Eastern Coalfields Limited Tender
With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.
Costs
EMD
₹ 6,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ECL_312275_1Bid Award Id
ViewTender No
ECL/SDPA/AE(EnM)/eT/24-25/747 Dt.03.07.2024Tender Authority
Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.easterncoal.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
After complete refitting of making proper alignment, necessary welding, changing of damaged channel, manually loading and unloading at 4D76L.
8
-
-
Pulling of pump set from 4D76L to 7D76L, installation with proper alignment, suction and delivery pipe line joining etc. and priming.
32
-
-
Pulling of suction & delivery pipe up to 24m towards rise side, pulling of pump set (pump+motor+base frame) from 2D79L to 2D76L (3pillar) and loading in trolley.
16
-
-
After complete refitting of pump, motor on base frame with making proper alignment, necessary welding, changing of damaged channel, manualy loading and unloading at 2D76L.
8
-
-
Pulling of pump set from 2D77L to 2D79L, installation with proper alignment, suction and delivery pipe line joining etc. and priming
24
-
-
Carrying 2nos. Slurry pumps from surface, placing at face in underground, joining delivery and suction pipe, priming etc.
12
-
-
Dismantling of Volcan-6' delivery & suction pipe line, withdrawing, manual pulling of pump motor set after dismantling towards rise & level up to 4D77L from 5D.
24
-
-
Loading in trolley, lifting and unloading both Volcan-6 pump & motor at surface.
8
-
-
Dismantling of 2nos. pump and one motor at 56L pumping station, manual pulling up to 54G and lifting at surface.
24
-
-
Manually withdrawing of 32No. pump and motor up to main line and loading in trolley & unloading at surface.
16
-
-
Manually loading of repaired pump (PL-II4) & motor in trolley, lowering, unloading at 32L main line, pulling up to pumping station and installation.
16
-
-
Requirement of semi-skilled Manpower
-
-
-
Pulling of suction & delivery pipe up to 18m towards rise side, pulling of pump set (pump+motor+base frame) from 7D77L to 4D76L (4pillar) and loading in trolley.
3
-
-
After complete refitting of making proper alignment, necessary welding, changing of damaged channel, manually loading and unloading at 4D76L.
1
-
-
Pulling of pump set from 4D76L to 7D76L, installation with proper alignment, suction and delivery pipe line joining etc. and priming.
4
-
-
Pulling of suction & delivery pipe up to 24m towards rise side, pulling of pump set (pump+motor+base frame) from 2D79L to 2D76L (3pillar) and loading in trolley.
2
-
-
After complete refitting of pump, motor on base frame with making proper alignment, necessary welding, changing of damaged channel, manualy loading and unloading at 2D76L.
1
-
-
Pulling of pump set from 2D77L to 2D79L, installation with proper alignment, suction and delivery pipe line joining etc. and priming
3
-
-
Carrying 2nos. Slurry pumps from surface, placing at face in underground, joining delivery and suction pipe, priming etc.
2
-
-
Dismantling of Volcan-6' delivery & suction pipe line, withdrawing, manual pulling of pump motor set after dismantling towards rise & level up to 4D77L from 5D.
3
-
-
Loading in trolley, lifting and unloading both Volcan-6 pump & motor at surface.
1
-
-
Dismantling of 2nos. pump and one motor at 56L pumping station, manual pulling up to 54G and lifting at surface.
3
-
-
Manually withdrawing of 32No. pump and motor up to main line and loading in trolley & unloading at surface.
2
-
-
Manually loading of repaired pump (PL-II4) & motor in trolley, lowering, unloading at 32L main line, pulling up to pumping station and installation.
2
-
-
Overhead cost & Others
1
-
-
Add: CMPF @ 12%
1
-
-
Add: Bonus @ 8.33%
1
-
-
Add: Pension @ 7%
1
-
-
Total impact of GST for the purpose of CTC
1
-
-