rectified and make operational as required as per direction of EIC.

-

-

-

... More
Labour charges

1

30000

30000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Repair and Servicing of Entire hydraulic line including both spud hydralic brake & spud carriage wheels, defective 'O' rings, couplings, filters, spud carriage ram and and same to be repaired/serviced as required as per direction of EIC.

-

-

-

... More
Labour charges

1

35000

35000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Engine room's GS pump's to be completely ovehauled with replacement of spares as required as per direction of EIC .

-

-

-

... More
Labour charges

1

7000

7000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Manual deck crane of dwt (03 ton) fitted on deck, as reported its pinion is broken same to be renewed and fitted and make operational as per direction of EIC.

-

-

-

... More
Labour charges

1

18000

18000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Servicing of gland cooling pump of dredge pump unit to make oprational with renewal of spares. All plumber block with bearings of pump and belt adjustment pulley needs to be checked and necessary repair/replacement to be carried out as required as per direction of EIC.

-

-

-

... More
Labour charges

2

80000

40000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Fire extinguisher to be serviced, hydraulic tested, refilled and made operational after renewal of accessories as required as per direction of EIC.Test certificate to be provided.

-

-

-

... More
DCP - 10 Kg

3

12000

4000

... More
Mechanical Foam type 9 ltrs

1

4000

4000

... More
Water type CO2

1

4000

4000

... More
Mechanical Foam type 9 ltrs(SP)

2

8000

4000

... More
BOQ FOR CSD JALANGI

-

-

-

... More
The entire ship from LWL to main deck,deck plate, superstructure, bathroom, anchor, anchor rake, engine room, store rooms, hydraulic cooling pump room, spud, spud bracket, carriage, vent, cutter ladder, bollard, deck crane, railing, jet nozzle, railing-chain and outside alongwith other fitment etc, are to be proper cleaned, scrapped, wire brushed, chipped and painted by 3 coats of existing colour marine paint. (1 coat zinc chromate primer, followed by two coat of existing colour of marine paints ). All pipe lines should be colored as per marine color code. After it name of vessel, deptt. and logo to be made by fluorescent sticker as required as per direction of EIC.

1200

228000

190

... More
Hydraulic oil leakage found from hydraulic oil supply pipelines, solenoid blocks, hydraulic pressure gauges of cutter; ladder and 02 nos. spuds, hydraulic oil supply pipeline to be checked and leakage to be arrested with renewal of its gaskets, seals, o-rings, high pressure hoses, solenoid, emergency hydraulic system, sensors including high pressure line valve,Hydraulic system filter etc as required and ensure air free operation . Also fill up the hydraulic oil in the tank and make operational of all hydraulic lines with ensure smooth flow and pressure tested as required per direction of EIC.

-

-

-

... More
Labour charges

1

100000

100000

... More
Cost of spares (actual + 10%)

-

-

-

... More
Entire electrical/electronics, AC/DC line, panel of engine room, wheel house, accomodation (lights, fans etc) ,engine room (including emergency lights), general alarm bell, D.C. horn, air horn, battery charger, switch boards, sensor, lighting, navigational lights, search light, halogen light, fire alarm, hooter, siren, bed light, table light, light cover, exhaust fan & other fittings etc. are to be checked and rectified the defects as required, with renewal of required materials. Line & wiring to be checked and serviced/ repaired as required as per direction of EIC.

-

-

-

... More
Labour charges

1

40000

40000

... More
Cost of spares (actual + 10%)

-

-

-

... More
Both side anchor pulley and cutter ladder pulley has to be checked and repalced for hassale free operation as required as per direction of EIC.

-

-

-

... More
Labour charges

3

36000

12000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
All gauges/indicators i.e Spud hoisting/lowering/ speed controller of ladder,spud,spud carriage , hoisting/lowering speed controller & meter , Spud carriage position gauge ,Spud carriage in/out push button switch malfunctioning ,02 nos. spud operating lever/joystick, auxilary spud freefall,Dredge pump engaging/disengaging clutch liver to be checked and defects to be rectified and make operational as required as per direction of EIC.

-

-

-

... More
Labour charges

1

125000

125000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Air Compressors make INGERSOLL RAND,Model no-231XASSC, Sl.no.3000103, Type: Reciprocating, Model: 231, Capacity: 20Cu.m/hr@30bar to be top overhauled with renewal of spare parts and made operational as required with engage/disengage to drive motor. Also check and repair/renew the electric starter, pressure gauge, solenoid switches, clutch and other accessories e.g. control unit etc. as required as per direction of EIC.

-

-

-

... More
Labour charges

1

30000

30000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Fabrication and installation of damaged shed on deck over the engine room area including steel structure, FRP sheet of good quality and other required material, labour charges all complete as required as per direction of EIC.

-

-

-

... More
Labour charges

1

15000

15000

... More
Cost of material(actual+10%)

-

-

-

... More
Hydraulic cooler mounted/fitted on pump room is to be serviced and repaired, with renewal of spares as required as per direction of EIC.

-

-

-

... More
Labour charges

1

20000

20000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
All grease lines and points/nipples including Cutter ladder greasing line and valves to be checked and repaired with renewal of its pipe, adaptor, nozzle, tube, coupling nut, connector, screw sleeve, coupler and nipple etc as required as per direction of EIC.

-

-

-

... More
Labour charges

1

25000

25000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Fairing & cropping damaged railing pipe and stand(MS flat bar) to be straightened, welded, providing nut-bolts and railing to be cut in necessary manner, including labour & material cost as required as per direction of EIC.

15

45000

3000

... More
Cleaning and repairing of silencer/flue gas exhaust pipe of the Auxilary engine from the engine outlet upto exhaust at rooftop and ensure obstruction free flow of exhaust gas out of the vessel as required (and applicable) as per direction of EIC

-

-

-

... More
Labour charges

1

15000

15000

... More
Cost of spares (actual + 10%)

-

-

-

... More
Dredge pump engaging/disengaging solenoid valve was reported malfunctioning,same is to be serviced/repaired and make fully operational as required as per direction of EIC.

-

-

-

... More
Labour charges

1

25000

25000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Entire Dredge pump discharge pipe line ,swing band and its seal,centre spud cylindrical ram foundation plate to be checked and leakage to be arrested with renewal of plates with same material as required as per direction of EIC.

-

-

-

... More
Labour charges

1

40000

40000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Dredge pump tail line coupling leakage from gland was reported,same is to be repaired/renewed and coupling to be fitted in OE position and make operational as required as per direction of EIC.

-

-

-

... More
Labour charges

1

5000

5000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Checking and replacement of cutter teeth of same material and composition as required as per direction of EIC.

-

-

-

... More
Labour charges

1

5000

5000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Engine room blowers and motor & fan fitted is to be required servicing, relay switch is not operational same to be rectified and make operational as per direction of EIC.

-

-

-

... More
Labour and consumable charges

1

25000

25000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Quick closing valve fitted in the inlet and outlet of HSD tank was reported non operational,same to be checked and repaired and fitted back in OE position as required as per direction of EIC.

-

-

-

... More
Labour charges

1

4000

4000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Servicing of gland cooling pump of dredge pump unit to make oprational with renewal of spares. All plumber block with bearings of pump and belt adjustment pulley needs to be checked and necessary repair/replacement to be carried out as required as per direction of EIC.

-

-

-

... More
Labour charges

1

2000

2000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Fire extinguisher to be hydraulic tested, refilled with same refilling materials and made operational after renewal of accessories, certificate is to be produced as required as per direction of EIC.

-

-

-

... More
DCP 5 KG

3

7500

2500

... More
Mechanical foam type 9 Ltr

3

7500

2500

... More
water CO2 type (9ltr)

2

5000

2500

... More
Replacment of any leaked cylinder(Actual bill/invoice + 10%)

-

-

-

... More
BOQ FOR CSD MAHANANDA

-

-

-

... More
Hydraulic oil leakage found from hydraulic oil supply pipelines, solenoid blocks, hydraulic pressure gauges of cutter; ladder and 02 nos. spuds, hydraulic oil supply pipeline to be checked and leakage to be arrested with renewal of its gaskets, seals, o-rings, high pressure hoses, solenoid, emergency hydraulic system, sensors including high pressure line valve,Hydraulic system filter etc as required and ensure air free operation . Also fill up the hydraulic oil in the tank and make operational of all hydraulic lines with ensure smooth flow and pressure tested as required per direction of EIC.

-

-

-

... More
Labour charges

1

100000

100000

... More
Cost of spares (actual + 10%)

-

-

-

... More
Dredge pump to be opened & fitted after renewal of its seals etc, and necessary repairs of dredgepump/ casing/ impeller is to be done with remetalling, welding, plastic carbide or other means as required as per direction of EIC.

-

-

-

... More
Labour charges

1

125000

125000

... More
Cost of spares (actual + 10%)

-

-

-

... More
All gauges/indicators i.e Spud hoisting/lowering/free fall speed controller of ladder,spud,spud carriage , hoisting/lowering speed controller & meter , Spud carriage position gauge ,Spud carriage in/out push button switch malfunctioning ,02 nos. spud operating lever/joystick, Dredge pump engaging/disengaging clutch lever including solenoid valve to be checked and defects to be rectified and make operational as required as per direction of EIC.

-

-

-

... More
Labour charges

1

125000

125000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
All grease lines winches, ladder, spud carriage, etc and grease points/nipples to be checked and repaired with renewal of its pipe, adaptor, nozzle, tube, coupling nut, connector, screw sleeve, coupler and nipple etc including cutter ladder greasing lines and valves as required as per direction of EIC.

-

-

-

... More
Labour charges

1

25000

25000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Fairing & cropping damaged railing pipe and stand(MS flat bar) to be straightened, welded, providing nut-bolts and railing to be cut in necessary manner, including labour & material cost as required as per direction of EIC.

15

45000

3000

... More
Entire electrical/electronics, AC/DC line, panel of engine room, wheel house, accomodation (lights, fans etc) ,engine room (including emergency lights), general alarm bell, D.C. horn, air horn, battery charger, switch boards, sensor, lighting, navigational lights, search light, halogen light, fire alarm, hooter, siren, bed light, table light, light cover, exhaust fan & other fittings etc. are to be checked and rectified the defects as required, with renewal of required materials. Line & wiring to be checked and serviced/ repaired as required as per direction of EIC.

-

-

-

... More
Labour charges

1

40000

40000

... More
Cost of spares (actual + 10%)

-

-

-

... More
Entire Dredge pump discharge pipe line ,swing band and its seal,centre spud cylindrical ram foundation plate to be checked and leakage to be arrested with renewal of plates with same material as required as per direction of EIC.

-

-

-

... More
Labour charges

1

40000

40000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Checking and replacement of cutter teeth of same material and composition as required as per direction of EIC.

-

-

-

... More
Labour charges

1

5000

5000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Both side anchor pulley and cutter ladder pulley has to be checked and replaced for hassale free operation as required as per direction of EIC.

-

-

-

... More
Labour charges

3

15000

5000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
All pumps of the vessel such as Sea water pumps, Fresh Water pumps, and GS Pumps,emergency fire pump etc. along with its motors are to be seviced with renewal of required spares as per direction of EIC.

-

-

-

... More
Labour charges

1

20000

20000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Control Cabin main door lock, glass window lock ,curtain stand,curtains was reported damaged same to be repaired and renewed and fitted as required as per direction of EIC.

-

-

-

... More
Labour charges

1

2000

2000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Entire Man hole covers and rubber packing include all door and all air vent & all hatchs/tanks damaged rubber,nuts ,bolts & studes same to be checked, repaired/ renewed by good quality of rubber & ss fittngs as required as per direction of EIC.

-

-

-

... More
Labour charges

1

5000

5000

... More
Cost of spares (actual + 10%)

-

-

-

... More
Both spud holding bracket, pin and supporting angle was rerported damaged and bend, same to be repaired/straightened and if required pin to be repaired/renewed and spuds locking and holding arrangement to be done and fitted back in OE position as required as per direction of EIC.

-

-

-

... More
Labour charges

1

15000

15000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
DC Generator make: GE Motor Pvt. Ltd.; 24V/1.5kW/60amp) to be serviced and make operational as required as per directiona of EIC.

-

-

-

... More
Labour charges

1

8000

8000

... More
Cost of spares (actual + 10%)

-

-

-

... More
Cutter hydraulic motor Make:- IHC 1330-120, 5-bladed with serrated edges, 110kW, Dia-1330mm; was reported overheated during operation same to be checked,and hydraulic moter to be completely overhauled and make operational and revolution per minute is to be increased from 20 RPM and upto 33 RPM as required as per direction of EIC.

-

-

-

... More
Labour and consumable charges

1

50000

50000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Hydraulic oil cooling pump coupled with auxillary engine is required to be serviced/repaired and make smoothely operational as per direction of EIC.

-

-

-

... More
Labour and consumable charges

1

15000

15000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
All Main sea suction valve and sea line valves, fresh water line valves, fuel line valves with its entire pipe lines to checked, tested and serviced and if required same to be repaired/ renewed as per direction of EIC.

-

-

-

... More
Labour charges

1

25000

25000

... More
Cost of spares actual + 10% basis

-

-

-

... More
Marine gear box to be dismantled and worn out parts (i.e. clutch drum, clutch plates, steel pr. plates, shaft oil seals, spider coupling rubber, seal rings, o-rings,etc) to be replaced along with repair of gear oil pump and renewal of filters and fitted back and made operational in O.E. postion as per direction of EIC.

-

-

-

... More
Labour charges

1

125000

125000

... More
Cost of machining, re-metalling, lathe shop charges,etc (actual + 10%)

-

-

-

... More
Cost of spares actual + 10% basis

-

-

-

... More
Bilge pump make: Crompton Greaves Ltd.; M/c No. 1732J; RPM: 1430 to be serviced/repaired including discharge pipeline as required as per direction of EIC.

-

-

-

... More
Labour charges

1

5000

5000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
A.C of capacity 1 ton make Voltas window A.C in operating room is not working properly.Same to be checked and repair with renewal of spare parts as required alongwith filling of gas for proper operation/performance as required as per direction of EIC.

-

-

-

... More
Labour charges

1

1500

1500

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Truck tyre along with bull dog clamp and wire rope are to be supplied and fitted including labour and material as required as per direction of EIC.

30

75000

2500

... More
Fire extinguisher to be serviced, hydraulic tested, refilled and made operational after renewal of accessories as required as per direction of EIC.Test certificate to be provided.

-

-

-

... More
Mechanical foam type 9 Ltr AFFF

2

6000

3000

... More
DCP 5 KG

2

6000

3000

... More
water CO2 type (9ltr)

2

5000

2500

... More
BOQ FOR CSD KALLADA

-

-

-

... More
The entire ship from LWL to main deck,deck plate, superstructure, bathroom, anchor, anchor rake, engine room, store rooms, hydraulic cooling pump room, spud, spud bracket, carriage, vent, cutter ladder, bollard, deck crane, railing, jet nozzle, railing-chain and outside alongwith other fitment etc, are to be proper cleaned, scrapped, wire brushed, chipped and painted by 3 coats of existing colour marine paint. (1 coat zinc chromate primer, followed by two coat of existing colour of marine paints ). All pipe lines should be colored as per marine color code. After it name of vessel, deptt. and logo to be made by fluorescent sticker as required as per direction of EIC.

600

114000

190

... More
Both spud holding bracket, pin and supporting angle are damaged and bent, all to be repaired/straightened and if required pin to be renewed and spuds locking and holding arrangement to be done as per OEM as per direction of EIC.

-

-

-

... More
Labour charges

1

15000

15000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Entire electrical/electronics, AC/DC line, panel of engine room, wheel house, ,engine room (including emergency lights), battery charger, switch boards, sensor, lighting, navigational lights, search light, halogen light, fire alarm, hooter, light cover, other fittings etc. are to be checked and rectified the defects as required, with renewal of required materials. Line & wiring to be checked and serviced/ repaired as required as per direction of EIC.

-

-

-

... More
Labour charges

1

20000

20000

... More
Cost of spares (actual + 10%)

-

-

-

... More
Hydraulic oil leakage found from hydraulic oil supply pipelines, solenoid blocks, hydraulic pressure gauges of cutter; ladder and 02 nos. spuds, hydraulic oil supply pipeline to be checked and leakage to be arrested with renewal of its gaskets, seals, o-rings, high pressure hoses, solenoid, emergency hydraulic system, sensors including high pressure line valve,Hydraulic system filter etc as required and ensure air free operation . Also fill up the hydraulic oil in the tank and make operational of all hydraulic lines with ensure smooth flow and pressure tested as required per direction of EIC.

-

-

-

... More
Labour charges

1

35000

35000

... More
Cost of spares (actual + 10%)

-

-

-

... More
All grease lines and points/nipples to be checked and repaired with renewal of its pipe, adaptor, nozzle, tube, coupling nut, connector, screw sleeve, coupler and nipple etc as required as per direction of EIC.

-

-

-

... More
Labour charges

1

25000

25000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Both side anchor pulley and cutter ladder pulley has to be checked and repalced for hassale free operation as required as per direction of EIC.

-

-

-

... More
Labour charges

3

15000

5000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Sea water pump of the main engine to be serviced as required as per direction of EIC.

-

-

-

... More
Labour charge

2

4000

2000

... More
Cost of spare & machining (actual + 10%)

-

-

-

... More
Cutter hydraulic motor was reported overheated during operation,same to be checked and rectify the defects and make operational as required as per direction of EIC.

-

-

-

... More
Labour and consumable charges

1

15000

15000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Both side spud cylinderical ram was reported non operational same to be serviced and load test and trial is to be done to meet the operational requirement as required asper direction of EIC.

-

-

-

... More
Labour and consumable charges

1

15000

15000

... More
Cost of spare/material actual + 10% basis

-

-

-

... More
Fabrication and installation of damaged shed (Dim:- L= 3.45m, B=1.6m)on deck over the engine room area including steel structure, FRP sheet of good quality and other required material, labour charges all complete as required as per direction of EIC.

-

-

-

... More
Labour charges

1

10000

10000

... More
Cost of material(actual+10%)

-

-

-

... More
Fairing & cropping damaged railing pipe and stand(MS flat bar) to be straightened, welded, providing nut-bolts and railing to be cut in necessary manner, including labour & material cost as required as per direction of EIC.

10

30000

3000

... More
All gauges/indicators i.e Spud hoisting/lowering/ speed controller of ladder,spud,spud carriage , hoisting/lowering speed controller & meter , Spud carriage position gauge ,Spud carriage in/out push button switch malfunctioning , spud operating lever/joystick, Dredge pump engaging/disengaging clutch liver to be checked and defects to be rectified and make operational as required as per direction of EIC.

-

-

-

... More
Labour charges

1

75000

75000

... More
Cost of spares (actual bill/invoice + 10%)

-

-

-

... More
Siren/horn make kheraj was reported non operational same to be repaired/serviced, if not reapirable,same to be replaced with newer one as required as per direction of EIC.

-

-

-

... More
Labour charges

1

3000

3000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Emergency fire pump to be serviced including all hose to be change/renewed as required as per direction of EIC.

-

-

-

... More
Labour charge

1

8000

8000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Supply and installation of Tulu pump Hi-Flow S2 Self Priming Monoblock Pump (1 HP) with suction and delievery pipe length fifteen metre as required as per direction of EIC.

1

15000

15000

... More
Supply and fixing up of window / glazing / door curtain in required sizes in the wheel house as required as per direction of EIC.

1

5000

5000

... More
Entire Man hole covers and rubber packing include all door and all air vent & all hatchs/tanks damaged rubber,nuts ,bolts & studes same to be checked, repaired/ renewed by good quality of rubber & ss fittngs as required as per direction of EIC.

-

-

-

... More
Labour charges

1

5000

5000

... More
Cost of spares (actual + 10%)

-

-

-

... More
Replacement of worn out/damaged anchor wire of the swing pulleys as per sample (Swing Winch wire length : 100 mtrs each and dia : 16 mm ); spud lifting and lowering wire, anchor buoy wire (L=50mtr, Dia=16mm) including spud lifting and droping wire to be checked and if required to replaced with same length and steel grade wire rope as required as per direction of EIC.

-

-

-

... More
Labour charges

1

15000

15000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Toilet doors and walls and base is to be strengthened and need to be welded and with channels/plate and completely repaired as required as per direction of EIC.

-

-

-

... More
Labour charges

1

15000

15000

... More
Cost of material(actual+10%)

-

-

-

... More
Servicing of both side anchor winch after renewal of ferrule, and PB Bush for smooth movement of gear as required, checking/ repair of driving gear unit including calibration/ as required for proper operation as per direction of EIC.

-

-

-

... More
Labour charges

2

50000

25000

... More
Cost of material(actual+10%)

-

-

-

... More
Main entrance door of dredger was reported damaged same to be replaced with marine vertical hinged metal doors with proper locking arrangement and fitting to be done and make smoothely operational and rubber beading to be fitted, maintaining the weather I6tightness and watertightness of the door as per direction of EIC.

-

-

-

... More
Labour charges

1

5000

5000

... More
Cost of spares actual + 10% basis

-

-

-

... More
Wooden ply shelf behind wheel house was reported damaged same to be repaired/renewed as required as per direction of EIC.

-

-

-

... More
Labour charges

1

15000

15000

... More
Cost of material(actual+10%)

-

-

-

... More
Invertor [Make: Microtek, 24V, 2.5KVA] for charging and DC power supply is reported non operational same to be repaired and renewed if not repairable as required as per direction of EIC.

-

-

-

... More
Labour charges

1

5000

5000

... More
Cost of spares actual + 10% basis

-

-

-

... More
Truck tyre along with bull dog clamp and wire rope are to be supplied and fitted including labour and material as required as per direction of EIC.

30

75000

2500

... More
Fire extinguishers are expired is to be serviced, hydraulic tested, refilled and made operational after renewal of accessories as required as per direction of EIC.Test certificate to be provided.

-

-

-

... More
DCP type (5kg)

1

3000

3000

... More
Mech foam type (9ltr)

2

6000

3000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.