East Central Railway Tender

... More
With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.

East Central Railway - ECR Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Metals and Non-Metals
Ireps
Opening Date2 Apr 2025
Closing Soon24 Apr 2025
Tender Amount₹ 75,54,015 
Notes
Download

Costs

Summary

Electrical Work In Connection With Repairing Of Different Capacity Of Transformer Over See Division.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of copper/brass studs, nuts & washers 5

3

17500

52500

... More
Supply of new tap changer switch with 10%/7.5%- tapping for 750KVA, 33/11KV 6

3

21000

63000

... More
Filtration of oil to increase the BDV as per ISS (Ltr.) 7

9300

15

139500

... More
Credit of released copper wire (To be retained by Contractor)

1320

-

-805200

... More
Opening of transformer tank, lifting of core unit, dismantling of top core, stripping & 1 cleaning of core, re-assembling the transformer with new/old coils including all interconnections withrequired insulation board/paper/tape as required, heating the coil to raise the IR Value to the required level, boxing up with new gasket, filling the transformer with new/re-conditioned oil, replacement of Silca Jel by new one, painting the transformer, commissioning at site, loading, unloading, to & fro transportation to workshop

3

87000

261000

... More
Making/re-winding of HT & LT coils including re-insulation of conductor with DPC/4PC with new Insulation board, block separators & other insulation as required. 3

315

140

44100

... More
Supply of new electrolytic copper Bare conductor. 4

525

1175

616875

... More
Supply of Bushing insulation 11KV. 5

3

3000

9000

... More
Supply of Bushing insulation 415V 6

3

1500

4500

... More
Supply of copper/brass studs, nuts & washers 7

3

8500

25500

... More
Supply of new tap changer switch with 10%/7.5%- tapping. 8

3

8000

24000

... More
Filtration of transformer oil to increase the BDV as per ISS (Ltr.). 9

2550

15

38250

... More
Credit of released copper wire (To be retained by Contractor)

420

-

-256200

... More
Opening of transformer tank, lifting of core unit, dismantling of top core, stripping & cleaning of core, re-assembling the transformer with new/old coils including all interconnections with 1 required insulation board/paper/tape as required, heating the coil to raise the IR Value to the required level, boxing up with new gasket, filling the transformer with new/re-conditioned oil, replacement of Silca Jel by new one, painting the transformer, commissioning at site, loading, unloading, to & fro transportation to workshop.

16

67000

1072000

... More
Making/re-winding of HT & LT coils including re-insulation of conductor with DPC/4PC with new Insulation board, block separators & other insulation as required. 3

1520

110

167200

... More
Supply of new electrolytic copper Bare conductor 4

2240

1175

2632000

... More
Supply of Bushing insulation 11KV 5

16

2500

40000

... More
Supply of Bushing insulation 415V 6

16

1350

21600

... More
Supply of copper/brass studs, nuts & washers 7

16

6800

108800

... More
Supply of new tap changer switch with 10%/7.5%- tapping. 8

16

7000

112000

... More
Filtration of transformer oil to increase the BDV as per ISS (Ltr.) 9

10400

15

156000

... More
Credit of released copper wire (To be retained by Contractor)

1792

-

-1093120

... More
Opening of transformer tank, lifting of core unit, dismantling of top core, stripping &cleaning of core, re-assembling the transformer with new/old coils including all interconnections with required insulation board/paper/tape as required, heating the coil to raise the IR Value to the required level, boxing up with new gasket, filling the transformer with new/re-conditioned oil, replacement of Silca Jel by new one, painting the transformer, commissioning at site, loading, unloading, to & fro transportation to workshop

8

15500

124000

... More
Making/re-winding of HT & LT coils including re-insulation of conductor with DPC/4PC with new Insulation board, block separators & other insulation as required. 3

336

90

30240

... More
Supply of new electrolytic copper Bare conductor. 4

600

1175

705000

... More
Supply of Bushing insulation 11KV. 5

8

700

5600

... More
Supply of Bushing insulation 415V 6

8

700

5600

... More
Supply of copper/brass studs, nuts & washers 7

8

1700

13600

... More
Supply of new tap changer switch with 10%/7.5%- tapping. 8

8

2000

16000

... More
Filtration of transformer oil to increase the BDV as per ISS (Ltr.). 9

2160

15

32400

... More
Credit of released copper wire (To be retained by Contractor)

480

-

-292800

... More
Opening of transformer tank, lifting of core unit, dismantling of top core, stripping & cleaning of core, re-assembling the transformer with new/old coils including all interconnections with 1 required insulation board/paper/tape as required, heating the coil to raise the IR Value to the required level, boxing up with new gasket, filling the transformer with new/re-conditioned oil, replacement of Silca Jel by new one, painting the transformer, commissioning at site, loading, unloading, to & fro transportation to workshop

8

14500

116000

... More
Making/re-winding of HT & LT coils including re-insulation of conductor with DPC/4PC with new Insulation board, block separators & other insulation as required. 3

256

90

23040

... More
Supply of new electrolytic copper Bare conductor. 4

440

1175

517000

... More
Supply of Bushing insulation 11KV. 5

8

700

5600

... More
Supply of Bushing insulation 415V 6

8

700

5600

... More
Supply of copper/brass studs, nuts & washers 7

8

1700

13600

... More
Supply of new tap changer switch with 10%/7.5%- tapping. 8

8

2000

16000

... More
Filtration of transformer oil to increase the BDV as per ISS (Ltr.). 9

1280

15

19200

... More
Credit of released copper wire (To be retained by Contractor)

352

-

-214720



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.